Advanced Depreciation Cost Analysis for a Commercial Pyroprocess Facility in Korea
Authors:
- Sungki KimSKSungki Kim
- Wonil KoWKWonil Ko
- Saerom YounSYSaerom Youn
- Ruxing GaoRGRuxing Gao
- Yanghon ChungYCYanghon Chung
- Sungsig BangSBSungsig Bang
Open Access
- 1 June 2016
- journal article
- research article
- Published by Elsevier in Nuclear Engineering and Technology
- Vol. 48 (3) , 733-743
Abstract
No abstract availableKeywords
Funding Information
- Ministry of Science, ICT and Future Planning
This publication has 5 references indexed in Scilit:
- Cost analysis of a commercial pyroprocess facility on the basis of a conceptual design in KoreaAnnals of Nuclear Energy, 2015
- Dynamic analysis of once-through and closed fuel cycle economics using Monte Carlo simulationNuclear Engineering and Design, 2014
- Preliminary conceptual design and cost estimation for Korea Advanced Pyroprocessing Facility Plus (KAPF+)Nuclear Engineering and Design, 2014
- The IASB and FASB Stumble over the Annuity Method of DepreciationAccounting in Europe, 2014
- The Evaluation of Leveraged LeasesFinancial Management, 1980