Relative train length and the infrastructure required to mitigate delays from operating combinations of normal and over-length freight trains on single-track railway lines in North America
Authors:
- 19 November 2018
- journal article
- research article
- Published by SAGE Publications in Proceedings of the Institution of Mechanical Engineers, Part F: Journal of Rail and Rapid Transit
- Vol. 233 (7) , 731-742
Abstract
Distributed power locomotives have facilitated longer heavy-haul freight trains that improve the efficiency of railway operations. In North America, where the majority of mainlines are single track, the potential operational and economic advantages of long trains are limited by the inadequate length of many existing passing sidings (passing loops). To alleviate the challenge of operating trains that exceed the length of passing sidings, railways preserve the mainline capacity by extending passing sidings. However, industry practitioners rarely optimize the extent of infrastructure investment for the volume of over-length train traffic on a particular route. This paper investigates how different combinations of normal and over-length trains, and their relative lengths, relate to the number of siding extensions necessary to mitigate the delay performance of over-length train operation on a single-track rail corridor. The experiments used Rail Traffic Controller simulation software to determine train delay for various combinations of short and long train lengths under different directional distributions of a given daily railcar throughput volume. Simulation results suggest a relationship between the ratio of train lengths and the infrastructure expansion required to eliminate the delay introduced by operating over-length trains on the initial route. Over-length trains exhibit delay benefits from siding extensions while short trains are relatively insensitive to the expanded infrastructure. Assigning directional preference to over-length trains improves the overall average long-train delay at the expense of delay to short trains. These results will allow railway practitioners to make more informed decisions on the optimal incremental capital expansion strategy for the operation of over-length trains.Keywords
This publication has 11 references indexed in Scilit:
- Analyzing the transition from single- to double-track railway lines with nonlinear regression analysisProceedings of the Institution of Mechanical Engineers, Part F: Journal of Rail and Rapid Transit, 2016
- Operational Schedule Flexibility and Infrastructure Investment: Capacity Trade-Off on Single-Track RailwaysTransportation Research Record: Journal of the Transportation Research Board, 2016
- Railroad capacity tools and methodologies in the U.S. and EuropeJournal of Modern Transportation, 2015
- Capacity of Single-Track Railway Lines with Short Sidings to Support Operation of Long Freight TrainsTransportation Research Record: Journal of the Transportation Research Board, 2015
- Siding Spacing and the Incremental Capacity of the Transition From Single to Double Track2014
- Comparison of Capacity of Single- and Double-Track Rail LinesTransportation Research Record: Journal of the Transportation Research Board, 2013
- Impact of New Railway Technology on Grain Transportation in Western CanadaTransportation Research Record: Journal of the Transportation Research Board, 2001
- Parametric modeling in rail capacity planning1999
- Service-cost tradeoffs for carload freight traffic in the U.S. rail industryTransportation Research Part A: General, 1991
- Expansion of Canadian National Railway’s Line CapacityInterfaces, 1986