Current Organizations / Institutes

The organizations/institutes from the scholar's latest article


Kyong Ju Kim has a total of 28 co-authors. Here are the top co-authors by number of shared publications:


Latest Publications

  • Open Access

    Improving a Maintenance Priority Index for Sustainable Urban Railway Track Management Using Facility Performance Evaluation Data

    by In Kyum Kim, Eu Wang Kim, Kyong Ju Kim

    Sustainable urban rail management requires directing limited budgets to sections where maintenance can most effectively extend asset life. Existing track performance evaluation systems guide maintenance priorities, but cost-effectiveness-based indices do not explicitly account for structural vulnerability. Using 4737 unit sections (462.1 km across eight urban railway lines), this study identified factors associated with low performance and developed an improved maintenance priority index. The lowest-performing 25% for each index served as the priority management group. Binary and ordinal logistic regression, with 5–30% cutoff sensitivity analyses, assessed associations with cumulative gross tonnage, trackbed type, and alignment condition. For the overall performance index, ballasted track (odds ratio = 2.17) and sharp curves (odds ratio = 2.38) were consistently associated with priority-group membership across cutoff and spatial-dependence checks. Predicted probabilities from the overall-performance model were converted to ratios relative to a baseline and applied to the existing index as structural-vulnerability weights. In the case application, weights reached 4.03 and changed 23 of 27 section rankings. By making structural vulnerability explicit, the index supports more transparent and resource-efficient maintenance prioritization under constrained budgets, longer component service life, and fewer premature renewals. Longitudinal data are required to test whether these rankings predict subsequent deterioration.

  • Open Access

    Challenges and Strategies for Resident Participation Ordinances to Prevent Construction Defects in Korean Local Governments

    by Eu Wang Kim, Kyong Ju Kim, Yeon Ju Shin, Namho Cho, Dong Cheol Shin

    Many Korean local governments have enacted ordinances that enable resident participation in the supervision of public construction projects, yet an implementation gap persists between the legal framework and actual engagement. This study thus examined causes of and strategies for residents’ participation in defect reporting and the role of resident supervisor using a sequential embedded design. Administrative data from local governments were analyzed, followed by 94 survey data from resident representatives. Awareness about the defect reporting and role of resident supervisor was low, while support and intention for participation were higher. Awareness, perceived ordinance effectiveness, and support for resident participation were associated with intention, whereas financial rewards showed no significant association. These results suggest that insufficient awareness and trust—not lack of motivation—are the primary barriers, indicating the need to shift from offering rewards to targeted communication, procedural transparency, and capacity-building. This study’s contribution is its mixed-methods empirical assessment of this gap, informing the design of resident-participation policies by prioritizing awareness campaigns, procedural transparency, and training for resident supervisors.

  • Open Access

    Development of an Automated Construction Contract Review Framework Using Large Language Model and Domain Knowledge

    by Eu Wang Kim, Yeon Ju Shin, Kyong Ju Kim, Sehoon Kwon

    Construction contract review demands specialized expertise, requiring comprehensive understanding of both technical and legal aspects. While AI advancements offer potential solutions, two problems exist: LLMs lack sufficient domain-specific knowledge to analyze construction contracts; existing RAG approaches do not effectively utilize domain expertise. This study aims to develop an automated contract review system that integrates domain expertise with AI capabilities while ensuring reliable analysis. By transforming expert knowledge into a structured knowledge base aligned with the SCF classification, the proposed structured knowledge-integrated RAG pipeline is expected to enable context-aware contract analysis. This enhanced performance is achieved through three key components: (1) integrating structured domain knowledge with LLMs, (2) implementing filtering combined with hybrid dense–sparse retrieval mechanisms, and (3) employing reference-based answer generation. Validation using Oman’s standard contract conditions demonstrated the system’s effectiveness in assisting construction professionals with contract analysis. Performance evaluation showed significant improvements, achieving a 52.6% improvement in Context Recall and a 48.3% improvement in Faithfulness compared to basic RAG approaches. This study contributes to enhancing the reliability of construction contract review by applying a structured knowledge-integrated RAG pipeline that enables the accurate retrieval of expert knowledge, thereby addressing the industry’s need for precise contract analysis.


  • Open Access

    Application Issues of Impacted As-Planned Schedule for Delay Analysis

    by Kyong Ju Kim, Bonghee Han, Min Seo Park, Kyoungmin Kim, Eu Wang Kim

    Most construction projects are delayed, and many are subject to claims or disputes. Therefore, delay analysis is a critical component of any construction project to determine who is responsible for delays. This research examines four different techniques for estimating delay impacts using the impacted as-planned (IAP) method. A sample network was introduced as an example to discuss several concerns. The advantages and limitations of each approach were identified, and recommendations were given for each approach. When inserting an activity or activities representing delay events in IAP, it is necessary to use both constraints and logical relations among delay events, their logical predecessors, and successors. Constraints representing the actual date of delay events are the simplest and easiest. However, constraints should not be used in “single insertion” and “inserting only owner- or contractor-caused delay” approach. In addition, in the case of using constraints, it is critical to ensure that the impact of delay events is less than the duration of those delay events. Constraints should be avoided in this scenario, and delay events should be logically connected to their logical predecessors and successors without constraints. This study also identified through an example that inserting delay events only by logic can cause wrong analysis results. The results of this study will be helpful for delay analysts in identifying what kinds of problems occur in IAP methods and how to prevent those problems.


  • Open Access

    Estimating approximate construction duration of CFRD in the planning stage

    by Kyong Ju Kim, Won Gun Yun, In Kyum Kim


  • Open Access

    Development of an automated As-planned schedule system for efficient scheduling

    by Kyong Ju Kim, Jin-Young Cho, Dong-Youl Lee, Min-Jae Lee


  • Analysis of Environmental Load by Work Classification for NATM Tunnels

    by Ju-Hyun Lee, Jin Ah Shim, Kyong Ju Kim

    Analysis of Environmental Load by Work Classification for NATM Tunnels NATM tunnel;Environmental load;Life cycle assessment;Life cycle inventory; Many countries are trying to reduce a greenhouse gas to step up their fight against climate change. There are many studies related to building only for reducing a greenhouse gas in construction area but studies related to reducing a comprehensive environmental load including various pollutants that affects the global environment are lacking. This study aims to analyse the characteristics of environmental load by work type for tunnel projects. Analysis showed that seven work types, including lining concrete, shotcrete, tunnel portal and open-cut tunnel work, etc., are representative works generated environmental load. These seven works represent 89.22 percent of total environmental load. In addition, comparison results of environmental load per tunnel's length by work type showed that a major factor of environmental load is caused by a tunnel portal and open-cut tunnel work with relatively short length (excavation length). And lining concrete and shotcrete work are larger than any other environmental load with tunnel's total length. It is expected that the result of this study will be used to make a estimation model for environmental load using approximate quantity survey of representative work types in the early stage of tunnel design. And it will be play a considerable role in establishing of environment management plan for sustainable infrastructure construction.


  • Open Access

    Schedule compression in tunneling projects by adjusting workflow variability

    by Kyong Ju Kim, Won Gun Yun, Ju-Hyun Lee, Kyoungmin Kim