Scheduling jobs and maintenance activities on parallel machines
- 18 December 2012
- journal article
- research article
- Published by Springer Nature in Operational Research
- Vol. 13 (3) , 363-383
Abstract
No abstract availableKeywords
This publication has 21 references indexed in Scilit:
- Strongly Fully Polynomial Time Approximation Scheme for the two-parallel capacitated machines scheduling problemInternational Journal of Planning and Scheduling, 2011
- Identical parallel-machine scheduling under availability constraints to minimize the sum of completion timesEuropean Journal of Operational Research, 2009
- Fully polynomial time approximation scheme for the weighted flow-time minimization on a single machine with a fixed non-availability intervalComputers & Industrial Engineering, 2009
- Worst-case analysis of the WSPT and MWSPT rules for single machine scheduling with one planned setup periodEuropean Journal of Operational Research, 2008
- Approximation algorithms for single machine scheduling with one unavailability period4OR, 2008
- Approximation algorithm for the weighted flow-time minimization on a single machine with a fixed non-availability intervalComputers & Industrial Engineering, 2008
- An improved approximation algorithm for the single machine total completion time scheduling problem with availability constraintsEuropean Journal of Operational Research, 2005
- Scheduling with limited machine availabilityEuropean Journal of Operational Research, 2000
- Scheduling jobs and maintenance activities on parallel machinesNaval Research Logistics (NRL), 2000
- Various optimizers for single‐stage productionNaval Research Logistics Quarterly, 1956