Young Hoon Lee
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Previous Organizations / Institutes
The organizations / institutes from the scholar's other articles in the past ten years
Research Subjects
Young Hoon Lee has a total of 60 co-authors. Here are the top co-authors by number of shared publications:
Sun Hoon Kim
Yonsei University
3 shared publicationsB. Lee
Department of Information and Industrial Engineering, Yonsei University, 134 Shinchon-dong Seodaemoon-Gu, Seoul 120-749, Korea
2 shared publications- Gwang Seok Kim
Department of Industrial Engineering, Yonsei University, Seoul 03722, Korea
2 shared publications Jeong Woo Kim
Yonsei University
2 shared publicationsKyung Hwan Kang
Department of Information and Industrial Engineering, Yonsei University, 134 Shinchon-Dong, Seodaemun-Gu, Seoul 120-749, Republic of Korea
2 shared publications- Seunghoon Lee
Department of Industrial Management Engineering, Dong-A University, Busan, Republic of Korea
2 shared publications
Latest Publications
- Open Access
- 11 November 2021
- Published by MDPI AG in Sustainability
- Vol. 13 (22) , 12458
Speed and Sustainability When Entering New Market
When constructing a factory to enter new markets, the optimal size to respond to demand is determined by the construction time. Hyundai Motor Company (Hyundai), on the other hand, standardizes the size of its factories to speed up the entry and response to demand. The Hyundai’s entry mode, called SPEED, is modeled as a strategy. The strategy is evaluated of excellence with capacity expansion rules formalized, key parameters identified, and mathematical programming. The SPEED strategy is suited for market followers who want to enter a midscale or mature market in terms of business excellence and more sustainable throughout the factory’s life cycle on the side of sustainability. Shorter construction times, as a result of the SPEED strategy, can help to prevent environmental damage while also standardization can increase job prospects for local workers.
- 11 November 2021
- Published by MDPI AG in Sustainability
- Vol. 13 (22) , 12458
Open AccessSpeed and Sustainability When Entering New Market
When constructing a factory to enter new markets, the optimal size to respond to demand is determined by the construction time. Hyundai Motor Company (Hyundai), on the other hand, standardizes the size of its factories to speed up the entry and response to demand. The Hyundai’s entry mode, called SPEED, is modeled as a strategy. The strategy is evaluated of excellence with capacity expansion rules formalized, key parameters identified, and mathematical programming. The SPEED strategy is suited for market followers who want to enter a midscale or mature market in terms of business excellence and more sustainable throughout the factory’s life cycle on the side of sustainability. Shorter construction times, as a result of the SPEED strategy, can help to prevent environmental damage while also standardization can increase job prospects for local workers.
- Open Access
Transformation towards a Smart Maintenance Factory: The Case of a Vessel Maintenance Depot
The conceptualization and framework of smart factories have been intensively studied in previous studies, and the extension to various business areas has been suggested as a future research direction. This paper proposes a method for extending the smart factory concept in the ship building phase to the ship servicing phase through actual examples. In order to expand the study, we identified the differences between manufacturing and maintenance. We proposed a smart transformation procedure, framework, and architecture of a smart maintenance factory. The transformation was a large-scale operation for the entire factory beyond simply applying a single process or specific technology. The transformations were presented through a vessel maintenance depot case and the effects of improvements were discussed.
Open AccessTransformation towards a Smart Maintenance Factory: The Case of a Vessel Maintenance Depot
The conceptualization and framework of smart factories have been intensively studied in previous studies, and the extension to various business areas has been suggested as a future research direction. This paper proposes a method for extending the smart factory concept in the ship building phase to the ship servicing phase through actual examples. In order to expand the study, we identified the differences between manufacturing and maintenance. We proposed a smart transformation procedure, framework, and architecture of a smart maintenance factory. The transformation was a large-scale operation for the entire factory beyond simply applying a single process or specific technology. The transformations were presented through a vessel maintenance depot case and the effects of improvements were discussed.
- Open Access
- 1 May 2021
- Published by Elsevier in Physical Therapy in Sport
- Vol. 49, 106-111
Review of physiotherapy service for athletes of 2018 Olympic Winter games: Consideration of preparation for two polyclinics
- 1 May 2021
- Published by Elsevier in Physical Therapy in Sport
- Vol. 49, 106-111
Open AccessReview of physiotherapy service for athletes of 2018 Olympic Winter games: Consideration of preparation for two polyclinics
- Open Access
- 21 October 2020
- Published by MDPI AG in Sustainability
- Vol. 12 (20) , 8718
Injection Mold Production Sustainable Scheduling Using Deep Reinforcement Learning
In the injection mold industry, it is important for manufacturers to satisfy the delivery date for the products that customers order. The mold products are diverse, and each product has a different manufacturing process. Owing to the nature of mold, mold manufacturing is a complex and dynamic environment. To meet the delivery date of the customers, the scheduling of mold production is important and is required to be sustainable and intelligent even in the complicated system and dynamic situation. To address this, in this paper, deep reinforcement learning (RL) is proposed for injection mold production scheduling. Before presenting the RL algorithm, a mathematical model for the mold scheduling problem is presented, and a Markov decision process framework is proposed for RL. The deep -network, which is an algorithm for RL, is employed to find the scheduling policy to minimize the total weighted tardiness. The results of experiments demonstrate that the proposed deep RL method outperforms the dispatching rules that are presented for minimizing the total weighted tardiness.- 21 October 2020
- Published by MDPI AG in Sustainability
- Vol. 12 (20) , 8718
Open AccessInjection Mold Production Sustainable Scheduling Using Deep Reinforcement Learning
In the injection mold industry, it is important for manufacturers to satisfy the delivery date for the products that customers order. The mold products are diverse, and each product has a different manufacturing process. Owing to the nature of mold, mold manufacturing is a complex and dynamic environment. To meet the delivery date of the customers, the scheduling of mold production is important and is required to be sustainable and intelligent even in the complicated system and dynamic situation. To address this, in this paper, deep reinforcement learning (RL) is proposed for injection mold production scheduling. Before presenting the RL algorithm, a mathematical model for the mold scheduling problem is presented, and a Markov decision process framework is proposed for RL. The deep -network, which is an algorithm for RL, is employed to find the scheduling policy to minimize the total weighted tardiness. The results of experiments demonstrate that the proposed deep RL method outperforms the dispatching rules that are presented for minimizing the total weighted tardiness. - Open Access
- 12 August 2020
- Published by MDPI AG in Healthcare
- Vol. 8 (3) , 266
Centralized Ambulance Diversion Policy Using Rolling-Horizon Optimization Framework to Minimize Patient Tardiness
Ambulance diversion (AD) is a common method for reducing crowdedness of emergency departments by diverting ambulance-transported patients to a neighboring hospital. In a multi-hospital system, the AD of one hospital increases the neighboring hospital’s congestion. This should be carefully considered for minimizing patients’ tardiness in the entire multi-hospital system. Therefore, this paper proposes a centralized AD policy based on a rolling-horizon optimization framework. It is an iterative methodology for coping with uncertainty, which first solves the centralized optimization model formulated as a mixed-integer linear programming model at each discretized time, and then moves forward for the time interval reflecting the realized uncertainty. Furthermore, the decentralized optimization, decentralized priority, and No-AD models are presented for practical application, which can also show the impact of using the following three factors: centralization, mathematical model, and AD strategy. The numerical experiments conducted based on the historical data of Seoul, South Korea, for 2017, show that the centralized AD policy outperforms the other three policies by 30%, 37%, and 44%, respectively, and that all three factors contribute to reducing patients’ tardiness. The proposed policy yields an efficient centralized AD management strategy, which can improve the local healthcare system with active coordination between hospitals.
- 12 August 2020
- Published by MDPI AG in Healthcare
- Vol. 8 (3) , 266
Open AccessCentralized Ambulance Diversion Policy Using Rolling-Horizon Optimization Framework to Minimize Patient Tardiness
Ambulance diversion (AD) is a common method for reducing crowdedness of emergency departments by diverting ambulance-transported patients to a neighboring hospital. In a multi-hospital system, the AD of one hospital increases the neighboring hospital’s congestion. This should be carefully considered for minimizing patients’ tardiness in the entire multi-hospital system. Therefore, this paper proposes a centralized AD policy based on a rolling-horizon optimization framework. It is an iterative methodology for coping with uncertainty, which first solves the centralized optimization model formulated as a mixed-integer linear programming model at each discretized time, and then moves forward for the time interval reflecting the realized uncertainty. Furthermore, the decentralized optimization, decentralized priority, and No-AD models are presented for practical application, which can also show the impact of using the following three factors: centralization, mathematical model, and AD strategy. The numerical experiments conducted based on the historical data of Seoul, South Korea, for 2017, show that the centralized AD policy outperforms the other three policies by 30%, 37%, and 44%, respectively, and that all three factors contribute to reducing patients’ tardiness. The proposed policy yields an efficient centralized AD management strategy, which can improve the local healthcare system with active coordination between hospitals.
- Open Access
- 27 March 2020
- Published by MDPI AG in Healthcare
- Vol. 8 (2) , 77
Improving Emergency Department Efficiency by Patient Scheduling Using Deep Reinforcement Learning
Emergency departments (ED) in hospitals usually suffer from crowdedness and long waiting times for treatment. The complexity of the patient’s path flows and their controls come from the patient’s diverse acute level, personalized treatment process, and interconnected medical staff and resources. One of the factors, which has been controlled, is the dynamic situation change such as the patient’s composition and resources’ availability. The patient’s scheduling is thus complicated in consideration of various factors to achieve ED efficiency. To address this issue, a deep reinforcement learning (RL) is designed and applied in an ED patients’ scheduling process. Before applying the deep RL, the mathematical model and the Markov decision process (MDP) for the ED is presented and formulated. Then, the algorithm of the RL based on deep -networks (DQN) is designed to determine the optimal policy for scheduling patients. To evaluate the performance of the deep RL, it is compared with the dispatching rules presented in the study. The deep RL is shown to outperform the dispatching rules in terms of minimizing the weighted waiting time of the patients and the penalty of emergent patients in the suggested scenarios. This study demonstrates the successful implementation of the deep RL for ED applications, particularly in assisting decision-makers under the dynamic environment of an ED.- 27 March 2020
- Published by MDPI AG in Healthcare
- Vol. 8 (2) , 77
Open AccessImproving Emergency Department Efficiency by Patient Scheduling Using Deep Reinforcement Learning
Emergency departments (ED) in hospitals usually suffer from crowdedness and long waiting times for treatment. The complexity of the patient’s path flows and their controls come from the patient’s diverse acute level, personalized treatment process, and interconnected medical staff and resources. One of the factors, which has been controlled, is the dynamic situation change such as the patient’s composition and resources’ availability. The patient’s scheduling is thus complicated in consideration of various factors to achieve ED efficiency. To address this issue, a deep reinforcement learning (RL) is designed and applied in an ED patients’ scheduling process. Before applying the deep RL, the mathematical model and the Markov decision process (MDP) for the ED is presented and formulated. Then, the algorithm of the RL based on deep -networks (DQN) is designed to determine the optimal policy for scheduling patients. To evaluate the performance of the deep RL, it is compared with the dispatching rules presented in the study. The deep RL is shown to outperform the dispatching rules in terms of minimizing the weighted waiting time of the patients and the penalty of emergent patients in the suggested scenarios. This study demonstrates the successful implementation of the deep RL for ED applications, particularly in assisting decision-makers under the dynamic environment of an ED. - 9 July 2016
- Published by Springer Nature in Operational Research
- Vol. 18 (1) , 75-95
Moment-based approximations for first- and second-order transient performance measures of an unreliable workstation
- 9 July 2016
- Published by Springer Nature in Operational Research
- Vol. 18 (1) , 75-95
Moment-based approximations for first- and second-order transient performance measures of an unreliable workstation
- 21 August 2014
- Published by Springer Nature in The International Journal of Advanced Manufacturing Technology
- Vol. 75 (9) , 1381-1391
Simulation-based optimal production planning model using dynamic lead time estimation
- 21 August 2014
- Published by Springer Nature in The International Journal of Advanced Manufacturing Technology
- Vol. 75 (9) , 1381-1391
Simulation-based optimal production planning model using dynamic lead time estimation
- 12 May 2013
- Published by Springer Nature in The International Journal of Advanced Manufacturing Technology
- Vol. 69 (1-4) , 383-396
Discrete lot sizing and scheduling problem under batch processing constraints in the semiconductor manufacturing
- 12 May 2013
- Published by Springer Nature in The International Journal of Advanced Manufacturing Technology
- Vol. 69 (1-4) , 383-396
Discrete lot sizing and scheduling problem under batch processing constraints in the semiconductor manufacturing