Multitree Search for Multisatellite Responsiveness Scheduling Considering Orbital Maneuvering
- 22 November 2021
- journal article
- research article
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Transactions on Aerospace and Electronic Systems
- Vol. 58 (3) , 2206-2217
Abstract
Rapid and responsive earth observation satellites enable the evaluation of disaster risk, improve relief effectiveness, and reduce suffering and fatalities in the event of sudden disaster events.One promising method for responsive space satellites is orbital maneuvering. This paper describes a multi-tree search framework for multi-satellite responsiveness scheduling considering orbital maneuvering, where multiple ground targets are cooperatively observed by multiple observation satellites over a short period of time. Based on the traditional tree search, the proposed method constructs multiple trees and distributes all the targets to multiple satellites, allowing the observation sequence of single satellite to be optimized. To apply the tree search algorithm, a tree node collection (TNC) composed of the corresponding nodes in multiple trees is used to represent the state of each satellite. Before the expansion phase, one specific node in the TNC is determined for later expansion. A beam search is then used to optimize the observation sequence. Ground track adjustment techniques using impulse maneuver are considered for visiting a given target. The proposed framework achieves better performance than the previous best method in a typical multi-satellite responsiveness scheduling problem scenario.Keywords
Funding Information
- National Natural Science Foundation of China (11872223)
This publication has 33 references indexed in Scilit:
- A two-phase scheduling method with the consideration of task clustering for earth observing satellitesComputers & Operations Research, 2013
- An ant colony algorithm for solving fixed destination multi-depot multiple traveling salesmen problemsApplied Soft Computing, 2011
- Satellite scheduling considering maximum observation coverage time and minimum orbital transfer fuel costActa Astronautica, 2010
- Satellite Constellations for Continuous and Early Warning Observation: A Correlation-Based ApproachJournal of Guidance, Control, and Dynamics, 2007
- A heuristic for the multi-satellite, multi-orbit and multi-user management of Earth observation satellitesEuropean Journal of Operational Research, 2007
- A new approach to solving the multiple traveling salesperson problem using genetic algorithmsEuropean Journal of Operational Research, 2006
- Orbit Design for Ground Surveillance Using Genetic AlgorithmsJournal of Guidance, Control, and Dynamics, 2006
- Selecting and scheduling observations of agile satellitesAerospace Science and Technology, 2002
- – Ant SystemFuture Generation Computer Systems, 2000
- Electric Propulsion for Remote Sensing from Low OrbitsJournal of Guidance, Control, and Dynamics, 1999