George Zillante
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Previous Organizations / Institutes
The organizations / institutes from the scholar's other articles in the past ten years
George Zillante has a total of 10 co-authors. Here are the top co-authors by number of shared publications:
- Jian Zuo
School of Architecture & Built Environment, The University of Adelaide, SA, Australia
6 shared publications - Zhen-Yu Zhao
School of Economics and Management, North China Electric Power University, Beijing, China
5 shared publications - Bo Xia
Queensland University of Technology
2 shared publications - Albert Ping Chuen Chan
The Hong Kong Polytechnic University
1 shared publication - Jian Zuo
School of Natural and Built Environments, University of South Australia, North Terrace, Adelaide, South Australia 5000, Australia. Tel: 61 8 8302 1914; Fax: 61 8 8302 2252
1 shared publication - Morteza Shokri-Ghasabeh
School of Natural and Built Environments, University of South Australia, Adelaide, SA, 5000, Australia
1 shared publication
Latest Publications
- Open Access
- 9 October 2015
- Published by Vilnius Gediminas Technical University in International Journal of Strategic Property Management
- Vol. 19 (3) , 245-259
HOW AUSTRALIAN CONSTRUCTION CONTRACTORS RESPONDED TO THE ECONOMIC DOWNTURN
The Global Financial Crisis (GFC) in 2008 had a significant impact on the world economy and the construction industry was no exception. This study investigates the major impacts of the 2008 GFC on the Australian construction industry and, in particular how the Australian construction contractors responded to the economic downturn. A total of 35 senior managers from the Top 100 Australian construction companies were interviewed. The findings indicate that construction companies, particularly the large ones were not affected in any significant way but are expecting some difficult financial times over the next few years and are taking actions to minimize the upcoming adverse impacts. The most common strategy adopted by Australian construction contractors is to concentrate on core business while avoiding aimless bidding. Similarly, great focus is placed on retaining human resources in order to maintain the skill set so that the company can respond quickly when market conditions improves. The research findings will provide construction contractors with insights on how to establish and sustain competitive advantages during economic slowdown and become more resilient in the future.
- 9 October 2015
- Published by Vilnius Gediminas Technical University in International Journal of Strategic Property Management
- Vol. 19 (3) , 245-259
Open AccessHOW AUSTRALIAN CONSTRUCTION CONTRACTORS RESPONDED TO THE ECONOMIC DOWNTURN
The Global Financial Crisis (GFC) in 2008 had a significant impact on the world economy and the construction industry was no exception. This study investigates the major impacts of the 2008 GFC on the Australian construction industry and, in particular how the Australian construction contractors responded to the economic downturn. A total of 35 senior managers from the Top 100 Australian construction companies were interviewed. The findings indicate that construction companies, particularly the large ones were not affected in any significant way but are expecting some difficult financial times over the next few years and are taking actions to minimize the upcoming adverse impacts. The most common strategy adopted by Australian construction contractors is to concentrate on core business while avoiding aimless bidding. Similarly, great focus is placed on retaining human resources in order to maintain the skill set so that the company can respond quickly when market conditions improves. The research findings will provide construction contractors with insights on how to establish and sustain competitive advantages during economic slowdown and become more resilient in the future.
- 18 June 2013
- Published by Springer Nature
- p. 91-98
The Future of Sustainable Building Assessment Tools: A Case Study in Australia
- 18 June 2013
- Published by Springer Nature
- p. 91-98
The Future of Sustainable Building Assessment Tools: A Case Study in Australia
- 31 July 2012
- Published by Elsevier in Habitat International
- Vol. 36 (3) , 362-370
Foreign architectural and engineering design firms’ competitiveness and strategies in China: A diamond model study
- 31 July 2012
- Published by Elsevier in Habitat International
- Vol. 36 (3) , 362-370
Foreign architectural and engineering design firms’ competitiveness and strategies in China: A diamond model study
- 1 October 2011
- Published by American Society of Civil Engineers (ASCE) in Journal of Management in Engineering
- Vol. 27 (4) , 200-209
Situation and Competitiveness of Foreign Project Management Consultancy Enterprises in China
At the end of the World Trade Organization transition period for China in 2006, the foreign project management consultancy sector entered a new era. Massive construction project development in China created a huge demand for various project management consultancy services, which has attracted an increasing number of foreign project management consultancy enterprises (FPCEs). Using the strengths, weaknesses, opportunities, and threats (SWOT) analysis framework, this paper identifies the FPCEs’ SWOT in China. A multifacet qualitative approach including a literature survey, statistical data review, regulation and policy studies, and semistructured interviews is adopted to investigate these factors. A total of 26 SWOT factors are identified. A SWOT strategies matrix is proposed to assist FPCEs in forming appropriate strategies.
- 1 October 2011
- Published by American Society of Civil Engineers (ASCE) in Journal of Management in Engineering
- Vol. 27 (4) , 200-209
Situation and Competitiveness of Foreign Project Management Consultancy Enterprises in China
At the end of the World Trade Organization transition period for China in 2006, the foreign project management consultancy sector entered a new era. Massive construction project development in China created a huge demand for various project management consultancy services, which has attracted an increasing number of foreign project management consultancy enterprises (FPCEs). Using the strengths, weaknesses, opportunities, and threats (SWOT) analysis framework, this paper identifies the FPCEs’ SWOT in China. A multifacet qualitative approach including a literature survey, statistical data review, regulation and policy studies, and semistructured interviews is adopted to investigate these factors. A total of 26 SWOT factors are identified. A SWOT strategies matrix is proposed to assist FPCEs in forming appropriate strategies.
- 30 December 2010
- Published by Springer Nature
- p. 803-818
Chinese Construction Industry: Governance, Procurement and Culture
- 30 December 2010
- Published by Springer Nature
- p. 803-818
Chinese Construction Industry: Governance, Procurement and Culture
- 1 June 2010
- Published by American Society of Civil Engineers (ASCE) in Journal of Construction Engineering and Management
- Vol. 136 (6) , 659-669
Prediction System for Change Management in Construction Project
Changes are the main causes of delays and cost overruns in construction projects. Various change management systems have been developed to minimize the impacts of changes and to facilitate good project management. This paper presents a change prediction system using activity-based dependency structure matrix (DSM) to facilitate change management. DSM is used to model the process that may occur as a result of changes. Consequently changes can be predicted by setting the change criteria for each activity in the form of rework scope. Furthermore, Monte Carlo simulation is introduced to analyze the change probability of activities involved in construction projects. The effectiveness of the prediction system is verified by applying this system to an office building project. This study provides a useful tool for project management teams to manage changes proactively and efficiently.
- 1 June 2010
- Published by American Society of Civil Engineers (ASCE) in Journal of Construction Engineering and Management
- Vol. 136 (6) , 659-669
Prediction System for Change Management in Construction Project
Changes are the main causes of delays and cost overruns in construction projects. Various change management systems have been developed to minimize the impacts of changes and to facilitate good project management. This paper presents a change prediction system using activity-based dependency structure matrix (DSM) to facilitate change management. DSM is used to model the process that may occur as a result of changes. Consequently changes can be predicted by setting the change criteria for each activity in the form of rework scope. Furthermore, Monte Carlo simulation is introduced to analyze the change probability of activities involved in construction projects. The effectiveness of the prediction system is verified by applying this system to an office building project. This study provides a useful tool for project management teams to manage changes proactively and efficiently.
- 4 May 2010
- Published by American Society of Civil Engineers (ASCE)
- p. 1020-1029
From Construction Project Success to Integrated Construction Project Selection
It is noted that project success and project selection and their corresponding criteria and factors have been treated as two separate project management topics. Project success and project selection have not been related to each other yet, but according to our research, they share at least fourteen common traits. This paper seeks to identify the common overlapping themes, which can be used to form a new common model known as the "Integrated Construction Project Selection Process". The model, which is based on the level of success of a construction company's previous projects, uses this information in the company's multi criteria project selection process. As a result, the model enhances the level of project success when a company selects a project. This integrated construction project selection model will be of considerable value to both senior managers and general practitioners within the construction operational environment as it will enable the industry to draw benefits from an integrated approach rather than from two disparate systems.
- 4 May 2010
- Published by American Society of Civil Engineers (ASCE)
- p. 1020-1029
From Construction Project Success to Integrated Construction Project Selection
It is noted that project success and project selection and their corresponding criteria and factors have been treated as two separate project management topics. Project success and project selection have not been related to each other yet, but according to our research, they share at least fourteen common traits. This paper seeks to identify the common overlapping themes, which can be used to form a new common model known as the "Integrated Construction Project Selection Process". The model, which is based on the level of success of a construction company's previous projects, uses this information in the company's multi criteria project selection process. As a result, the model enhances the level of project success when a company selects a project. This integrated construction project selection model will be of considerable value to both senior managers and general practitioners within the construction operational environment as it will enable the industry to draw benefits from an integrated approach rather than from two disparate systems.
- 1 January 2006
- Published by Taylor & Francis in International Journal of Construction Management
- Vol. 6 (2) , 15-29
Project Culture within Construction Projects - A Pilot Case Study
Project culture is raised as a general concept in some academic papers and industry reports. Those studies indicate that project culture is very important for the processing of construction projects; however, they do not provide a clear definition of project culture. In addition, there is no model that specifically examines the project culture of each construction project. This paper reviews the literature about cultural studies in a construction projects context, especially the culture at project level. A modified version of the current and generally used organizational culture model is suggested after the literature review. Finally a pilot case study was conducted to test the suggested model as well as the research instrument that will be used in further studies. The results show that the waste derived from the inappropriate behaviours/attitudes of the project participants can be minimized by creating a positive project culture. As a result, the value of the client/project will be improved.
- 1 January 2006
- Published by Taylor & Francis in International Journal of Construction Management
- Vol. 6 (2) , 15-29
Project Culture within Construction Projects - A Pilot Case Study
Project culture is raised as a general concept in some academic papers and industry reports. Those studies indicate that project culture is very important for the processing of construction projects; however, they do not provide a clear definition of project culture. In addition, there is no model that specifically examines the project culture of each construction project. This paper reviews the literature about cultural studies in a construction projects context, especially the culture at project level. A modified version of the current and generally used organizational culture model is suggested after the literature review. Finally a pilot case study was conducted to test the suggested model as well as the research instrument that will be used in further studies. The results show that the waste derived from the inappropriate behaviours/attitudes of the project participants can be minimized by creating a positive project culture. As a result, the value of the client/project will be improved.