Abstract
The Low Voltage Ride Through (LVRT) is the most important requirement in the grid code regarding the connection of wind farms (WF), it requires that wind turbines (WT) must remain connected to the electrical grid during and after the normally cleared faults. This specification should reflect the true needs for system operation and must be updated depending on the renewable energy (RE) penetration level. The LVRT profile specified in the Moroccan grid code (GC) concerning the connection of WF to the 225KV and 60KV levels is evaluated, particularly after the large scale of RE penetration by 2030. In addition, some suggestions are proposed to update the GC to reflect the real needs of the electrical grid and to improve the stability of the electrical grid based on the critical analysis of the existing GC.