Multi-period hedging and coordination in a prefabricated construction supply chain
- 31 August 2018
- journal article
- research article
- Published by Taylor & Francis in International Journal of Production Research
- Vol. 57 (7) , 1949-1971
Abstract
In this paper, a multi-period buffer space hedging coordination between a building contractor (BC) and a logistics provider (LP) is investigated. In order to facilitate the application of the construction lead-time hedging (CLTH) strategy, adopted by the BC, extra buffer space needs to be reserved at LP’s intermediate warehouse for contingency usage. This strategy is defined as ‘buffer space hedging (BSH)’ and it increases the pressure of LP on involving extra storage and maintenance cost. Two coordination mechanisms are adopted for solving this BSH problem. One scheme is by introducing a cost-sharing term. A Nash game model is studied to find the individual optimal decisions. Another scheme is a cooperative game model with proper side-payments. We show that adjusting the BSH amount for each review period benefits the supply chain. Both coordination mechanisms enable a win–win outcome. Especially, if system resources are sufficient, the cooperative game outperforms the Nash game. Numerical experiments further demonstrate that the benefit of the proposed model is more significant under the case with lower unit enlarging/rearrangement cost, higher tardiness penalty and unpredictable and uncontrollable construction process-determined assembled and installed prefabs.Keywords
Funding Information
- Zhejiang Provincial
This publication has 56 references indexed in Scilit:
- Project-driven supply chains: integrating safety-stock and crashing decisions for recurrent projectsAnnals of Operations Research, 2012
- Lead-time hedging and coordination between manufacturing and sales departments using Nash and Stackelberg gamesEuropean Journal of Operational Research, 2011
- Simultaneous coordination of order quantity and reorder point in a two-stage supply chainComputers & Operations Research, 2011
- Sustainable performance criteria for construction method selection in concrete buildingsAutomation in Construction, 2010
- Enhancing the logistics of construction materials through activity‐based simulation approachEngineering, Construction and Architectural Management, 2009
- Random yield and uncertain demand in decentralised supply chains under the traditional and VMI arrangementsInternational Journal of Production Research, 2009
- Contracting Under Vendor Managed Inventory Systems Using Holding Cost SubsidiesProduction and Operations Management, 2008
- A quantity discount approach to supply chain coordinationEuropean Journal of Operational Research, 2007
- Analysis of a two-stage telecommunication supply chain with technology dependent demandEuropean Journal of Operational Research, 2007
- Managing uncertainty in major equipment procurement in engineering projectsEuropean Journal of Operational Research, 2006