Scheduling n jobs on one machine to minimize the maximum lateness with a minimum number of tardy jobs
Authors:
- 30 September 2001
- journal article
- Published by Elsevier in Computers & Industrial Engineering
- Vol. 40 (4) , 349-360
Abstract
No abstract availableKeywords
This publication has 10 references indexed in Scilit:
- A heuristic procedure to minimize number of tardy jobs and total tardiness in single machine schedulingComputers & Industrial Engineering, 1992
- A greedy heuristic for bicriterion single machine scheduling problemsComputers & Industrial Engineering, 1992
- Algorithms for Scheduling a Single Machine to Minimize the Weighted Number of Late JobsManagement Science, 1988
- Scheduling n jobs on one machine to minimize the maximum tardiness with minimum numberComputers & Operations Research, 1983
- The one-machine sequencing problemEuropean Journal of Operational Research, 1982
- Technical Note—Analysis of a Heuristic for One Machine Sequencing with Release Dates and Delivery TimesOperations Research, 1980
- A note on a scheduling problem with dual criteriaNaval Research Logistics Quarterly, 1975
- On Scheduling with Ready Times and Due Dates to Minimize Maximum LatenessOperations Research, 1975
- A note on the extension of a result on scheduling with secondary criteriaNaval Research Logistics Quarterly, 1972
- An n Job, One Machine Sequencing Algorithm for Minimizing the Number of Late JobsManagement Science, 1968