TBM construction process simulation and performance optimization
Authors:
- 19 May 2010
- journal article
- research article
- Published by Springer Nature in Transactions of Tianjin University
- Vol. 16 (3) , 194-202
Abstract
No abstract availableKeywords
This publication has 8 references indexed in Scilit:
- Geotechnical risk assessment based approach for rock TBM selection in difficult ground conditionsTunnelling and Underground Space Technology, 2008
- Disc cutting tests in Colorado Red Granite: Implications for TBM performance predictionInternational Journal of Rock Mechanics and Mining Sciences, 2007
- Experimental and Numerical Studies on Rock Breaking with TBM Tools under High Stress ConfinementRock Mechanics and Rock Engineering, 2006
- Modelling TBM performance with artificial neural networksTunnelling and Underground Space Technology, 2004
- Risk-Sensitive Decision Support System for Tunnel Construction2004
- Expert System for Applicability of Tunnel Boring Machines in JapanRock Mechanics and Rock Engineering, 2003
- TBM performance estimation using rock mass classificationsInternational Journal of Rock Mechanics and Mining Sciences, 2002
- Geologic Prediction Model for TunnelingJournal of Construction Engineering and Management, 1987