Fatigue life estimation after crack repair in 6005 A‐T6 aluminium alloy using the cold expansion hole technique
Authors:
- 17 November 2000
- journal article
- Published by Wiley in Fatigue & Fracture of Engineering Materials & Structures
- Vol. 23 (11) , 911-916
Abstract
In this paper, the hole drilling (HD) and the cold expansion (CE) processes, which were used as a technique for crack repair, were investigated in order to estimate the beneficial effects on fatigue crack initiation (FCI). The FCI life is defined as the number of cycles to initiate a new crack of 0.2 mm on the surface of the specimen. Three hole radii and three degrees of cold expansion (DCE%) values were tested after a crack propagation period. Crack retardation after the CE process was observed. This phenomenon is due to two mechanisms: retardation owing to both geometric and mechanical effects, which is produced by the stress concentration at the drilled hole, and the large strain‐induced compressive residual stresses around the hole. In this report, the influence of the loading conditions was studied. For high values of the stress intensity factor range ΔKρ around the hole (based on the pseudo crack length a + ρ), the number of cycles corresponding to crack initiation Ni is low. At the edge of the hole, the maximum stress range can be approximated by the following formula: Δσmax = 2ΔKρ /√πρ , where ρ is the hole radius and ΔKρ is the related stress intensity factor range.The FCI life extension, defined by the number of cycles corresponding to crack re‐initiation Ni , is related to the relative maximum stress range ratio Rσ = [(Δσmax )/(Δσmax )th ] where (Δσmax )th is the value of the threshold maximum stress range obtained when Ni = 2 × 106 cycles. The relationship between Ni and Rσ may be written as a power function.Keywords
This publication has 15 references indexed in Scilit:
- Fatigue damage repair: a comparison of some possible methodsInternational Journal of Fatigue, 1996
- Comparison of fatigue crack retardation methodsEngineering Failure Analysis, 1996
- A new approach to the prediction of fatigue notch reduction factor KfInternational Journal of Fatigue, 1996
- CRACK GROWTH ARRESTING PROPERTY OF A HOLE AND BRINELL‐TYPE DIMPLEFatigue & Fracture of Engineering Materials & Structures, 1996
- EFFECT OF RE‐COLD WORKING ON FATIGUE LIFE ENHANCEMENT OF A FASTENER HOLEFatigue & Fracture of Engineering Materials & Structures, 1995
- ANALYSIS AND TESTING OF SURFACE COLD-WORK PROCEDURES APPLIED TO NOTCHED, FLAT ELEMENTSFatigue & Fracture of Engineering Materials & Structures, 1994
- THE EFFECT OF INTERMEDIATE HEAT TREATMENTS ON OVERLOAD INDUCED RETARDATIONS DURING FATIGUE CRACK GROWTH IN AN Al‐ALLOYFatigue & Fracture of Engineering Materials & Structures, 1992
- EFFECTS OF COLD EXPANSION OF A HOLE ON FATIGUE CRACK INITIATION LOCATION AND LIFE OF AN LY12CZ ALLOYFatigue & Fracture of Engineering Materials & Structures, 1992
- Enhanced Stop-Drill Repair Procedure for Cracked Structures1986
- Fracture mechanics approach to fatigue crack initiation from deep notchesEngineering Fracture Mechanics, 1983