MULTISTAGE SAFETY STOCK PLANNING WITH ITEM DEMANDS CORRELATED ACROSS PRODUCTS AND THROUGH TIME
Author:
- 1 June 1995
- journal article
- Published by SAGE Publications in Production and Operations Management
- Vol. 4 (2) , 127-144
Abstract
Determining safety stocks in multistage manufacturing systems with serial or divergent structures, where end‐item demands are allowed to be correlated both between products as well as in time, is my focus. I show that these types of correlation have contrary effects on the distribution of safety stocks over the manufacturing stages and that neglecting the correlation of demand can lead to significant deviation from the optimal buffer policy. Using base‐stock control and assuming total reliability for internal supplies, I present a procedure for integrated multilevel safety stock optimization that can be applied to arbitrary serial and divergent systems even when demand is jointly cross‐product and cross‐time correlated. As I demonstrate in an example for autocorrelated demands of a moving average type, there are specific solution properties that drastically reduce the computational effort for safety stock planning. Safety stocks determined in that way can be used as an appropriate protection against demand uncertainties in material requirements planning systems.Keywords
This publication has 16 references indexed in Scilit:
- Safety stocks in multistage divergent inventory systems: A surveyInternational Journal of Production Economics, 1994
- Mehrstufige Sicherheitsbestandsplanung mit dynamischer ProgrammierungOR Spectrum, 1992
- Safety stock optimization in multi-stage inventory systemsInternational Journal of Production Economics, 1991
- Optimal Centralized Ordering Policies in Multi-Echelon Inventory Systems with Correlated DemandsManagement Science, 1990
- Safety stock determination with correlated demands and arbitrary lead timesEuropean Journal of Operational Research, 1988
- An overview of possible procedures for stochastic MRPEngineering Costs and Production Economics, 1982
- Computation of Reorder Levels When the Demands are Correlated and the Lead Time RandomJournal of the Operational Research Society, 1981
- The Significance of Correlated Demands and Variable Lead Times for Stock Control PoliciesJournal of the Operational Research Society, 1980
- Convex Analysis1970
- Optimal Policies for a Multi-Echelon Inventory ProblemManagement Science, 1960