Application of the Risk Matrix Method for Geotechnical Risk Analysis and Prediction of the Advance Rate in Rock TBM Tunneling
- 14 August 2013
- journal article
- research article
- Published by Springer Nature in Rock Mechanics and Rock Engineering
- Vol. 47 (5) , 1951-1960
Abstract
No abstract availableKeywords
This publication has 30 references indexed in Scilit:
- Study of various models for estimation of penetration rate of hard rock TBMsTunnelling and Underground Space Technology, 2012
- Zu den Felsklassifikationen mit Indexwerten im Tunnelbaugeotechnik, 2012
- Modelling TBM performance with artificial neural networksTunnelling and Underground Space Technology, 2004
- A methodology for assessing geotechnical hazards for TBM tunnelling—illustrated by the Athens Metro, GreeceInternational Journal of Rock Mechanics and Mining Sciences, 2004
- Guidelines for tunnelling risk management: International Tunnelling Association, Working Group No. 2Tunnelling and Underground Space Technology, 2004
- Risk Assessment Methodology for Underground Construction ProjectsJournal of Construction Engineering and Management, 2004
- Tunneling in fault zones, Tuzla tunnel, TurkeyTunnelling and Underground Space Technology, 2003
- Risk and risk analysis in rock engineeringTunnelling and Underground Space Technology, 1996
- The squeezing potential of rocks around tunnels; Theory and predictionRock Mechanics and Rock Engineering, 1993
- Engineering classification of rock masses for the design of tunnel supportRock Mechanics and Rock Engineering, 1974