Chang-Shian Chen
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Research Subjects
Chang-Shian Chen has a total of 12 co-authors. Here are the top co-authors by number of shared publications:
Chao-Chung Yang
Research Assistant Professor, Construction and Disaster Prevention Research Center, Feng Chia Univ., No. 100 Wenhwa Rd., Seatwen, Taichung, Taiwan 40724, R.O.C.
3 shared publications- Liang-Cheng Chang
National Chiao Tung University
2 shared publications - Boris Po-Tsang Chen
Department of Hydraulic and Ocean Engineering, National Cheng Kung University, Tainan, Republic of China
1 shared publication - Chao-Chung Yang
Feng Chia University
1 shared publication - Chao-Hsien Yeh
Department of Water Resources Engineering and Conservation, Feng Chia University, Taichung City, 407, Taiwan
1 shared publication Chin-Hui Liu
1 shared publication
Latest Publications
- Open Access
Physical Hybrid Neural Network Model to Forecast Typhoon Floods
This study proposed a hybrid neural network model that combines a self-organizing map (SOM) and back-propagation neural networks (BPNNs) to model the rainfall-runoff process in a physically interpretable manner and to accurately forecast typhoon floods. The SOM and a two-stage clustering scheme were applied to group hydrologic data into four clusters, each of which represented a meaningful hydrologic component of the rainfall-runoff process. BPNNs were constructed for each cluster to achieve high forecasting capability. The physical hybrid neural network model was used to forecast typhoon flood discharges in Wu River in Taiwan by using two types of rainfall data. The clustering results demonstrated that the rainfall-runoff process was favorably described by the sequence of derived clusters. The flood forecasting results indicated that the proposed hybrid neural network model has good forecasting capability, and the performance of the models using the two types of rainfall data is similar. In addition, the derived lagged inputs are hydrologically meaningful, and the number and activation function of the hidden nodes can be rationally interpreted. This study also developed a traditional, single BPNN model trained using the whole calibration data for comparison with the hybrid neural network model. The proposed physical hybrid neural network model outperformed the traditional neural network model in forecasting the peak discharges and low flows.
Open AccessPhysical Hybrid Neural Network Model to Forecast Typhoon Floods
This study proposed a hybrid neural network model that combines a self-organizing map (SOM) and back-propagation neural networks (BPNNs) to model the rainfall-runoff process in a physically interpretable manner and to accurately forecast typhoon floods. The SOM and a two-stage clustering scheme were applied to group hydrologic data into four clusters, each of which represented a meaningful hydrologic component of the rainfall-runoff process. BPNNs were constructed for each cluster to achieve high forecasting capability. The physical hybrid neural network model was used to forecast typhoon flood discharges in Wu River in Taiwan by using two types of rainfall data. The clustering results demonstrated that the rainfall-runoff process was favorably described by the sequence of derived clusters. The flood forecasting results indicated that the proposed hybrid neural network model has good forecasting capability, and the performance of the models using the two types of rainfall data is similar. In addition, the derived lagged inputs are hydrologically meaningful, and the number and activation function of the hidden nodes can be rationally interpreted. This study also developed a traditional, single BPNN model trained using the whole calibration data for comparison with the hybrid neural network model. The proposed physical hybrid neural network model outperformed the traditional neural network model in forecasting the peak discharges and low flows.
- 6 May 2010
- Published by Springer Nature in Water Resources Management
- Vol. 24 (14) , 4175-4197
Spatial Information-Based Back-Propagation Neural Network Modeling for Outflow Estimation of Ungauged Catchment
- 6 May 2010
- Published by Springer Nature in Water Resources Management
- Vol. 24 (14) , 4175-4197
Spatial Information-Based Back-Propagation Neural Network Modeling for Outflow Estimation of Ungauged Catchment
- 8 August 2008
- Published by Springer Nature in Water Resources Management
- Vol. 23 (3) , 417-437
Multi-objective Planning for Conjunctive Use of Surface and Subsurface Water Using Genetic Algorithm and Dynamics Programming
- 8 August 2008
- Published by Springer Nature in Water Resources Management
- Vol. 23 (3) , 417-437
Multi-objective Planning for Conjunctive Use of Surface and Subsurface Water Using Genetic Algorithm and Dynamics Programming
- 1 November 2007
- Published by American Society of Civil Engineers (ASCE) in Journal of Water Resources Planning and Management
- Vol. 133 (6) , 499-508
Multiobjective Planning of Surface Water Resources by Multiobjective Genetic Algorithm with Constrained Differential Dynamic Programming
Owing to the conflict encountered between the two objectives of fixed cost in reservoir installation and operating cost in time-varying water deficit, multiobjective planning of surface water resources is a difficult job. Instead of combining these two objectives into just one objective using the weighting factor approach, this investigation proposes a novel method by integrating a multiobjective genetic algorithm (MOGA) with constrained differential dynamic programming (CDDP). A MOGA is employed to generate the various combinations of reservoir capacity and estimate the noninferior solution set. However, applying this algorithm to solve the dynamics of the operating cost, the number of variables increasing with time will dramatically increase the use of computational resources. Consequently, the CDDP is herein adopted to distribute optimal releases among reservoirs to satisfy water demand as much as possible. Next, the effectiveness of the proposed methodology is verified by solving a multiobjective plan...
- 1 November 2007
- Published by American Society of Civil Engineers (ASCE) in Journal of Water Resources Planning and Management
- Vol. 133 (6) , 499-508
Multiobjective Planning of Surface Water Resources by Multiobjective Genetic Algorithm with Constrained Differential Dynamic Programming
Owing to the conflict encountered between the two objectives of fixed cost in reservoir installation and operating cost in time-varying water deficit, multiobjective planning of surface water resources is a difficult job. Instead of combining these two objectives into just one objective using the weighting factor approach, this investigation proposes a novel method by integrating a multiobjective genetic algorithm (MOGA) with constrained differential dynamic programming (CDDP). A MOGA is employed to generate the various combinations of reservoir capacity and estimate the noninferior solution set. However, applying this algorithm to solve the dynamics of the operating cost, the number of variables increasing with time will dramatically increase the use of computational resources. Consequently, the CDDP is herein adopted to distribute optimal releases among reservoirs to satisfy water demand as much as possible. Next, the effectiveness of the proposed methodology is verified by solving a multiobjective plan...
- 30 October 2006
- Published by Institute of Electrical and Electronics Engineers (IEEE)
- p. 3729-3735
The Interval Estimation of Parameters for Back-Propagation Network to Flood Discharge Forecasting
This study employs a back-propagation network as the main structure in flood forecasting to learn and demonstrate the sophisticated nonlinear mapping relationship. A self organizing map network with classification ability is also applied to the solutions and parameters of BPN model in the learning stage, to classify the network parameter rules and obtain the winning parameters. Hence, hydrologic data intervals can then be forecasted, with the outcomes from the previous stage used as the ranges of the parameters in the recall stage. Finally, the effectiveness of methodology is verified by solving a flood discharge forecasting problem in the Wu-Shi basin of Taiwan.
- 30 October 2006
- Published by Institute of Electrical and Electronics Engineers (IEEE)
- p. 3729-3735
The Interval Estimation of Parameters for Back-Propagation Network to Flood Discharge Forecasting
This study employs a back-propagation network as the main structure in flood forecasting to learn and demonstrate the sophisticated nonlinear mapping relationship. A self organizing map network with classification ability is also applied to the solutions and parameters of BPN model in the learning stage, to classify the network parameter rules and obtain the winning parameters. Hence, hydrologic data intervals can then be forecasted, with the outcomes from the previous stage used as the ranges of the parameters in the recall stage. Finally, the effectiveness of methodology is verified by solving a flood discharge forecasting problem in the Wu-Shi basin of Taiwan.
- 1 January 2006
- Published by Institute of Electrical and Electronics Engineers (IEEE)
- No. 21614393,p. 3729-3735
The Interval Estimation of Parameters for Back-Propagation Network to Flood Discharge Forecasting
This study employs a back-propagation network as the main structure in flood forecasting to learn and demonstrate the sophisticated nonlinear mapping relationship. A self organizing map network with classification ability is also applied to the solutions and parameters of BPN model in the learning stage, to classify the network parameter rules and obtain the winning parameters. Hence, hydrologic data intervals can then be forecasted, with the outcomes from the previous stage used as the ranges of the parameters in the recall stage. Finally, the effectiveness of methodology is verified by solving a flood discharge forecasting problem in the Wu-Shi basin of Taiwan.
- 1 January 2006
- Published by Institute of Electrical and Electronics Engineers (IEEE)
- No. 21614393,p. 3729-3735
The Interval Estimation of Parameters for Back-Propagation Network to Flood Discharge Forecasting
This study employs a back-propagation network as the main structure in flood forecasting to learn and demonstrate the sophisticated nonlinear mapping relationship. A self organizing map network with classification ability is also applied to the solutions and parameters of BPN model in the learning stage, to classify the network parameter rules and obtain the winning parameters. Hence, hydrologic data intervals can then be forecasted, with the outcomes from the previous stage used as the ranges of the parameters in the recall stage. Finally, the effectiveness of methodology is verified by solving a flood discharge forecasting problem in the Wu-Shi basin of Taiwan.