Dispatching ready mixed concrete trucks under demand postponement and weight limit regulation
Authors:
- Pei-Chun LinPLPei-Chun Lin
- Jenhung WangJWJenhung Wang
- Shan-Huen HuangSHShan-Huen Huang
- Yu-Ting WangYWYu-Ting Wang
- 1 October 2010
- journal article
- Published by Elsevier in Automation in Construction
- Vol. 19 (6) , 798-807
Abstract
No abstract availableKeywords
This publication has 12 references indexed in Scilit:
- Hybridization of very large neighborhood search for ready-mixed concrete delivery problemsComputers & Operations Research, 2010
- A Hybrid Solution Approach for Ready-Mixed Concrete DeliveryTransportation Science, 2009
- Markets: Ready-Mixed ConcreteJournal of Economic Perspectives, 2008
- Production scheduling and truck dispatching of ready mixed concreteTransportation Research Part E: Logistics and Transportation Review, 2008
- An optimal scheduling model for ready mixed concrete supply with overtime considerationsAutomation in Construction, 2007
- Genetic algorithms for supply-chain scheduling: A case study in the distribution of ready-mixed concreteEuropean Journal of Operational Research, 2007
- Integrating fmGA and CYCLONE to optimize the schedule of dispatching RMC trucksAutomation in Construction, 2006
- Modeling the ready mixed concrete delivery system with neural networksAutomation in Construction, 2005
- Optimizing the schedule of dispatching RMC trucks through genetic algorithmsAutomation in Construction, 2004
- The effect of age and technological change on motor vehicle emissionsTransportation Research Part D: Transport and Environment, 2001