John W. Mamer
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Research Subjects
Research Interests
John W. Mamer has a total of 2 co-authors. Here are the top co-authors by number of shared publications:
- Stephen A. Smith
Santa Clara University
3 shared publications - Steven A. Lippman
The John E. Anderson School of Management at UCLA, Los Angeles, CA 90095-1481
1 shared publication
Latest Publications
- 16 March 2009
- Published by Walter de Gruyter GmbH in The B.E. Journal of Theoretical Economics
- Vol. 9 (1)
Sale of a Deteriorating Asset via Sequential Search
We consider the sale of an asset via sequential search over a finite time horizon and analyze the problem in both the posted price and the reservation price regimes. The distinguishing feature of this search model is the fact that the asset deteriorates with the passage of time. Under mild conditions, we show that the seller's optimal posted price (and the seller's optimal reservation price) per remaining unit of the asset decreases as time passes.
- 16 March 2009
- Published by Walter de Gruyter GmbH in The B.E. Journal of Theoretical Economics
- Vol. 9 (1)
Sale of a Deteriorating Asset via Sequential Search
We consider the sale of an asset via sequential search over a finite time horizon and analyze the problem in both the posted price and the reservation price regimes. The distinguishing feature of this search model is the fact that the asset deteriorates with the passage of time. Under mild conditions, we show that the seller's optimal posted price (and the seller's optimal reservation price) per remaining unit of the asset decreases as time passes.
- 18 August 1988
- Published by Defense Technical Information Center (DTIC)
Job-Fill Inventories for Sequences of Jobs
We consider the problem of determining optimal stock levels for a multi-item inventory system in which demands for items occur in randomly selected groups, causing interdependent demand processes. This structure introduces dependencies that significantly affect the selection of item stock levels in systems whose performance is measured in terms of number of jobs completed or time until first stockout. Performance bounds and stock level selection techniques for several such systems are developed and analyzed.
- 18 August 1988
- Published by Defense Technical Information Center (DTIC)
Job-Fill Inventories for Sequences of Jobs
We consider the problem of determining optimal stock levels for a multi-item inventory system in which demands for items occur in randomly selected groups, causing interdependent demand processes. This structure introduces dependencies that significantly affect the selection of item stock levels in systems whose performance is measured in terms of number of jobs completed or time until first stockout. Performance bounds and stock level selection techniques for several such systems are developed and analyzed.
- 1 February 1988
- Published by Defense Technical Information Center (DTIC)
A Lower Bound Heuristic for Selecting Multi-Item Inventories for a General Job Completion Objective
When an inventory of multiple items is used to support the completion of an overall job or mission, commonly used inventory service level measures which are defined in terms of item availability are not appropriate. This paper develops a general model for problems of this type in which item demands are also interdependent. A heuristic is derived for determining stock levels that are guaranteed to satisfy the given inventory system performance objective, but at a slightly higher cost than would be achieved by the true optimum.
- 1 February 1988
- Published by Defense Technical Information Center (DTIC)
A Lower Bound Heuristic for Selecting Multi-Item Inventories for a General Job Completion Objective
When an inventory of multiple items is used to support the completion of an overall job or mission, commonly used inventory service level measures which are defined in terms of item availability are not appropriate. This paper develops a general model for problems of this type in which item demands are also interdependent. A heuristic is derived for determining stock levels that are guaranteed to satisfy the given inventory system performance objective, but at a slightly higher cost than would be achieved by the true optimum.
- 1 June 1985
- Published by Institute for Operations Research and the Management Sciences (INFORMS) in Management Science
- Vol. 31 (6) , 703-718
Job Completion Based Inventory Systems: Optimal Policies for Repair Kits and Spare Machines
In this paper, we consider multi-item inventory systems that contain repair kits of spare parts and tools and may include an inventory of spare machines as well. Demands occur in the form of field repair jobs, each requiring some collection of parts and tools for completion. If any required part or tool is not in the repair kit, the repair job is “broken.” The penalty or inconvenience cost is assumed to be proportional to the number of broken jobs, regardless of the number of items short. Previous work on job completion based systems is summarized and new results for the optimal solutions are derived. A more general job completion based system is also analyzed, which allows a pool of spare machines to be used to satisfy demands which cannot be met with the repair kits. Techniques are presented for optimizing the trade-off between the inventory cost of repair kits plus spare machines and the overall level of service.
- 1 June 1985
- Published by Institute for Operations Research and the Management Sciences (INFORMS) in Management Science
- Vol. 31 (6) , 703-718
Job Completion Based Inventory Systems: Optimal Policies for Repair Kits and Spare Machines
In this paper, we consider multi-item inventory systems that contain repair kits of spare parts and tools and may include an inventory of spare machines as well. Demands occur in the form of field repair jobs, each requiring some collection of parts and tools for completion. If any required part or tool is not in the repair kit, the repair job is “broken.” The penalty or inconvenience cost is assumed to be proportional to the number of broken jobs, regardless of the number of items short. Previous work on job completion based systems is summarized and new results for the optimal solutions are derived. A more general job completion based system is also analyzed, which allows a pool of spare machines to be used to satisfy demands which cannot be met with the repair kits. Techniques are presented for optimizing the trade-off between the inventory cost of repair kits plus spare machines and the overall level of service.