Cycle-Time Key Factor Identification and Prediction in Semiconductor Manufacturing Using Machine Learning and Data Mining
- 22 February 2011
- journal article
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Transactions on Semiconductor Manufacturing
- Vol. 24 (2) , 237-248
Abstract
Within the complex and competitive semiconductor manufacturing industry, lot cycle time (CT) remains one of the key performance indicators. Its reduction is of strategic importance as it contributes to cost decreasing, time-to-market shortening, faster fault detection, achieving throughput targets, and improving production-resource scheduling. To reduce CT, we suggest and investigate a data-driven approach that identifies key factors and predicts their impact on CT. In our novel approach, we first identify the most influential factors using conditional mutual information maximization, and then apply the selective naive Bayesian classifier (SNBC) for further selection of a minimal, most discriminative key-factor set for CT prediction. Applied to a data set representing a simulated fab, our SNBC-based approach improves the accuracy of CT prediction in nearly 40% while narrowing the list of factors from 182 to 20. It shows comparable accuracy to those of other machine learning and statistical models, such as a decision tree, a neural network, and multinomial logistic regression. Compared to them, our approach also demonstrates simplicity and interpretability, as well as speedy and efficient model training. This approach could be implemented relatively easily in the fab promoting new insights to the process of wafer fabrication.Keywords
This publication has 27 references indexed in Scilit:
- A Bayesian framework to integrate knowledge-based and data-driven inference tools for reliable yield diagnoses2008
- Analysis of Production Control Methods for Semiconductor Research and Development Fabs Using Simulation2006
- Neural-Network-Based Delivery Time Estimates for Prioritized 300-mm Automatic Material Handling OperationsIEEE Transactions on Semiconductor Manufacturing, 2004
- Using discrete event simulation to analyze the impact of job priorities on cycle time in semiconductor manufacturing2002
- Throughput time forecasting model2002
- Cycle-time improvements for photolithography process in semiconductor manufacturingIEEE Transactions on Semiconductor Manufacturing, 2001
- Support vector machine classification and validation of cancer tissue samples using microarray expression dataBioinformatics, 2000
- 10.1162/153244303322753742Applied Physics Letters, 2000
- On the Optimality of the Simple Bayesian Classifier under Zero-One LossMachine Learning, 1997
- Using mutual information for selecting features in supervised neural net learningIEEE Transactions on Neural Networks, 1994