Processes and forms of an unstable alluvial system with resistant, cohesive streambeds
- 24 June 2002
- journal article
- research article
- Published by Wiley in Earth Surface Processes and Landforms
- Vol. 27 (7) , 699-718
Abstract
As a response to channelization projects undertaken near the turn of the 20th century and in the late 1960s, upstream reaches and tributaries of the Yalobusha River, Mississippi, USA, have been rejuvenated by upstream‐migrating knickpoints. Sediment and woody vegetation delivered to the channels by mass failure of streambanks has been transported downstream to form a large sediment/debris plug where the downstream end of the channelized reach joins an unmodified sinuous reach. Classification within a model of channel evolution and analysis of thalweg elevations and channel slopes indicates that downstream reaches have equilibrated but that upstream reaches are actively degrading.The beds of degrading reaches are characterized by firm, cohesive clays of two formations of Palaeocene age. The erodibility of these clay beds was determined with a jet‐test device and related to critical shear stresses and erosion rates. Repeated surveys indicated that knickpoint migration rates in these clays varied from 0·7 to 12 m a−1, and that these rates and migration processes are highly dependent upon the bed substrate. Resistant clay beds of the Porters Creek Clay formation have restricted advancement of knickpoints in certain reaches and have caused a shift in channel adjustment processes towards bank failures and channel widening. Channel bank material accounts for at least 85 per cent of the material derived from the channel boundaries of the Yalobusha River system.Strategies to reduce downstream flooding problems while preventing upstream erosion and land loss are being contemplated by action agencies. One such proposal involves removal of the sediment/debris plug. Bank stability analyses that account for pore‐water and confining pressures have been conducted for a range of hydrologic conditions to aid in predicting future channel response. If the sediment/debris plug is removed to improve downstream drainage, care should be taken to provide sufficient time for drainage of groundwater from the channel banks so as not to induce accelerated bank failures. Published in 2002 John Wiley & Sons, Ltd.Keywords
This publication has 25 references indexed in Scilit:
- Pore‐water pressure effects on the detachment of cohesive streambeds: seepage forces and matric suctionEarth Surface Processes and Landforms, 2001
- Fluvial geomorphological analysis of the recruitment of large woody debris in the Yalobusha River network, Central Mississippi, USAGeomorphology, 2001
- Erodibility of cohesive streambeds in the loess area of the midwestern USAHydrological Processes, 2001
- Bank and near-bank processes in an incised channelGeomorphology, 2000
- CHANNEL INSTABILITY IN THE LOESS AREA OF THE MIDWESTERN UNITED STATES1Jawra Journal of the American Water Resources Association, 2000
- Stability of streambanks formed in partially saturated soils and effects of negative pore water pressures: the Sieve River (Italy)Geomorphology, 1999
- Process-form interactions in unstable sand-bed river channels: A numerical modeling approachGeomorphology, 1997
- Energy, time, and channel evolution in catastrophically disturbed fluvial systemsGeomorphology, 1992
- A model of channel response in disturbed alluvial channelsEarth Surface Processes and Landforms, 1989
- The shear strength of unsaturated soilsCanadian Geotechnical Journal, 1978