Scheduling coupled-operation jobs with exact time-lags
Authors:
- A. CondottaACA. Condotta
- N.V. ShakhlevichNSN.V. Shakhlevich
- 1 November 2012
- journal article
- Published by Elsevier in Discrete Applied Mathematics
- Vol. 160 (16-17) , 2370-2388
Abstract
No abstract availableKeywords
This publication has 21 references indexed in Scilit:
- Scheduling of coupled tasks with unit processing timesJournal of Scheduling, 2010
- A note on scheduling identical coupled tasks in logarithmic timeDiscrete Applied Mathematics, 2009
- Feasible insertions in job shop scheduling, short cycles and stable setsEuropean Journal of Operational Research, 2007
- Approximation Algorithms for Scheduling Problems with Exact Delays2007
- Approximation algorithms for UET scheduling problems with exact delaysOperations Research Letters, 2006
- Scheduling chains with identical jobs and constant delays on a single machineMathematical Methods of Operations Research, 2005
- An exact algorithm for scheduling identical coupled tasksMathematical Methods of Operations Research, 2004
- Radar pulse interleaving for multi‐target trackingNaval Research Logistics (NRL), 2003
- Multitarget interleaved tracking for phased-array radarIEE Proceedings F Communications, Radar and Signal Processing, 1980
- Optimization and Approximation in Deterministic Sequencing and Scheduling: a Survey1979