Calculation method of temporary cable force in incremental launching construction of large span steel box girder without auxiliary pier
Authors:
Open Access
- 4 September 2024
- journal article
- research article
- Published by Springer Nature in Scientific Reports
- Vol. 14 (1) , 1-15
Abstract
The Fenshui River Bridge is a steel–concrete composite girder bridge with a main span of 90 m. Due to the topographical constraints, the steel box girder was constructed without the use of auxiliary piers, employing incremental launching techniques. This article focuses on the construction technology used for the steel box girder of the Fenshui River Bridge. Firstly, using the influence matrix method, the cable force is determined based on the maximum cantilever state of the structure, with the vertical deformation of the front end of the guide beam and the horizontal deformation of the top of the tower as the control objectives. The unstressed cable length is then calculated based on the mechanical relationship between cable deformation and cable force. A calculation method for adaptive cable force is proposed, which is based on the variation of the stress-free cable length within the adaptive structural system. Next, the finite element analysis method was employed to determine the optimal layout position for the tower. The results indicate that during the incremental launching construction of the steel box girder, the calculated cable forces using the method proposed in this paper are in close agreement with the measured cable forces. At the maximum cantilever state of the structure, the calculated and measured values of the cable force resulted in a percentage difference of 3.96%. The calculated values of deformation and stress in key sections showed a percentage difference of 6.4% for deformation and 6.6% for stress. To maximize the effectiveness of the tower and cable, the tower should be positioned above the bridge pier when the guide beam crosses the maximum span. The findings of this paper can serve as a reference for the construction of similar types of bridges.Keywords
This publication has 12 references indexed in Scilit:
- Distributed Detection and Quantification of Cracks in Operating Large BridgesJournal of Bridge Engineering, 2024
- LSTM approach for condition assessment of suspension bridges based on time-series deflection and temperature dataAdvances in Structural Engineering, 2022
- Research on the Overall and Local Mechanical Behaviors of Steel Box Girder Cable-Stayed Bridge via Incremental Launching ConstructionInsight - Civil Engineering, 2020
- A Construction Technique of Incremental Launching for a Continuous Steel Truss Girder Bridge with Suspension Cable Stiffening ChordsStructural Engineering International, 2020
- The Study of Force and the Mechanical Characteristic of Incremental Launching Construction Method on a Steel-Concrete Continuous Beam BridgeJournal of Architectural Research and Development, 2019
- Incremental Launching Construction Control of Long Multispan Composite BridgesJournal of Bridge Engineering, 2015
- Improved Incremental Launching Method for Steel Box Girder2014
- Patch loading and improved measures of incremental launching of steel box girderJournal of Constructional Steel Research, 2012
- Improved Optimization Formulations for Launching Nose of Incrementally Launched Prestressed Concrete BridgesJournal of Bridge Engineering, 2011
- Verification of Incremental Launching Construction Safety for the Ilsun Bridge, the World’s Longest and Widest Prestressed Concrete Box Girder with Corrugated Steel Web SectionJournal of Bridge Engineering, 2011