CDClayton V. Deutsch

Clayton V. Deutsch

*This is an algorithmically generated author record based on publicly available information.

Current Organizations / Institutes

The organizations/institutes from the scholar's latest article


Clayton V. Deutsch has a total of 31 co-authors. Here are the top co-authors by number of shared publications:


Latest Publications

  • Open Access

    Joint Modeling of Floor Elevations and Thickness of a Bauxite Unit Considering Trend, Histogram and Variogram Uncertainty

    by Oktay Erten, Clayton V. Deutsch

    Laterite-type bauxite deposits typically exhibit a highly irregular boundary between the bauxite and underlying ferricrete units. This irregularity cannot be accurately modeled using data collected from sparsely spaced drillholes (e.g., 76.2×76.2 m or 250×250 ft). Geological models that assume a sharp and nearly horizontal bauxite/ferricrete contact can result in significant errors when calculating the in situ bauxite resource (in volume) and in misclassifying ore and waste during mining operations. Two primary sources of uncertainty must be addressed when modeling lateritic bauxite deposits: (1) grade uncertainty associated with variations in Al2O3 and SiO2% concentrations, and (2) geometric uncertainty related to lateral variations in the bauxite/ferricrete contact. Among these, geometric uncertainty is more critical, as accurately estimating bauxite ore tonnage depends on the precise modeling of the lateral variation in the boundary between the bauxite and underlying ferricrete units. This study evaluates the uncertainty of the bauxite resource within a selected mine area in northern Queensland, Australia, particularly in cases where experimental data are sparse and limited. To address this, the position variable (bauxite floor elevations) and the thickness of the bauxite unit are jointly simulated under two scenarios. In the first scenario, the histograms, variogram model parameters, and the estimated trend of the variables of interest are assumed to be known with certainty; that is, parameter uncertainty is not considered in the modeling process. In the second scenario, the histograms, variogram model parameters, and the estimated trend are considered uncertain, and parameter uncertainty is explicitly incorporated into the modeling process using the multivariate spatial bootstrap procedure. The methodology is applied to both scenarios, showing that incorporating parameter uncertainty in geostatistical modeling results in greater dispersion of the uncertainty associated with the in situ bauxite resource. The results show that the 95% confidence intervals for the in situ bauxite ore volume, derived from bauxite thickness realizations, vary depending on whether parameter uncertainty is considered. When parameter uncertainty is incorporated, the interval is (390,123 m3 and 393,223 m3), whereas without parameter uncertainty, it is (382,332 m3 and 384,373 m3). This comparison highlights that incorporating parameter uncertainty provides a more realistic assessment of resource risk in the modeling process.

  • Open Access

    The Place of Geostatistical Simulation through the Life Cycle of a Mineral Deposit

    by Clayton V. Deutsch

    Geostatistical techniques are applied to examine the life cycle of a mineral deposit. There are two main classes of geostatistical techniques: (1) deterministic techniques that include kriging and cokriging for a single best estimate, and (2) probabilistic techniques that include simulation, which infer probability distributions and simulate realizations to transfer multivariable and multilocation uncertainty through to larger-scale resource and reserve uncertainty. Probabilistic techniques are newer and more powerful in that they provide access to quantitative measures of uncertainty and models with correct spatial variability; however, they have not seen widespread application in all aspects of the life cycle of mines. Workflows and methodologies for the appropriate use of deterministic and probabilistic techniques have been discussed. Software, engineering practices and management expectations limit some applications. Applications have been reviewed, and enhancements are required to realize the full potential of geostatistical techniques, which have been discussed with examples.


  • Probabilistic Modeling of the Round Mountain Gold Deposit: a Case Study

    by Ben Harding, Rodolfo Lagos, Nicos Pfeiffer, Clayton V. Deutsch


  • Bootstrap

    by Oktay Erten, Clayton V. Deutsch

  • Open Access

    Application of Volume Uncertainty for Resource Classification: A Case Study on the Rondon Do Pará Bauxite Deposit, Brazil

    by Saulo B. de Oliveira, Jeff B. Boisvert, Clayton V. Deutsch

    This study illustrates the application of conditional simulations to calculate the uncertainty associated with the thickness of bauxite ores. The bauxite deposit of Rondon do Pará in northern Pará State, Brazil, is characterized by a well-defined lateritic profile, with the ore being composed of two sequential horizons: massive bauxite and ferruginous bauxite. This study used ore thickness data from 1.005 drillholes with different grid spacing. Drillhole intervals of both types of bauxite ore were accumulated, converting the database from 3D to 2D. Sequential Gaussian simulation produced probability maps calculated from certain confidence intervals, which permits obtaining the uncertainty associated with estimates in thickness. Results show that in portions with the same regular drillhole spacing there are different ranges of uncertainty and variability, which could be useful to support resource classification, associating different confidence intervals to resource classes. This analysis could also guide the drilling program for resource conversion in order to optimize costs, indicating areas where there is greater uncertainty and would need to be densified. The incorporation of this information into the resource model could be very helpful for supporting subsequent studies of economic evaluation and risk analyses with respect to this type of deposit or similarly in mineral exploration.


  • Open Access

    Projection Pursuit Multivariate Sampling of Parameter Uncertainty

    by Oktay Erten, Fábio P. L. Pereira, Clayton V. Deutsch

    The efficiency of sampling is a critical concern in Monte Carlo analysis, which is frequently used to assess the effect of the uncertainty of the input variables on the uncertainty of the model outputs. The projection pursuit multivariate transform is proposed as an easily applicable tool for improving the efficiency and quality of a sampling design in Monte Carlo analysis. The superiority of the projection pursuit multivariate transform, as a sampling technique, is demonstrated in two synthetic case studies, where the random variables are considered to be uncorrelated and correlated in low (bivariate) and high (five-variate) dimensional sampling spaces. Five sampling techniques including Monte Carlo simulation, classic Latin hypercube sampling, maximin Latin hypercube sampling, Latin hypercube sampling with multidimensional uniformity, and projection pursuit multivariate transform are employed in the simulation studies, considering cases where the sample sizes (n) are small (i.e., 10≤n≤100), medium (i.e., 100<n≤1000), and large (i.e., 1000 < n≤ 10,000). The results of the case studies show that the projection pursuit multivariate transform appears to yield the fewest sampling errors and the best sampling space coverage (or multidimensional uniformity), and that a significant amount of computer effort could be saved by using this technique.


  • Estimating Stable Measured Values and Detecting Anomalies in Groundwater Geochemistry Time Series Data Across the Athabasca Oil Sands Area, Canada

    by John G. Manchuk, Jean S. Birks, Cynthia N. McClain, Guy Bayegnak, John J. Gibson, Clayton V. Deutsch