Thomas Cosker
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Previous Organizations / Institutes
The organizations / institutes from the scholar's other articles in the past ten years
Research Subjects
Thomas Cosker has a total of 16 co-authors. Here are the top co-authors by number of shared publications:
A Boppana
Wycombe Hospital, South Buckinghamshire NHS Trust, Buckinghamshire, UK
1 shared publicationA Ghandour
Department of Trauma and Orthopaedics, West Wales General Hospital Carmarthen, UK
1 shared publicationA.D. Mendonca
Morriston Hospital, Swansea, UK
1 shared publicationK Visvakumar
Department of Trauma and Orthopaedics, West Wales General Hospital Carmarthen, UK
1 shared publicationK Wong
Wycombe Hospital, South Buckinghamshire NHS Trust, Queen Alexandra Road, High Wycombe, Buckinghamshire HP11 2TT, UK
1 shared publicationK.J.J. Tayton
Royal Gwent Hospital, Newport, Gwent, UK
1 shared publication
Latest Publications
- Open Access
- 1 October 2006
- Published by Royal College of Surgeons of England in The Annals of The Royal College of Surgeons of England
- Vol. 88 (6) , 540-542
Does it Matter Whom You See?–A Fracture Clinic Audit
INTRODUCTION A consultant-led service for trauma in the UK has become the accepted norm. Practice in fracture clinics may vary widely between consultants and has an impact on the number of patients seen and, therefore, the time devoted to each patient. PATIENTS AND METHODS A total of 945 patients attending our unit's fracture clinics were analysed over a 6-week period, representing one complete cycle of our trauma system. RESULTS The overall discharge rate was 38% but this differed significantly between consultants. Patients re-presenting for the same complaint were evenly distributed between those discharging aggressively and those re-reviewing regularly. CONCLUSIONS Re-reviewing patients has a significant impact on the number of patients seen in future clinics and, therefore, the time that can be devoted to each patient, individual consultant workload and teaching of junior staff. Since the re-presentation rate between those discharging aggressively and those re-reviewing more frequently was the same, discharge protocols are recommended for common trauma conditions to standardise the process. Specialist clinics are recommended for more complex trauma cases.
- 1 October 2006
- Published by Royal College of Surgeons of England in The Annals of The Royal College of Surgeons of England
- Vol. 88 (6) , 540-542
Open AccessDoes it Matter Whom You See?–A Fracture Clinic Audit
INTRODUCTION A consultant-led service for trauma in the UK has become the accepted norm. Practice in fracture clinics may vary widely between consultants and has an impact on the number of patients seen and, therefore, the time devoted to each patient. PATIENTS AND METHODS A total of 945 patients attending our unit's fracture clinics were analysed over a 6-week period, representing one complete cycle of our trauma system. RESULTS The overall discharge rate was 38% but this differed significantly between consultants. Patients re-presenting for the same complaint were evenly distributed between those discharging aggressively and those re-reviewing regularly. CONCLUSIONS Re-reviewing patients has a significant impact on the number of patients seen in future clinics and, therefore, the time that can be devoted to each patient, individual consultant workload and teaching of junior staff. Since the re-presentation rate between those discharging aggressively and those re-reviewing more frequently was the same, discharge protocols are recommended for common trauma conditions to standardise the process. Specialist clinics are recommended for more complex trauma cases.
- 1 September 2006
- Published by BMJ in Emergency Medicine Journal
- Vol. 23 (9) , 709-712
Preparation for the next major incident: are we ready?
Background: In 1996, Carley and Mackway-Jones examined British hospital’s readiness for a major incident. In the light of recent terrorist events in London, our group has re-visited the issue and conducted a telephone survey of relevant parties to investigate whether the situation has changed almost 10 years on. Materials and Methods: A proforma was devised, and registrars in anaesthesia, accident and emergency medicine, general surgery and trauma and orthopaedics were telephoned in trauma units across the UK and questioned about their readiness to respond to a major incident. Major incident co-ordinators for each of the units were contacted, and their planning, readiness, training opportunities, and recent rehearsals were assessed. Results: A total of 179 registrars were contacted in 34 different units throughout Britain. One hundred and forty four responses were obtained. Sixty eight registrars (47%) had not read any of their hospitals major incident plan. Only 77 (54%) of the registrars questioned felt confident in the knowledge of their specific role during a major incident. Major incident co-ordinators were contacted at 34 hospitals, and 17 responses obtained. It was remarkably difficult to achieve even that level of response. Rehearsal of major incident plans varied widely between hospitals with 82% of hospitals having practised within the past five years but only 35% were planning for a rehearsal in the next twelve months. 25% of hospitals that responded did not hold any teaching on major incident planning at their introduction sessions for junior and middle grade doctors. Limitations to improvement of major incident planning included: lack of funds, lack of a designated full-time major incident co-ordinator, and lack of technology. There was no significant difference between units within London and those in other regions. Discussion: Preparedness for major incidents in the UK remains poor 10 years after Carley and Mackway-Jones examined the issue. Effective major incident plans require forethought, organisation, briefing of relevant staff and regular rehearsal. Increased resources should be provided for this at a local level and more regular rehearsals undertaken to ensure our preparedness for future major incidents.
- 1 September 2006
- Published by BMJ in Emergency Medicine Journal
- Vol. 23 (9) , 709-712
Preparation for the next major incident: are we ready?
Background: In 1996, Carley and Mackway-Jones examined British hospital’s readiness for a major incident. In the light of recent terrorist events in London, our group has re-visited the issue and conducted a telephone survey of relevant parties to investigate whether the situation has changed almost 10 years on. Materials and Methods: A proforma was devised, and registrars in anaesthesia, accident and emergency medicine, general surgery and trauma and orthopaedics were telephoned in trauma units across the UK and questioned about their readiness to respond to a major incident. Major incident co-ordinators for each of the units were contacted, and their planning, readiness, training opportunities, and recent rehearsals were assessed. Results: A total of 179 registrars were contacted in 34 different units throughout Britain. One hundred and forty four responses were obtained. Sixty eight registrars (47%) had not read any of their hospitals major incident plan. Only 77 (54%) of the registrars questioned felt confident in the knowledge of their specific role during a major incident. Major incident co-ordinators were contacted at 34 hospitals, and 17 responses obtained. It was remarkably difficult to achieve even that level of response. Rehearsal of major incident plans varied widely between hospitals with 82% of hospitals having practised within the past five years but only 35% were planning for a rehearsal in the next twelve months. 25% of hospitals that responded did not hold any teaching on major incident planning at their introduction sessions for junior and middle grade doctors. Limitations to improvement of major incident planning included: lack of funds, lack of a designated full-time major incident co-ordinator, and lack of technology. There was no significant difference between units within London and those in other regions. Discussion: Preparedness for major incidents in the UK remains poor 10 years after Carley and Mackway-Jones examined the issue. Effective major incident plans require forethought, organisation, briefing of relevant staff and regular rehearsal. Increased resources should be provided for this at a local level and more regular rehearsals undertaken to ensure our preparedness for future major incidents.
- 1 January 2005
- Published by Mark Allen Group in Journal of Wound Care
- Vol. 14 (1) , 27-29
Choice of dressing has a major impact on blistering and healing outcomes in orthopaedic patients
Objective: To investigate the effect of three postoperative dressings on orthopaedic wound healing. Method: Three hundred orthopaedic patients were divided into three treatment groups and allocated to management with one of three dressings: Primapore, Tegaderm with pad, and OpSite Post-Op. Staff completed a questionnaire to evaluate the wound progression. Outcome measures were the presence of infection, blistering and the number of dressing changes required. Results: There was a significantly lower incidence of blistering with OpSite Post-Op (6%) than Tegaderm with pad (16%) and Primapore (24%) (p<0.001). Patients in the OpSite Post-Op group had the lowest exudate levels. Conclusion: Dressings that employ a clear film and have a high moisture vapour transmission rate have been shown to reduce both the rate of blistering and wound discharge. The additional expense inherent in using such dressings may, in reality, prove cost-effective because of the reduced need for dressings changes and the subsequent earlier discharge of these patients from hospital with an uncomplicated wound. Declaration of interest: All dressings were supplied by the manufacturers. However, they had no contact with the wards or the authors once the study started.
- 1 January 2005
- Published by Mark Allen Group in Journal of Wound Care
- Vol. 14 (1) , 27-29
Choice of dressing has a major impact on blistering and healing outcomes in orthopaedic patients
Objective: To investigate the effect of three postoperative dressings on orthopaedic wound healing. Method: Three hundred orthopaedic patients were divided into three treatment groups and allocated to management with one of three dressings: Primapore, Tegaderm with pad, and OpSite Post-Op. Staff completed a questionnaire to evaluate the wound progression. Outcome measures were the presence of infection, blistering and the number of dressing changes required. Results: There was a significantly lower incidence of blistering with OpSite Post-Op (6%) than Tegaderm with pad (16%) and Primapore (24%) (p<0.001). Patients in the OpSite Post-Op group had the lowest exudate levels. Conclusion: Dressings that employ a clear film and have a high moisture vapour transmission rate have been shown to reduce both the rate of blistering and wound discharge. The additional expense inherent in using such dressings may, in reality, prove cost-effective because of the reduced need for dressings changes and the subsequent earlier discharge of these patients from hospital with an uncomplicated wound. Declaration of interest: All dressings were supplied by the manufacturers. However, they had no contact with the wards or the authors once the study started.