D. Hirakawa
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Previous Organizations / Institutes
The organizations / institutes from the scholar's other articles in the past ten years
Research Subjects
D. Hirakawa has a total of 18 co-authors. Here are the top co-authors by number of shared publications:
- Tatsuoka Fumio
Department of Civil Engineering, University of Tokyo
6 shared publications W. Kongkitkul
5 shared publications- Fumio Tatsuoka
東京大学・東京理科大
3 shared publications T. Uchimura
3 shared publications- H. Nishikiori
Engineer, Department of Civil Engineering, Ibaraki Prefecture, 978-6 Kasahara, Mito City, Ibaraki Prefecture, Japan, Telephone: +81 29 301 4530, Telefax: +81 29 301 4538
2 shared publications - K. Watanabe
Assistant Senior Researcher, Foundation and Geotechnical Engineering Structures Technology Division, Railway Technical Research Institute, Japan, 2-8-38, Hikari-cho, Kokubunji City, Tokyo, 185-8540, Japan, Telephone: +81 42 573 7261, Telefax: +81 42 573 7248
2 shared publications
Latest Publications
- 1 February 2012
- Published by Emerald Publishing in Geosynthetics International
- Vol. 19 (1) , 11-38
Dynamic stability of geosynthetic-reinforced soil integral bridge
To evaluate the dynamic stability of different bridge types, the results from a series of shaking-table tests on small-scale models of the following bridge types were analysed within the framework of the single-degree-of-freedom theory: (1) a conventional bridge (CB), comprising a girder (i.e. deck) supported via a pair of movable and fixed bearings (i.e. shoes) by gravity-type abutments (without a pile foundation) having unreinforced backfill; (2) a GRS-RW bridge, comprising a girder supported via a pair of movable and fixed bearings by a pair of sill beams placed on the crest of a pair of geosynthetic-reinforced soil-retaining walls (GRS-RWs) having a stage-constructed full-height rigid facing; (3) an integral bridge (IB), comprising a girder integrated to a pair of abutments (without bearings) and unreinforced backfill; (4) a GRS integral bridge, comprising a girder integrated to the abutments (in the same way as the IB bridge) while the backfill is reinforced with geosynthetic layers connected to the facings (in the same way as the GRS-RW bridge); and (5) a GRS integral bridge with a cement-mixed soil zone of rectangular prismatic or trapezoidal shape immediately behind the facing. The following is shown: the stability of the bridge against dynamic excitations increases: (1) with an increase in the initial natural frequency via an increase in the initial stiffness; (2) with a decrease in the decreasing rate of stiffness during cyclic loading (i.e. an increase in the dynamic ductility); (3) with an increase in the damping energy dissipation capacity near and at failure; and (4) with an increase in the dynamic strength. With the GRS integral bridge, the structural integration and geosynthetic-reinforcing of the backfill, as well as cement-mixing of the backfill immediately behind the facings, all contribute to the evolution of these four factors. The natural frequency can then always be kept much higher than the predominant frequency of ordinary design earthquake motion, the response acceleration is kept sufficiently low, and the dynamic stability can be kept very high.
- 1 February 2012
- Published by Emerald Publishing in Geosynthetics International
- Vol. 19 (1) , 11-38
Dynamic stability of geosynthetic-reinforced soil integral bridge
To evaluate the dynamic stability of different bridge types, the results from a series of shaking-table tests on small-scale models of the following bridge types were analysed within the framework of the single-degree-of-freedom theory: (1) a conventional bridge (CB), comprising a girder (i.e. deck) supported via a pair of movable and fixed bearings (i.e. shoes) by gravity-type abutments (without a pile foundation) having unreinforced backfill; (2) a GRS-RW bridge, comprising a girder supported via a pair of movable and fixed bearings by a pair of sill beams placed on the crest of a pair of geosynthetic-reinforced soil-retaining walls (GRS-RWs) having a stage-constructed full-height rigid facing; (3) an integral bridge (IB), comprising a girder integrated to a pair of abutments (without bearings) and unreinforced backfill; (4) a GRS integral bridge, comprising a girder integrated to the abutments (in the same way as the IB bridge) while the backfill is reinforced with geosynthetic layers connected to the facings (in the same way as the GRS-RW bridge); and (5) a GRS integral bridge with a cement-mixed soil zone of rectangular prismatic or trapezoidal shape immediately behind the facing. The following is shown: the stability of the bridge against dynamic excitations increases: (1) with an increase in the initial natural frequency via an increase in the initial stiffness; (2) with a decrease in the decreasing rate of stiffness during cyclic loading (i.e. an increase in the dynamic ductility); (3) with an increase in the damping energy dissipation capacity near and at failure; and (4) with an increase in the dynamic strength. With the GRS integral bridge, the structural integration and geosynthetic-reinforcing of the backfill, as well as cement-mixing of the backfill immediately behind the facings, all contribute to the evolution of these four factors. The natural frequency can then always be kept much higher than the predominant frequency of ordinary design earthquake motion, the response acceleration is kept sufficiently low, and the dynamic stability can be kept very high.
- 1 February 2010
- Published by Emerald Publishing in Geosynthetics International
- Vol. 17 (1) , 12-32
Time histories of tensile force in geogrid arranged in two full-scale high walls
Two tall geosynthetic-reinforced soil (GRS) walls, one 16.7 m high supporting a sloped embankment, and the other 21.1 m high with a level backfill, were constructed to support the taxi way of Mt. Fuji Shizuoka Airport, Shizuoka Prefecture, Japan, which was opened to service in June 2009. As only limited residual deformation during service is allowed and high stability is required, the backfill was a well-graded gravelly soil, which was well compacted at controlled water content and reinforced with geogrid reinforcement. In the respective walls, three representative geogrid layers were fitted with a number of electric-resistance strain gauges to monitor the geogrid tensile strains during and after construction to ensure high stability and sufficient serviceability. After the wall construction had been completed, the geogrid strains were either only increasing at a very low rate, or had stopped increasing, or had started decreasing. A series of in-air tensile loading tests were performed on different geogrid types used for the wall construction to evaluate their elasto-viscoplastic properties. The time histories of tensile force in the geogrid layers were estimated from the measured time histories of the geogrid strains based on a non-linear three-component rheology model using the model parameters determined by the in-air tensile loading tests. After the end of wall construction, the estimated geogrid tensile force was either increasing at a very low rate or was decreasing with time. Even at the locations where it tended to increase with time, the estimated geogrid tensile force never increased greatly by the end of a typical design life (i.e. 50 years) from the value at the end of wall construction. As the estimated maximum geogrid force at the end of the design lifetime is substantially lower than the respective design tensile rupture strengths, it is estimated that creep rupture failure of the geogrid is utterly unlikely. The analysis suggests that these estimates are also relevant when the lifetime is 100 years. The framework to estimate the time histories of reinforcement force from the time histories of measured reinforcement strains used in this study can be applied to other similar cases.
- 1 February 2010
- Published by Emerald Publishing in Geosynthetics International
- Vol. 17 (1) , 12-32
Time histories of tensile force in geogrid arranged in two full-scale high walls
Two tall geosynthetic-reinforced soil (GRS) walls, one 16.7 m high supporting a sloped embankment, and the other 21.1 m high with a level backfill, were constructed to support the taxi way of Mt. Fuji Shizuoka Airport, Shizuoka Prefecture, Japan, which was opened to service in June 2009. As only limited residual deformation during service is allowed and high stability is required, the backfill was a well-graded gravelly soil, which was well compacted at controlled water content and reinforced with geogrid reinforcement. In the respective walls, three representative geogrid layers were fitted with a number of electric-resistance strain gauges to monitor the geogrid tensile strains during and after construction to ensure high stability and sufficient serviceability. After the wall construction had been completed, the geogrid strains were either only increasing at a very low rate, or had stopped increasing, or had started decreasing. A series of in-air tensile loading tests were performed on different geogrid types used for the wall construction to evaluate their elasto-viscoplastic properties. The time histories of tensile force in the geogrid layers were estimated from the measured time histories of the geogrid strains based on a non-linear three-component rheology model using the model parameters determined by the in-air tensile loading tests. After the end of wall construction, the estimated geogrid tensile force was either increasing at a very low rate or was decreasing with time. Even at the locations where it tended to increase with time, the estimated geogrid tensile force never increased greatly by the end of a typical design life (i.e. 50 years) from the value at the end of wall construction. As the estimated maximum geogrid force at the end of the design lifetime is substantially lower than the respective design tensile rupture strengths, it is estimated that creep rupture failure of the geogrid is utterly unlikely. The analysis suggests that these estimates are also relevant when the lifetime is 100 years. The framework to estimate the time histories of reinforcement force from the time histories of measured reinforcement strains used in this study can be applied to other similar cases.
- 1 August 2009
- Published by Emerald Publishing in Geosynthetics International
- Vol. 16 (4) , 301-326
A new type of integral bridge comprising geosynthetic-reinforced soil walls
Integral bridges, comprising a continuous bridge girder (i.e. deck) integrated to a pair of abutments without using hinged and movable shoes (i.e. bearings), have been constructed to alleviate several inherent drawbacks of conventional bridges. It is shown that this conventional type of integral bridge still has the following problems: (1) large residual settlements in the backfill, developing a bump immediately behind the abutments, and the development of high residual earth pressure on the back of the abutments by seasonal thermal expansion and contraction of the girder, as well as by traffic loads on the backfill; and (2) large detrimental deformation of the backfill by seismic loads. To alleviate these problems, it is proposed to reinforce the backfill with geosynthetic reinforcement that is firmly connected to the full-height rigid facings (i.e. abutments). A newly proposed integral bridge, called the GRS integral bridge, is constructed in stages: first, geosynthetic-reinforced backfill; second, pile foundations (if necessary); third, full-height rigid (FHR) facings (i.e. abutments); and finally a continuous girder integrated to the top of the two abutments, without using shoes. A series of static cyclic loading tests, laterally on the facing and vertically on the crest of the backfill, and shaking-table tests were performed on models of the conventional and new types of integral bridge, as well as two conventional bridge types comprising RC gravity-type abutments and geosynthetic-reinforced soil-retaining walls, both supporting a girder via shoes. The test results showed high static and dynamic performance of the GRS integral bridge, despite its simple structure and construction procedure, and therefore its low construction cost.
- 1 August 2009
- Published by Emerald Publishing in Geosynthetics International
- Vol. 16 (4) , 301-326
A new type of integral bridge comprising geosynthetic-reinforced soil walls
Integral bridges, comprising a continuous bridge girder (i.e. deck) integrated to a pair of abutments without using hinged and movable shoes (i.e. bearings), have been constructed to alleviate several inherent drawbacks of conventional bridges. It is shown that this conventional type of integral bridge still has the following problems: (1) large residual settlements in the backfill, developing a bump immediately behind the abutments, and the development of high residual earth pressure on the back of the abutments by seasonal thermal expansion and contraction of the girder, as well as by traffic loads on the backfill; and (2) large detrimental deformation of the backfill by seismic loads. To alleviate these problems, it is proposed to reinforce the backfill with geosynthetic reinforcement that is firmly connected to the full-height rigid facings (i.e. abutments). A newly proposed integral bridge, called the GRS integral bridge, is constructed in stages: first, geosynthetic-reinforced backfill; second, pile foundations (if necessary); third, full-height rigid (FHR) facings (i.e. abutments); and finally a continuous girder integrated to the top of the two abutments, without using shoes. A series of static cyclic loading tests, laterally on the facing and vertically on the crest of the backfill, and shaking-table tests were performed on models of the conventional and new types of integral bridge, as well as two conventional bridge types comprising RC gravity-type abutments and geosynthetic-reinforced soil-retaining walls, both supporting a girder via shoes. The test results showed high static and dynamic performance of the GRS integral bridge, despite its simple structure and construction procedure, and therefore its low construction cost.
- 1 January 2004
- Published by Japan Chapter of International Geosynthetics Society in Jioshinsetikkusu Rombunshu (Geosynthetics Engineering Journal)
- Vol. 19, 237-244
FEM simulation of viscous behaviour of geogrid and geogrid-reinforced sand
- 1 January 2004
- Published by Japan Chapter of International Geosynthetics Society in Jioshinsetikkusu Rombunshu (Geosynthetics Engineering Journal)
- Vol. 19, 237-244
FEM simulation of viscous behaviour of geogrid and geogrid-reinforced sand
- 1 January 2003
- Published by Japan Chapter of International Geosynthetics Society in Jioshinsetikkusu Rombunshu (Geosynthetics Engineering Journal)
- Vol. 18, 183-190
Simulation of cyclic loading tests on geosynthetic reinforcement
- 1 January 2003
- Published by Japan Chapter of International Geosynthetics Society in Jioshinsetikkusu Rombunshu (Geosynthetics Engineering Journal)
- Vol. 18, 183-190
Simulation of cyclic loading tests on geosynthetic reinforcement