Practical seismic upgrade strategy for substation equipment based on performance indices
- 30 August 2006
- journal article
- Published by Wiley in Earthquake Engineering & Structural Dynamics
- Vol. 36 (2) , 209-226
Abstract
This paper presents an upgrade strategy for substation equipment under seismic risk. In Japan, existing old equipment does not often meet the present seismic design standards and the seismic damage is concentrated on such old equipment. This problem is widely recognized as a typical feature of advanced countries. The proposed method helps managerial decisions pertaining to the prioritizing of upgrading the huge number of existing equipment. In order to prioritize the equipment to be upgraded, practitioners have discussed it from various points of view including earthquake resistant capacity of equipment, seismic performance of whole power system and cost effectiveness of equipment upgrading. Thus, the proposed method consists of four different performance indices to quantitatively evaluate these factors. For numerical examples, the proposed method is applied to a hypothetical power system to discuss the advantages and disadvantages of the proposed indices. Copyright © 2006 John Wiley & Sons, Ltd.Keywords
This publication has 4 references indexed in Scilit:
- Benefit Cost Analysis for Renewal Planning of Existing Electric Power Equipment2004
- Structural upgrading strategy for electric power networks under seismic actionEarthquake Engineering & Structural Dynamics, 2000
- NEW ATTENUATION RELATIONSHIPS FOR PEAK GROUND ACCELERATION AND VELOCITY CONSIDERING EFFECTS OF FAULT TYPE AND SITE CONDITIONJournal of Structural and Construction Engineering (Transactions of AIJ), 1999
- A physically-based earthquake recurrence model for estimation of long-term earthquake probabilities1999