A robust algorithm for deadline-constrained task scheduling in small satellite clusters
Authors:
- 29 September 2016
- conference paper
- Published by Institute of Electrical and Electronics Engineers (IEEE)
- Vol. 5, 1769-1774
Abstract
Task scheduling is one of the core steps to efficiently complete space missions with limited resources in small satellite clusters. This problem becomes more complicated when taking various uncertainties into consideration. In this paper, a heuristic robust task scheduling algorithm (RTSA) that handles performance variations of small satellites and task failures has been proposed. An initial solution is obtained by grouping tasks into partial critical paths (PCPs). Then three heuristic strategies and an evaluation function are introduced to improve the schedule iteratively. During this process, the robustness of RTSA is achieved by adding slack time and duplicating critical tasks judiciously. By simulating the Small Satellite Cluster environment and building task failure model, experimental results show that RTSA provides robust and fault-tolerant schedule while minimizing the makespan.Keywords
This publication has 15 references indexed in Scilit:
- Robust Scheduling of Scientific Workflows with Deadline and Budget Constraints in Clouds2014
- Heterogeneous Delay Tolerant Task Scheduling and Energy Management in the Smart Grid with Renewable EnergyIEEE Journal on Selected Areas in Communications, 2013
- An open-source scheduler for small satellites2013
- Cost-Driven Scheduling of Grid Workflows Using Partial Critical PathsIEEE Transactions on Parallel and Distributed Systems, 2011
- Robust task scheduling in non-deterministic heterogeneous computing systems2006
- Project scheduling under uncertainty: Survey and research potentialsEuropean Journal of Operational Research, 2005
- A fuzzy robust scheduling approach for product development projectsEuropean Journal of Operational Research, 2004
- Fundamentals of fault-tolerant distributed computing in asynchronous environmentsACM Computing Surveys, 1999
- ROBUSTNESS MEASURES AND ROBUST SCHEDULING FOR JOB SHOPSIIE Transactions, 1994
- Optimization and Approximation in Deterministic Sequencing and Scheduling: a Survey1979