Farhad Kianfar
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Farhad Kianfar has a total of 5 co-authors. Here are the top co-authors by number of shared publications:
- Majid Rafiee
Sharif University of Technology
2 shared publications H. Safarzadeh
Department of Industrial Engineering, Sharif University of Technology, Tehran, Iran
1 shared publicationHamid Safarzadeh
Department of Industrial Engineering, Sharif University of Technology, Tehran, Iran
1 shared publication- Mehdi Farhadkhani
Sharif University of Technology
1 shared publication - Mohammad Mahdi Nasiri
Department of Industrial Engineering, College of Engineering, University of Tehran, Tehran, Iran
1 shared publication
Latest Publications
- 1 January 2022
- Published by International Digital Organization for Scientific Information (IDOSI) in International Journal of Engineering
- Vol. 35 (5) , 1006-1016
Single Machine Scheduling Problem with Batch Outsourcing
Outsourcing as a useful strategy in the industry can be integrated into scheduling problems. Moreover, batch outsourcing is a practical assumption owing to the logistics issues for transferring the parts between the manufacturer and the subcontractors. However, this assumption is rarely addressed in the scheduling literature. In this paper, a novel single machine scheduling problem with the option of batch outsourcing is studied. The objective is to minimize the sum of the total completion time of the jobs and the total outsourcing cost. To solve the problem, first, two mixed-integer linear programming (MILP) models, named MP1 and MP2, are developed, which respectively use a straightforward and an innovative approach to model the outsourcing batches. Next, an optimal property for the outsourcing batches is proven. This property is used to establish a valid inequality for model MP2, which is added to it to obtain a third MILP model, MP3. Extensive computational experiments showed that MP2 outperforms MP1 significantly. Moreover, including the derived valid inequality in MP3 enhances its performance considerably in comparing to MP2. Furthermore, it is observed that MP3 is capable of solving many practical-size problem instances optimally or with a low maximum optimality gap.
- 1 January 2022
- Published by International Digital Organization for Scientific Information (IDOSI) in International Journal of Engineering
- Vol. 35 (5) , 1006-1016
Single Machine Scheduling Problem with Batch Outsourcing
Outsourcing as a useful strategy in the industry can be integrated into scheduling problems. Moreover, batch outsourcing is a practical assumption owing to the logistics issues for transferring the parts between the manufacturer and the subcontractors. However, this assumption is rarely addressed in the scheduling literature. In this paper, a novel single machine scheduling problem with the option of batch outsourcing is studied. The objective is to minimize the sum of the total completion time of the jobs and the total outsourcing cost. To solve the problem, first, two mixed-integer linear programming (MILP) models, named MP1 and MP2, are developed, which respectively use a straightforward and an innovative approach to model the outsourcing batches. Next, an optimal property for the outsourcing batches is proven. This property is used to establish a valid inequality for model MP2, which is added to it to obtain a third MILP model, MP3. Extensive computational experiments showed that MP2 outperforms MP1 significantly. Moreover, including the derived valid inequality in MP3 enhances its performance considerably in comparing to MP2. Furthermore, it is observed that MP3 is capable of solving many practical-size problem instances optimally or with a low maximum optimality gap.
- 28 September 2018
- Published by Taylor & Francis in International Journal of Production Research
- Vol. 57 (10) , 3255-3272
Job shop scheduling with the option of jobs outsourcing
Incorporating outsourcing in scheduling is addressed by several researchers recently. However, this scope is not investigated thoroughly, particularly in the job shop environment. In this paper, a new job shop scheduling problem is studied with the option of jobs outsourcing. The problem objective is to minimise a weighted sum of makespan and total outsourcing cost. With the aim of solving this problem optimally, two solution approaches of combinatorial optimisation problems, i.e. mathematical programming and constraint programming are examined. Furthermore, two problem relaxation approaches are developed to obtain strong lower bounds for some large scale problems for which the optimality is not proven by the applied solution techniques. Using extensive numerical experiments, the performance of the solution approaches is evaluated. Moreover, the effect the objectives's weights in the objective function on the performance of the solution approaches is also investigated. It is concluded that constraint programming outperforms mathematical programming significantly in proving solution optimality, as it can solve small and medium size problems optimally. Moreover, by solving the relaxed problems, one can obtain good lower bounds for optimal solutions even in some large scale problems.
- 28 September 2018
- Published by Taylor & Francis in International Journal of Production Research
- Vol. 57 (10) , 3255-3272
Job shop scheduling with the option of jobs outsourcing
Incorporating outsourcing in scheduling is addressed by several researchers recently. However, this scope is not investigated thoroughly, particularly in the job shop environment. In this paper, a new job shop scheduling problem is studied with the option of jobs outsourcing. The problem objective is to minimise a weighted sum of makespan and total outsourcing cost. With the aim of solving this problem optimally, two solution approaches of combinatorial optimisation problems, i.e. mathematical programming and constraint programming are examined. Furthermore, two problem relaxation approaches are developed to obtain strong lower bounds for some large scale problems for which the optimality is not proven by the applied solution techniques. Using extensive numerical experiments, the performance of the solution approaches is evaluated. Moreover, the effect the objectives's weights in the objective function on the performance of the solution approaches is also investigated. It is concluded that constraint programming outperforms mathematical programming significantly in proving solution optimality, as it can solve small and medium size problems optimally. Moreover, by solving the relaxed problems, one can obtain good lower bounds for optimal solutions even in some large scale problems.
- 13 November 2013
- Published by Springer Nature in The International Journal of Advanced Manufacturing Technology
- Vol. 70 (9-12) , 2125-2137
A multistage stochastic programming approach in project selection and scheduling
- 13 November 2013
- Published by Springer Nature in The International Journal of Advanced Manufacturing Technology
- Vol. 70 (9-12) , 2125-2137
A multistage stochastic programming approach in project selection and scheduling
- 29 March 2011
- Published by Springer Nature in The International Journal of Advanced Manufacturing Technology
- Vol. 56 (1-4) , 411-420
A scenario tree approach to multi-period project selection problem using real-option valuation method
- 29 March 2011
- Published by Springer Nature in The International Journal of Advanced Manufacturing Technology
- Vol. 56 (1-4) , 411-420
A scenario tree approach to multi-period project selection problem using real-option valuation method
- 4 July 2010
- Published by Springer Nature in The International Journal of Advanced Manufacturing Technology
- Vol. 52 (9-12) , 1031-1038
A hybrid scatter search for the partial job shop scheduling problem
- 4 July 2010
- Published by Springer Nature in The International Journal of Advanced Manufacturing Technology
- Vol. 52 (9-12) , 1031-1038
A hybrid scatter search for the partial job shop scheduling problem