CRChristian Rosén

Christian Rosén

*This is an algorithmically generated author record based on publicly available information.

Current Organizations / Institutes

The organizations/institutes from the scholar's latest article


Christian Rosén has a total of 37 co-authors. Here are the top co-authors by number of shared publications:


Latest Publications

  • Combining multiway principal component analysis (MPCA) and clustering for efficient data mining of historical data sets of SBR processes

    by Kris Villez, Magda Ruiz, Gürkan Sin, Joan Colomer, Christian Rosén, Peter A. Vanrolleghem

    A methodology based on Principal Component Analysis (PCA) and clustering is evaluated for process monitoring and process analysis of a pilot-scale SBR removing nitrogen and phosphorus. The first step of this method is to build a multi-way PCA (MPCA) model using the historical process data. In the second step, the principal scores and the Q-statistics resulting from the MPCA model are fed to the LAMDA clustering algorithm. This procedure is iterated twice. The first iteration provides an efficient and effective discrimination between normal and abnormal operational conditions. The second iteration of the procedure allowed a clear-cut discrimination of applied operational changes in the SBR history. Important to add is that this procedure helped identifying some changes in the process behaviour, which would not have been possible, had we only relied on visually inspecting this online data set of the SBR (which is traditionally the case in practice). Hence the PCA based clustering methodology is a promising tool to efficiently interpret and analyse the SBR process behaviour using large historical online data sets.


  • Qualitative representation of trends: an alternative approach to process diagnosis and control

    by K. Villez, C. Rosén, F. Anctil, C. Duchesne, P. A. Vanrolleghem

    The potential for qualitative representation of trends in the context of process diagnosis and control is evaluated in this paper. The technique for qualitative description of the data series is relatively new to the field of process monitoring and diagnosis and is based on the cubic spline wavelet decomposition of the data. It is shown that the assessed qualitative description of trends can be coupled easily with existing process knowledge and does not demand the user to understand the underlying technique in detail, in contrast to, for instance, multivariate techniques in Statistical Process Control. The assessed links can be integrated straightforwardly into the framework of supervisory control systems by means of look-up tables, expert systems or case-based reasoning frameworks. This in turn allows the design of a supervisory control system leading to fully automated control actions. The technique is illustrated by an application to a pilot-scale SBR.


  • Adding realism to simulated sensors and actuators

    by C. Rosen, L. Rieger, U. Jeppsson, P. A. Vanrolleghem

    In this paper, we propose a statistical theoretical framework for incorporation of sensor and actuator faults in dynamic simulations of wastewater treatment operation. Sensor and actuator faults and failures are often neglected in simulations for control strategy development and testing, although it is well known that they represent a significant obstacle for realising control at full-scale facilities. The framework for incorporating faults and failures is based on Markov chains and displays the appealing property of easy transition of sensor and actuator history into a model for fault generation. The paper briefly describes Markov theory and how this is used together with models for sensor and actuator dynamics to achieve a realistic simulation of measurements and actuators.


  • Open Access

    Benchmark simulation model no 2: general protocol and exploratory case studies

    by U. Jeppsson, M.-N. Pons, I. Nopens, J. Alex, J.B. Copp, K.V. Gernaey, C. Rosen, J.-P. Steyer, P.A. Vanrolleghem

    Over a decade ago, the concept of objectively evaluating the performance of control strategies by simulating them using a standard model implementation was introduced for activated sludge wastewater treatment plants. The resulting Benchmark Simulation Model No 1 (BSM1) has been the basis for a significant new development that is reported on here: Rather than only evaluating control strategies at the level of the activated sludge unit (bioreactors and secondary clarifier) the new BSM2 now allows the evaluation of control strategies at the level of the whole plant, including primary clarifier and sludge treatment with anaerobic sludge digestion. In this contribution, the decisions that have been made over the past three years regarding the models used within the BSM2 are presented and argued, with particular emphasis on the ADM1 description of the digester, the interfaces between activated sludge and digester models, the included temperature dependencies and the reject water storage. BSM2-implementations are now available in a wide range of simulation platforms and a ring test has verified their proper implementation, consistent with the BSM2 definition. This guarantees that users can focus on the control strategy evaluation rather than on modelling issues. Finally, for illustration, twelve simple operational strategies have been implemented in BSM2 and their performance evaluated. Results show that it is an interesting control engineering challenge to further improve the performance of the BSM2 plant (which is the whole idea behind benchmarking) and that integrated control (i.e. acting at different places in the whole plant) is certainly worthwhile to achieve overall improvement.


  • Comparison of two wavelet-based tools for data mining of urban water networks time series

    by K. Villez, G. Pelletier, C. Rosén, F. Anctil, C. Duchesne, P.A. Vanrolleghem

    In this paper, two approaches to data mining of time series have been tested and compared. Both methods are based on the wavelet decomposition of data series and allow the localization of important characteristics of a time series in both the time and frequency domain. The first method is a common method based on the analysis of wavelet power spectra. The second approach is new to the applied field of urban water networks and provides a qualitative description of the data series based on the cubic spline wavelet decomposition of the data. It is shown that wavelet power spectra indicate important and basic characteristics of the data but fail to provide detailed information of the underlying phenomena. In contrast, the second method allows the extraction of more and more detailed information that is important in a context of process monitoring and diagnosis


  • Benchmark Simulation Model No 2 in Matlab-Simulink: towards plant-wide WWTP control strategy evaluation

    by D. Vrecko, K.V. Gernaey, C. Rosen, U. Jeppsson

    In this paper, implementation of the Benchmark Simulation Model No 2 (BSM2) within Matlab-Simulink is presented. The BSM2 is developed for plant-wide WWTP control strategy evaluation on a long-term basis. It consists of a pre-treatment process, an activated sludge process and sludge treatment processes. Extended evaluation criteria are proposed for plant-wide control strategy assessment. Default open-loop and closed-loop strategies are also proposed to be used as references with which to compare other control strategies. Simulations indicate that the BM2 is an appropriate tool for plant-wide control strategy evaluation.


  • Implementing ADM1 for plant-wide benchmark simulations in Matlab/Simulink

    by C. Rosen, D. Vrecko, K.V. Gernaey, M.N. Pons, U. Jeppsson

    The IWA Anaerobic Digestion Model No.1 (ADM1) was presented in 2002 and is expected to represent the state-of-the-art model within this field in the future. Due to its complexity the implementation of the model is not a simple task and several computational aspects need to be considered, in particular if the ADM1 is to be included in dynamic simulations of plant-wide or even integrated systems. In this paper, the experiences gained from a Matlab/Simulink implementation of ADM1 into the extended COST/IWA Benchmark Simulation Model (BSM2) are presented. Aspects related to system stiffness, model interfacing with the ASM family, mass balances, acid-base equilibrium and algebraic solvers for pH and other troublesome state variables, numerical solvers and simulation time are discussed. The main conclusion is that if implemented properly, the ADM1 will also produce high-quality results in dynamic plant-wide simulations including noise, discrete sub-systems, etc. without imposing any major restrictions due to extensive computational efforts.


  • Introducing biological phosphorus removal in an alternating plant by means of control: a full scale study

    by C. Rosen, P. Ingildsen, T. Guildal, T. Munk Nielsen, M.K. Nielsen, B.N. Jacobsen, H.A. Thomsen

    In this paper, a control strategy for introducing enhanced biological phosphorus removal (EBPR) in an alternating plant designed for enhanced biological nitrogen removal (EBNR) is presented. Alternating aerobic and anaerobic conditions to promote EBPR are provided by controlling the phases of the operational cycle, instead of a separate anaerobic volume. By utilising the control schemes already built in the STAR® control system for nitrogen removal, the control strategy is fully integrated in the system. The control system relies on on-line measurements of nitrogen (ammonia and/or nitrate) and orthophosphate. The control strategy has been implemented in full-scale operation at the Avedøre wastewater treatment plant in Denmark and the results show clear indications of success. The control strategy has operated robustly for several months with a 60% decrease in use of precipitation chemicals.


  • Modelling and control strategy testing of biological and chemical phosphorus removal at Avedøre WWTP

    by P. Ingildsen, C. Rosen, K.V. Gernaey, M.K. Nielsen, T. Guildal, B.N. Jacobsen

    The biological phosphorus removal process is often implemented at plants by the construction of an anaerobic bio-p tank in front of the traditional N removing plant configuration. However, biological phosphorus removal is also observed in plant configurations constructed only for nitrogen removal and simultaneous or post-precipitation. The operational experience with this “accidental” biological phosphorus removal is often mixed with quite a lot of frustration, as the process seems to come and go and hence behaves quite uncontrollably. The aim of this work is to develop ways of intentionally exploiting the biological phosphorus process by the use of instrumentation, control and automation to reduce the consumption of precipitants. Means to this end are first to calibrate a modified ASM2d model to a full-scale wastewater treatment plant (WWTP), including both biological and chemical phosphorus removal and a model of the sedimentation process. Second, based on the calibrated model a benchmark model is developed and various control strategies for biological phosphorus removal are tested. Experiences and knowledge gained from the strategies presented and discussed in this paper are vital inputs for the full-scale implementation of a control strategy for biological phosphorus removal at Avedøre WWTP, which is described in another paper. The two papers hence show a way to bridge the gap from model to full implementation.


  • Towards a benchmark simulation model for plant-wide control strategy performance evaluation of WWTPs

    by U. Jeppsson, C. Rosen, J. Alex, J. Copp, K.V. Gernaey, M.-N. Pons, P.A. Vanrolleghem

    The COST/IWA benchmark simulation model has been available for seven years. Its primary purpose has been to create a platform for control strategy benchmarking of activated sludge processes. The fact that the benchmark has resulted in more than 100 publications, not only in Europe but also worldwide, demonstrates the interest in such a tool within the research community In this paper, an extension of the benchmark simulation model no 1 (BSM1) is proposed. This extension aims at facilitating control strategy development and performance evaluation at a plant-wide level and, consequently, includes both pre-treatment of wastewater as well as the processes describing sludge treatment. The motivation for the extension is the increasing interest and need to operate and control wastewater treatment systems not only at an individual process level but also on a plant-wide basis. To facilitate the changes, the evaluation period has been extended to one year. A prolonged evaluation period allows for long-term control strategies to be assessed and enables the use of control handles that cannot be evaluated in a realistic fashion in the one-week BSM1 evaluation period. In the paper, the extended plant layout is proposed and the new suggested process models are described briefly. Models for influent file design, the benchmarking procedure and the evaluation criteria are also discussed. And finally, some important remaining topics, for which consensus is required, are identified.