Zhanguo Zhu
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Previous Organizations / Institutes
The organizations / institutes from the scholar's other articles in the past ten years
Zhanguo Zhu has a total of 4 co-authors. Here are the top co-authors by number of shared publications:
- Feng Chu
IBISC, Univ Evry, University of Paris-Saclay, Evry, France
3 shared publications Linyan Sun
School of Management, Xi’an Jiaotong University, Xi’an, 710049 Shaanxi Province, P.R. China
3 shared publications- Ming Liu
Department of Materials Science and Engineering, Xi’an University of Technology, Xi’an 710048, China
2 shared publications - Yugang Yu
School of Management, University of Science and Technology of China, Hefei, P.R. China
1 shared publication
Latest Publications
- 1 October 2016
- Published by EDP Sciences in RAIRO - Operations Research
- Vol. 50 (4-5) , 733-748
Single-machine past-sequence-dependent setup times scheduling with resource allocation and learning effect
- 1 October 2016
- Published by EDP Sciences in RAIRO - Operations Research
- Vol. 50 (4-5) , 733-748
Single-machine past-sequence-dependent setup times scheduling with resource allocation and learning effect
- 28 February 2011
- Published by Elsevier in Computers & Industrial Engineering
- Vol. 60 (1) , 148-157
Single-machine group scheduling with resource allocation and learning effect
- 28 February 2011
- Published by Elsevier in Computers & Industrial Engineering
- Vol. 60 (1) , 148-157
Single-machine group scheduling with resource allocation and learning effect
- Open Access
- 1 January 2011
- Published by Wiley in Mathematical Problems in Engineering
- Vol. 2011 (1)
Due‐Window Assignment and Scheduling with Multiple Rate‐Modifying Activities under the Effects of Deterioration and Learning
This paper discusses due‐window assignment and scheduling with multiple rate‐modifying activities. Multiple types of rate‐modifying activities are allowed to perform on a single machine. The learning effect and job deterioration are also integrated concurrently into the problem which makes the problem more realistic. The objective is to find jointly the optimal location to perform multiple rate‐modifying activities, the optimal job sequence, and the optimal location and size of the due window to minimize the total earliness, tardiness, and due‐window‐related costs. We propose polynomial time algorithms for all the cases of the problem under study.
- 1 January 2011
- Published by Wiley in Mathematical Problems in Engineering
- Vol. 2011 (1)
Open AccessDue‐Window Assignment and Scheduling with Multiple Rate‐Modifying Activities under the Effects of Deterioration and Learning
This paper discusses due‐window assignment and scheduling with multiple rate‐modifying activities. Multiple types of rate‐modifying activities are allowed to perform on a single machine. The learning effect and job deterioration are also integrated concurrently into the problem which makes the problem more realistic. The objective is to find jointly the optimal location to perform multiple rate‐modifying activities, the optimal job sequence, and the optimal location and size of the due window to minimize the total earliness, tardiness, and due‐window‐related costs. We propose polynomial time algorithms for all the cases of the problem under study.