AVAlois Vigl

Alois Vigl

*This is an algorithmically generated author record based on publicly available information.

Alois Vigl has a total of 23 co-authors. Here are the top co-authors by number of shared publications:


Latest Publications

  • Eignung und Auswahl von Vortriebsverfahren für Druckstollen von Hochdruck‐Wasserkraftanlagen

    by Reinhold Gerstner, Alois Vigl, Manfred Jäger, Nicole Wilfinger


  • TBM research project – Tolerances segmental lining / TVM‐Forschungsprojekt – Toleranzen Tübbingausbau

    by Alois Vigl, Andreas Walter, Johann Lemmerer, Georg Atzl, Dieter Handke

    In infrastructure tunnelling projects with shielded TBMs, prefabricated segmental linings are used with various systems and requirements. The required degree of accuracy in segment production and ring assembly is a considerable factor in terms of equipment, time and costs. The required tolerances for segments and ring assembly depend significantly on the segment geometry, lining system and field of application. In order to provide a reasonable basis for allowable segment and installation tolerances, a new approach has been established as part of a research initiative of the ÖBB‐Infrastruktur AG with respect to the risks and consequences arising from geometrical tolerances. The paper explains the concept of “tolerance classes” with the approach for their developments, derivation and classification. A practical application example is shown in addition. With respect to the nomenclature of tolerances, a harmonization process has been performed in collaboration with the German committees for underground structures, ZTV‐ING and DAUB. The results of harmonizing and proposals of tolerance clarifications are presented within this paper.Toleranzklassen, Harmonisierung der Toleranzbegriffe und Toleranzanforderungen Erfahrungsstand 2016Bei maschinellen Schildvortrieben kommen Tübbingauskleidungen mit unterschiedlichen Systemen und Anforderungen zum Einsatz. Die erforderliche Genauigkeit in der Herstellung der Fertigteilsegmente sowie beim Ringbau gewinnt immer mehr an Bedeutung für eine wirtschaftliche Auslegung der Auskleidung, gekoppelt an die spezifischen Anforderungen des Projekts. Das erforderliche Maß an die Genauigkeit der Tübbinge und den Einbau im Tunnel hängt im Wesentlichen von der Tübbinggeometrie, vom Tübbingsystem und vom jeweiligen Anwendungsbereich ab. Im Arbeitskreis “TVM‐Forschungsprojekt Toleranzen”, einer Forschungsinitiative der ÖBB‐Infrastruktur AG, wurde ein neuer Ansatz für die Herleitung zulässiger Herstell‐ und Einbautoleranzen unter Einbeziehung einer Risikobetrachtung entwickelt. Im vorliegenden Beitrag wird die Herangehensweise für die Entwicklung, Herleitung und Klassifizierung von Toleranzgruppen, die unter dem Namen “Toleranzklassen” geführt werden, beschrieben. Ergänzend wird auch ein Beispiel für die Anwendung des vorgestellten Konzepts gezeigt. Im Zusammenhang mit den Toleranzklassen erfolgte eine Harmonisierung von Toleranzbegriffen in Zusammenarbeit mit deutschen Ausschüssen wie der ZTV‐ING und des DAUB. Die wesentlichen Änderungen und Ergänzungen der Toleranzbegriffe sowie Erläuterungen werden im Anschluss an das erwähnte Konzept der Toleranzklassen vorgestellt.


  • Risk analysis for the selection of a suitable method of tunnelling for the Pummersdorf Tunnel / Risikoanalyse zur Wahl der geeigneten Vortriebsmethode für den Tunnel Pummersdorf

    by Dietmar Bach, Reinhold Hödl, Johann Lemmerer, Alois Vigl

    The Pummersdorf Tunnel is part of the works to close the gap between St. Pölten and Loosdorf and is planned as a single‐bore, two‐track tunnel about 3.5 km long. Before the start of the design work leading to handing the project in for approval, a risk analysis was carried out regarding suitable tunnelling methods, with four variants being compared. As a result of this risk analysis, taking the current market conditions into account, a decision was made to submit two methods of tunnelling to free market competition:· Variant A: Sequential advance with two lining layers (with relief of water pressure),· Variant B: Continuous advance with an EPB shield with single‐layer segment lining (resistant to water pressure).This article describes the project as affected by the geotechnical, hydrogeological and environmental constraints as well as the specific sensitive aspects on this project. It describes the decision‐making process, which led to the selection of the two tendered variants, and briefly describes the tendered variants.Der Tunnel Pummersdorf ist Bestandteil des Lückenschlusses St. Pölten‐Loosdorf und ist als einröhriger, zweigleisiger Tunnel mit rund 3,5 km Länge geplant. Vor Beginn der Ausschreibungsplanung wurde eine Risikoanalyse betreffend geeigneter Vortriebsmethoden durchgeführt, wobei vier Varianten miteinander verglichen wurden. Als Ergebnis der Risikoanalyse wurde unter Berücksichtigung von derzeitigen Marktverhältnissen die Entscheidung getroffen, zwei Vortriebsmethoden dem freien Wettbewerb zu stellen:· Variante A: Zyklischer Vortrieb mit zweischaligem Ausbau (druckwasserentlastend),· Variante B: Kontinuierlicher Vortrieb mit EPB‐Schild mit einschaligem Tübbingausbau (druckwasserhaltend).Im vorliegenden Bericht wird das Projekt im Rahmen der geotechnischen, hydrogeologischen und umfeldrelevanten Randbedingungen sowie der spezifisch sensiblen Aspekte des Projekts vorgestellt. Es wird auf die Entscheidungsfindung eingegangen, die zur Auswahl der beiden ausgeschriebenen Varianten geführt hat, und die ausgeschriebenen Varianten werden in ihren Grundzügen vorgestellt.


  • Kopswerk II headrace tunnel – geomechanical and construction design / Triebwasserstollen Kopswerk II – geomechanische und bautechnische Planung

    by Alois Vigl, C. Barwart

    The Kopswerk II power plant of the Vorarlberger Illwerke AG with a capacity of 510 MW was constructed between 2004 and 2008 as a pumped storage scheme parallel to the existing Kopswerk I (247 MW) constructed in 1969. The design of the headrace was confronted with borderline conditions concerning both construction and operation. The construction concept had to take into consideration the external constraints and ensure continuous construction in winter in the high mountains. On account of the formation water situation, the intention was to relieve formation water pressure during the construction period.In operation, the components of the headrace system including pressure tunnel are subject to enormous internal pressure fluctuations within a very short time on account of the pumped storage peak flow operation of Kopswerk II. In addition, the external formation water pressure can reach a head of 450 m, which could scarcely be resisted with an economic lining alone. This resulted in a basic design concept to integrate the surrounding rock mass into the structural system as far as possible, both with regard to rock pressure and formation water pressure. Such a concept has to include systematic and differentiated grouting of the rock mass, which is not always simple to achieve under high formation water pressure.Das Kopswerk II der Vorarlberger Illwerke AG mit einer Leistung von 510 MW wurde in den Jahren 2004 bis 2008 parallel zum seit 1969 bestehenden Kopswerk I (247 MW) als Pumpspeicherwerk neu errichtet. Die Planung der Oberwasserführung war sowohl im Hinblick auf die Errichtung wie auch auf den Betrieb mit grenzwertigen Bedingungen konfrontiert. Das Baukonzept musste hinsichtlich der äußeren Bedingungen einen Durchlaufbetrieb im Winter und im Hochgebirge ermöglichen. Hinsichtlich der Bergwassersituation war eine Entlastung des Bergwasserdrucks während der Bauarbeiten anzustreben.Im Betrieb unterliegen die Komponenten der Oberwasserführung einschließlich Druckstollen wegen des Pumpspeicher‐ Spitzenstrom‐Einsatzes des Kopswerks II enormen Innendruckschwankungen innerhalb kürzester Zeitspannen. Zudem steht von außen ein Bergwasser‐Druckpotenzial von bis zu 450 m Wassersäule an, das durch eine wirtschaftliche Auskleidung allein kaum zu beherrschen wäre. Somit musste ein planerisches Grundkonzept verfolgt werden, welches das umgebende Gebirge möglichst weitgehend in das Tragkonzept mit einbezieht und zwar sowohl hinsichtlich Gebirgslast wie auch hinsichtlich Bergwasserdruck. Ein solches Konzept schließt eine systematische und differenzierte Gebirgsbehandlung mittels Injektionen konsequent ein, was unter Bergwasserandrang nicht immer leicht umsetzbar ist.


  • New Semmering Base Tunnel – the current state of tunnel design taking the newest investigation results into account /

    by Josef Daller, Alois Vigl, Oliver K. Wagner

    As result of the two‐year route selection process, the southernmost variant Pfaffensattel was chosen in April 2008 as the best variant for the New Semmering Base Tunnel, which run from Gloggnitz to the Mürzzuschlag‐Langenwang area, and the route has since been optimised for design through a detailed programme of investigations. As a result of this, the final route of the tunnel was fixed in autumn 2009. All design work for the partially concentrated approvals process are now based on this route.This article is concerned with the essential technical tunnel construction aspects of the design to be handed in for approval, above all the construction concept and the procedure for geotechnical design to be used as a basis. At the time of writing this article, the final evaluation of the geomechanical and hydrogeological investigations and the geotechnical design are still underway.Als Ergebnis eines rund zweijährigen Trassenauswahlverfahrens wurde im April 2008 die südlichste Variante Pfaffensattel als die beste Variante für den Semmering‐Basistunnel neu, der zukünftig Gloggnitz mit dem Raum Mürzzuschlag‐Langenwang verbinden soll, ausgewählt und seither im Rahmen der Maßnahmenplanung mit einem detaillierten Erkundungsprogramm optimiert. Als Ergebnis konnte die endgültige Lage des Tunnels im Herbst 2009 fixiert werden. Auf dieser Trasse bauen nun sämtliche Planungen für das teilkonzentrierte Genehmigungsverfahren auf.Der gegenständliche Beitrag befasst sich mit den wesentlichen tunnelbautechnischen Aspekten für die Einreichplanungen, allen voran das zugrunde liegende Baukonzept sowie dem prinzipiellen Vorgehen in der geotechnischen Planung. Zum Zeitpunkt der Erstellung dieses Beitrags lag das geologische Baugrundmodell weitgehend vor, die endgültige Auswertung der geomechanischen und hydrogeologischen Untersuchungen sowie die geotechnische Planung waren jedoch noch im Gang.