Risk in Ultimate Pit Selection
Open Access
- 21 February 2024
- journal article
- research article
- Published by Springer Nature in Mining, Metallurgy & Exploration
- Vol. 41 (2) , 589-605
Abstract
The basis for the selection of the ultimate pit for an open pit mining operation is generally opaque. Some form of value-based analysis will generally guide the final decision; however, the value will often gradually plateau whilst the ultimate pit size continues to increase. There is no established framework to guide specialists in the selection of the ultimate pit, with such decisions regularly made on a somewhat arbitrary basis. The key component that is missing from the analyses typically used to select the size of the ultimate pit is risk. Once risk is quantified within the analysis framework, the decision-making range is significantly reduced, and the process for selecting the ultimate pit becomes more consistent, replicable, and defensible. This paper provides an approach to including risk in the process used to select the ultimate pit.Keywords
Funding Information
- The University of Queensland
This publication has 10 references indexed in Scilit:
- Using Grade Uncertainty to Quantify Risk in the Ultimate Pit Design for the Sadiola Deep Sulfide Prefeasibility Project, Mali, West Africa2018
- Direct Net Present Value Open Pit Optimisation with Probabilistic Models2018
- Perspectives on strategic finance2017
- Uncertainty Representation Method for Open Pit Optimization Results Due to Variation in Mineral PricesMinerals, 2016
- Post-pit optimization strategic alignmentJournal of the Southern African Institute of Mining and Metallurgy, 2016
- Optimized open pit mine design, pushbacks and the gap problem—a reviewJournal of Mining Science, 2014
- A risk quantification framework for strategic mine planning: Method and applicationJournal of Mining Science, 2011
- Integrated open pit pushback selection and production capacity optimizationJournal of Mining Science, 2011
- The Pseudoflow Algorithm: A New Algorithm for the Maximum-Flow ProblemOperations Research, 2008
- Mine design selection under uncertaintyMining Technology: Transactions of the Institutions of Mining and Metallurgy, 2008