Bi-objective parallel machines scheduling with sequence-dependent setup times using hybrid metaheuristics and weighted min–max technique
- 9 December 2010
- journal article
- Published by Springer Nature in Soft Computing
- Vol. 15 (7) , 1313-1331
Abstract
No abstract availableKeywords
This publication has 65 references indexed in Scilit:
- Parallel dedicated machine scheduling problem with sequence-dependent setups and a single serverComputers & Industrial Engineering, 2010
- An evolutionary simulation–optimization approach in solving parallel-machine scheduling problems – A case studyComputers & Industrial Engineering, 2009
- Unrelated parallel machine scheduling with setup times using simulated annealingRobotics and Computer-Integrated Manufacturing, 2002
- Nonlinear Multiobjective OptimizationJournal of the Operational Research Society, 2000
- Minimizing the sum of job earliness and tardiness in a multimachine systemInternational Journal of Production Research, 1998
- Bicriteria scheduling problem for unrelated parallel machinesComputers & Industrial Engineering, 1996
- A new simulated annealing algorithmInternational Journal of Computer Mathematics, 1995
- Addressing the gap in scheduling research: a review of optimization and heuristic methods in production schedulingInternational Journal of Production Research, 1993
- Equivalence of mean flow time problems and mean absolute deviation problemsOperations Research Letters, 1990
- Optimization by Simulated AnnealingScience, 1983