Computing the severities of critical onsite assembly risk factors for modular integrated construction projects
- 9 February 2022
- journal article
- research article
- Published by Emerald Publishing in Engineering, Construction and Architectural Management
- Vol. 30 (5) , 1864-1882
Abstract
Purpose: Modular integrated construction (MiC) reengineers the traditional construction process. By introducing factory production and onsite assembly (OA) of modules, MiC reinvents construction projects' uncertainties and risk profiles. The OA stage constitutes the highest end of the MiC delivery and supply chains, where several inherited and symbiotic errors and risk events become realities, negatively impacting the MiC project's success. This study explored the severities of OA risk factors for MiC projects.Design/methodology/approach: A comprehensive literature review, consultation of experts and a questionnaire survey of domain experts were conducted to assess the severity of fifteen OA risk factors for MiC projects. The risk severity index was used to compute and rank the severities of critical OA risk factors for MiC projects, followed by proposed mitigation strategies.Findings: The study revealed that the top five OA risk factors with the severest impact on MiC projects include modules installation discrepancies and errors, poor cooperation among critical onsite stakeholders, a mismatch between production schedules and site conditions, improper lifting equipment selection for onsite installation and site-fit rework due to discrepancies in drawings.Originality/value: This study is the first to offer some important insights into the uncertainties that could compromise the OA objectives of MiC projects. It discussed risk management strategies for known and unknown OA risks and made a unique contribution to the theory, practice, and praxis of MiC supply chain risk management.Keywords
This publication has 25 references indexed in Scilit:
- Risk factors affecting practitioners’ attitudes toward the implementation of an industrialized building systemEngineering, Construction and Architectural Management, 2015
- Evaluation and ranking of risk factors in public–private partnership water supply projects in developing countries using fuzzy synthetic evaluation approachExpert Systems with Applications, 2015
- Risk identification and assessment of modular construction utilizing fuzzy analytic hierarchy process (AHP) and simulationCanadian Journal of Civil Engineering, 2013
- A Guide to the Project Management Body of Knowledge (PMBOK Guide) Fifth EditionProject Management Journal, 2013
- Supply chain management: a review of implementation risks in the construction industryBusiness Process Management Journal, 2012
- Making sense of Cronbach's alphaInternational Journal of Medical Education, 2011
- Aggregated construction supply chains: success factors in implementation of strategic partnershipsSupply Chain Management: An International Journal, 2010
- Understanding the key risks in construction projects in ChinaInternational Journal of Project Management, 2007
- A model for inbound supply risk analysisComputers in Industry, 2006
- Causes of Discrepancies between Design and ConstructionArchitectural Science Review, 2004