Masami Sugiura
Research Subjects
Research Interests
Masami Sugiura has a total of 7 co-authors. Here are the top co-authors by number of shared publications:
- Abdul Bari
Faculty of Engineering, University of Peradeniya, Peradeniya, 20400, Sri Lanka
1 shared publication - Chandana Dinesh Parape
Kyoto University
1 shared publication - Chinthaka Premachandra
Tokyo University of Science
1 shared publication - Duminda Welikanna
Graduate School of Engineering, Kyoto University, Kyoto, 615-8540, Japan
1 shared publication - Masayuki Tamura
Kyoto University, Kyoto, Japan
1 shared publication - Ranjith Disanayake
Faculty of Engineering, University of Peradeniya, Peradeniya, 20400, Sri Lanka
1 shared publication
Latest Publications
- Open Access
- 31 January 2013
- Published by MDPI AG in Sustainability
- Vol. 5 (2) , 456-477
Building Damage and Business Continuity Management in the Event of Natural Hazards: Case Study of the 2004 Tsunami in Sri Lanka
The Sumatra Earthquake and Indian Ocean Tsunami event on the 26 December 2004 has provided a unique and valuable opportunity to evaluate the performance of various structures, facilities and lifeline systems during the tsunami wave attacks. There are especial ly meaningful observations concerning the structural changes due to the tsunami forces, which open up a wide area of research to develop the mitigation procedure. The business restoration process of business companies in terms of buildings, facilities and lifelines have shown greater research interest. In this study, we investigate d the restoration process of business sectors in East and S outh coastal region in Sri Lanka after the 2004 Indian Ocean Tsunami . A field survey was conducted in East and S outh coast of Sri Lanka, in order to study the affecting parameters to damage assessment in the restoration process of the business companies. T he results of the questionnaire-based field survey are then compared with the statistical analysis results . Finally, the factors affecting the restoration process after the tsunami are identified. As a main conclusion, financial support could be the most important reason for delay s in restoration. Moreover, i t has been observed that the tsunami inundation level of higher than one meter may have had more effect concerning the damage to the structures and requires additional time for restoration than other areas .
- 31 January 2013
- Published by MDPI AG in Sustainability
- Vol. 5 (2) , 456-477
Open AccessBuilding Damage and Business Continuity Management in the Event of Natural Hazards: Case Study of the 2004 Tsunami in Sri Lanka
The Sumatra Earthquake and Indian Ocean Tsunami event on the 26 December 2004 has provided a unique and valuable opportunity to evaluate the performance of various structures, facilities and lifeline systems during the tsunami wave attacks. There are especial ly meaningful observations concerning the structural changes due to the tsunami forces, which open up a wide area of research to develop the mitigation procedure. The business restoration process of business companies in terms of buildings, facilities and lifelines have shown greater research interest. In this study, we investigate d the restoration process of business sectors in East and S outh coastal region in Sri Lanka after the 2004 Indian Ocean Tsunami . A field survey was conducted in East and S outh coast of Sri Lanka, in order to study the affecting parameters to damage assessment in the restoration process of the business companies. T he results of the questionnaire-based field survey are then compared with the statistical analysis results . Finally, the factors affecting the restoration process after the tsunami are identified. As a main conclusion, financial support could be the most important reason for delay s in restoration. Moreover, i t has been observed that the tsunami inundation level of higher than one meter may have had more effect concerning the damage to the structures and requires additional time for restoration than other areas .