Kyong Ju Kim
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Kyong Ju Kim has a total of 28 co-authors. Here are the top co-authors by number of shared publications:
- Kyoungmin Kim
Chung-Ang University
5 shared publications - Eu Wang Kim
Department of Civil, Environmental & Plant, Chung-Ang University, Seoul 06974, Republic of Korea
4 shared publications - In Kyum Kim
Department of Civil Engineering, Chung-Ang University, Seoul 06974, Republic of Korea
2 shared publications - Ju-Hyun Lee
Nathan Kline Institute for Psychiatric Research, Orangeburg, NY USA
2 shared publications - Namho Cho
Design and Construction, Facility Management, The University of Iowa, Iowa City, IA 52241, USA
2 shared publications - Yeon Ju Shin
Department of Civil & Environmental Engineering, Chung-Ang University, Seoul 06974, Republic of Korea
2 shared publications
Latest Publications
- Open Access
- 16 October 2026
- Published by MDPI AG in Sustainability
- Vol. 18 (20) , 10560
Improving a Maintenance Priority Index for Sustainable Urban Railway Track Management Using Facility Performance Evaluation Data
Sustainable urban rail management requires directing limited budgets to sections where maintenance can most effectively extend asset life. Existing track performance evaluation systems guide maintenance priorities, but cost-effectiveness-based indices do not explicitly account for structural vulnerability. Using 4737 unit sections (462.1 km across eight urban railway lines), this study identified factors associated with low performance and developed an improved maintenance priority index. The lowest-performing 25% for each index served as the priority management group. Binary and ordinal logistic regression, with 5–30% cutoff sensitivity analyses, assessed associations with cumulative gross tonnage, trackbed type, and alignment condition. For the overall performance index, ballasted track (odds ratio = 2.17) and sharp curves (odds ratio = 2.38) were consistently associated with priority-group membership across cutoff and spatial-dependence checks. Predicted probabilities from the overall-performance model were converted to ratios relative to a baseline and applied to the existing index as structural-vulnerability weights. In the case application, weights reached 4.03 and changed 23 of 27 section rankings. By making structural vulnerability explicit, the index supports more transparent and resource-efficient maintenance prioritization under constrained budgets, longer component service life, and fewer premature renewals. Longitudinal data are required to test whether these rankings predict subsequent deterioration.
- 16 October 2026
- Published by MDPI AG in Sustainability
- Vol. 18 (20) , 10560
Open AccessImproving a Maintenance Priority Index for Sustainable Urban Railway Track Management Using Facility Performance Evaluation Data
Sustainable urban rail management requires directing limited budgets to sections where maintenance can most effectively extend asset life. Existing track performance evaluation systems guide maintenance priorities, but cost-effectiveness-based indices do not explicitly account for structural vulnerability. Using 4737 unit sections (462.1 km across eight urban railway lines), this study identified factors associated with low performance and developed an improved maintenance priority index. The lowest-performing 25% for each index served as the priority management group. Binary and ordinal logistic regression, with 5–30% cutoff sensitivity analyses, assessed associations with cumulative gross tonnage, trackbed type, and alignment condition. For the overall performance index, ballasted track (odds ratio = 2.17) and sharp curves (odds ratio = 2.38) were consistently associated with priority-group membership across cutoff and spatial-dependence checks. Predicted probabilities from the overall-performance model were converted to ratios relative to a baseline and applied to the existing index as structural-vulnerability weights. In the case application, weights reached 4.03 and changed 23 of 27 section rankings. By making structural vulnerability explicit, the index supports more transparent and resource-efficient maintenance prioritization under constrained budgets, longer component service life, and fewer premature renewals. Longitudinal data are required to test whether these rankings predict subsequent deterioration.
- Open Access
- 17 December 2025
- Published by MDPI AG in Administrative Sciences
- Vol. 15 (12) , 497
Challenges and Strategies for Resident Participation Ordinances to Prevent Construction Defects in Korean Local Governments
Many Korean local governments have enacted ordinances that enable resident participation in the supervision of public construction projects, yet an implementation gap persists between the legal framework and actual engagement. This study thus examined causes of and strategies for residents’ participation in defect reporting and the role of resident supervisor using a sequential embedded design. Administrative data from local governments were analyzed, followed by 94 survey data from resident representatives. Awareness about the defect reporting and role of resident supervisor was low, while support and intention for participation were higher. Awareness, perceived ordinance effectiveness, and support for resident participation were associated with intention, whereas financial rewards showed no significant association. These results suggest that insufficient awareness and trust—not lack of motivation—are the primary barriers, indicating the need to shift from offering rewards to targeted communication, procedural transparency, and capacity-building. This study’s contribution is its mixed-methods empirical assessment of this gap, informing the design of resident-participation policies by prioritizing awareness campaigns, procedural transparency, and training for resident supervisors.
- 17 December 2025
- Published by MDPI AG in Administrative Sciences
- Vol. 15 (12) , 497
Open AccessChallenges and Strategies for Resident Participation Ordinances to Prevent Construction Defects in Korean Local Governments
Many Korean local governments have enacted ordinances that enable resident participation in the supervision of public construction projects, yet an implementation gap persists between the legal framework and actual engagement. This study thus examined causes of and strategies for residents’ participation in defect reporting and the role of resident supervisor using a sequential embedded design. Administrative data from local governments were analyzed, followed by 94 survey data from resident representatives. Awareness about the defect reporting and role of resident supervisor was low, while support and intention for participation were higher. Awareness, perceived ordinance effectiveness, and support for resident participation were associated with intention, whereas financial rewards showed no significant association. These results suggest that insufficient awareness and trust—not lack of motivation—are the primary barriers, indicating the need to shift from offering rewards to targeted communication, procedural transparency, and capacity-building. This study’s contribution is its mixed-methods empirical assessment of this gap, informing the design of resident-participation policies by prioritizing awareness campaigns, procedural transparency, and training for resident supervisors.
- Open Access
Development of an Automated Construction Contract Review Framework Using Large Language Model and Domain Knowledge
Construction contract review demands specialized expertise, requiring comprehensive understanding of both technical and legal aspects. While AI advancements offer potential solutions, two problems exist: LLMs lack sufficient domain-specific knowledge to analyze construction contracts; existing RAG approaches do not effectively utilize domain expertise. This study aims to develop an automated contract review system that integrates domain expertise with AI capabilities while ensuring reliable analysis. By transforming expert knowledge into a structured knowledge base aligned with the SCF classification, the proposed structured knowledge-integrated RAG pipeline is expected to enable context-aware contract analysis. This enhanced performance is achieved through three key components: (1) integrating structured domain knowledge with LLMs, (2) implementing filtering combined with hybrid dense–sparse retrieval mechanisms, and (3) employing reference-based answer generation. Validation using Oman’s standard contract conditions demonstrated the system’s effectiveness in assisting construction professionals with contract analysis. Performance evaluation showed significant improvements, achieving a 52.6% improvement in Context Recall and a 48.3% improvement in Faithfulness compared to basic RAG approaches. This study contributes to enhancing the reliability of construction contract review by applying a structured knowledge-integrated RAG pipeline that enables the accurate retrieval of expert knowledge, thereby addressing the industry’s need for precise contract analysis.
Open AccessDevelopment of an Automated Construction Contract Review Framework Using Large Language Model and Domain Knowledge
Construction contract review demands specialized expertise, requiring comprehensive understanding of both technical and legal aspects. While AI advancements offer potential solutions, two problems exist: LLMs lack sufficient domain-specific knowledge to analyze construction contracts; existing RAG approaches do not effectively utilize domain expertise. This study aims to develop an automated contract review system that integrates domain expertise with AI capabilities while ensuring reliable analysis. By transforming expert knowledge into a structured knowledge base aligned with the SCF classification, the proposed structured knowledge-integrated RAG pipeline is expected to enable context-aware contract analysis. This enhanced performance is achieved through three key components: (1) integrating structured domain knowledge with LLMs, (2) implementing filtering combined with hybrid dense–sparse retrieval mechanisms, and (3) employing reference-based answer generation. Validation using Oman’s standard contract conditions demonstrated the system’s effectiveness in assisting construction professionals with contract analysis. Performance evaluation showed significant improvements, achieving a 52.6% improvement in Context Recall and a 48.3% improvement in Faithfulness compared to basic RAG approaches. This study contributes to enhancing the reliability of construction contract review by applying a structured knowledge-integrated RAG pipeline that enables the accurate retrieval of expert knowledge, thereby addressing the industry’s need for precise contract analysis.
- Open Access
Application Issues of Impacted As-Planned Schedule for Delay Analysis
Most construction projects are delayed, and many are subject to claims or disputes. Therefore, delay analysis is a critical component of any construction project to determine who is responsible for delays. This research examines four different techniques for estimating delay impacts using the impacted as-planned (IAP) method. A sample network was introduced as an example to discuss several concerns. The advantages and limitations of each approach were identified, and recommendations were given for each approach. When inserting an activity or activities representing delay events in IAP, it is necessary to use both constraints and logical relations among delay events, their logical predecessors, and successors. Constraints representing the actual date of delay events are the simplest and easiest. However, constraints should not be used in “single insertion” and “inserting only owner- or contractor-caused delay” approach. In addition, in the case of using constraints, it is critical to ensure that the impact of delay events is less than the duration of those delay events. Constraints should be avoided in this scenario, and delay events should be logically connected to their logical predecessors and successors without constraints. This study also identified through an example that inserting delay events only by logic can cause wrong analysis results. The results of this study will be helpful for delay analysts in identifying what kinds of problems occur in IAP methods and how to prevent those problems.
Open AccessApplication Issues of Impacted As-Planned Schedule for Delay Analysis
Most construction projects are delayed, and many are subject to claims or disputes. Therefore, delay analysis is a critical component of any construction project to determine who is responsible for delays. This research examines four different techniques for estimating delay impacts using the impacted as-planned (IAP) method. A sample network was introduced as an example to discuss several concerns. The advantages and limitations of each approach were identified, and recommendations were given for each approach. When inserting an activity or activities representing delay events in IAP, it is necessary to use both constraints and logical relations among delay events, their logical predecessors, and successors. Constraints representing the actual date of delay events are the simplest and easiest. However, constraints should not be used in “single insertion” and “inserting only owner- or contractor-caused delay” approach. In addition, in the case of using constraints, it is critical to ensure that the impact of delay events is less than the duration of those delay events. Constraints should be avoided in this scenario, and delay events should be logically connected to their logical predecessors and successors without constraints. This study also identified through an example that inserting delay events only by logic can cause wrong analysis results. The results of this study will be helpful for delay analysts in identifying what kinds of problems occur in IAP methods and how to prevent those problems.
- Open Access
- 1 August 2017
- Published by Elsevier in KSCE Journal of Civil Engineering
- Vol. 22 (4) , 1040-1051
Environmental Load Estimating Model of NATM Tunnel based on Standard Quantity of Major Works in the Early Design Phase
- 1 August 2017
- Published by Elsevier in KSCE Journal of Civil Engineering
- Vol. 22 (4) , 1040-1051
Open AccessEnvironmental Load Estimating Model of NATM Tunnel based on Standard Quantity of Major Works in the Early Design Phase
- Open Access
- 1 November 2016
- Published by Elsevier in KSCE Journal of Civil Engineering
- Vol. 20 (7) , 2604-2613
Estimating approximate construction duration of CFRD in the planning stage
- 1 November 2016
- Published by Elsevier in KSCE Journal of Civil Engineering
- Vol. 20 (7) , 2604-2613
Open AccessEstimating approximate construction duration of CFRD in the planning stage
- Open Access
- 1 May 2016
- Published by Elsevier in KSCE Journal of Civil Engineering
- Vol. 20 (4) , 1131-1137
Development of an automated As-planned schedule system for efficient scheduling
- 1 May 2016
- Published by Elsevier in KSCE Journal of Civil Engineering
- Vol. 20 (4) , 1131-1137
Open AccessDevelopment of an automated As-planned schedule system for efficient scheduling
- 1 April 2016
- Published by Korean Society of Civil Engineers in Journal of The Korean Society of Civil Engineers
- Vol. 36 (2) , 307-315
Analysis of Environmental Load by Work Classification for NATM Tunnels
Analysis of Environmental Load by Work Classification for NATM Tunnels NATM tunnel;Environmental load;Life cycle assessment;Life cycle inventory; Many countries are trying to reduce a greenhouse gas to step up their fight against climate change. There are many studies related to building only for reducing a greenhouse gas in construction area but studies related to reducing a comprehensive environmental load including various pollutants that affects the global environment are lacking. This study aims to analyse the characteristics of environmental load by work type for tunnel projects. Analysis showed that seven work types, including lining concrete, shotcrete, tunnel portal and open-cut tunnel work, etc., are representative works generated environmental load. These seven works represent 89.22 percent of total environmental load. In addition, comparison results of environmental load per tunnel's length by work type showed that a major factor of environmental load is caused by a tunnel portal and open-cut tunnel work with relatively short length (excavation length). And lining concrete and shotcrete work are larger than any other environmental load with tunnel's total length. It is expected that the result of this study will be used to make a estimation model for environmental load using approximate quantity survey of representative work types in the early stage of tunnel design. And it will be play a considerable role in establishing of environment management plan for sustainable infrastructure construction.
- 1 April 2016
- Published by Korean Society of Civil Engineers in Journal of The Korean Society of Civil Engineers
- Vol. 36 (2) , 307-315
Analysis of Environmental Load by Work Classification for NATM Tunnels
Analysis of Environmental Load by Work Classification for NATM Tunnels NATM tunnel;Environmental load;Life cycle assessment;Life cycle inventory; Many countries are trying to reduce a greenhouse gas to step up their fight against climate change. There are many studies related to building only for reducing a greenhouse gas in construction area but studies related to reducing a comprehensive environmental load including various pollutants that affects the global environment are lacking. This study aims to analyse the characteristics of environmental load by work type for tunnel projects. Analysis showed that seven work types, including lining concrete, shotcrete, tunnel portal and open-cut tunnel work, etc., are representative works generated environmental load. These seven works represent 89.22 percent of total environmental load. In addition, comparison results of environmental load per tunnel's length by work type showed that a major factor of environmental load is caused by a tunnel portal and open-cut tunnel work with relatively short length (excavation length). And lining concrete and shotcrete work are larger than any other environmental load with tunnel's total length. It is expected that the result of this study will be used to make a estimation model for environmental load using approximate quantity survey of representative work types in the early stage of tunnel design. And it will be play a considerable role in establishing of environment management plan for sustainable infrastructure construction.
- Open Access
- 1 September 2014
- Published by Elsevier in KSCE Journal of Civil Engineering
- Vol. 18 (6) , 1625-1631
Schedule compression in tunneling projects by adjusting workflow variability
- 1 September 2014
- Published by Elsevier in KSCE Journal of Civil Engineering
- Vol. 18 (6) , 1625-1631
Open AccessSchedule compression in tunneling projects by adjusting workflow variability
- Open Access
- 1 July 2013
- Published by Elsevier in KSCE Journal of Civil Engineering
- Vol. 17 (5) , 877-885
An approximate cost estimation model based on standard quantities of steel box girder bridge substructure
- 1 July 2013
- Published by Elsevier in KSCE Journal of Civil Engineering
- Vol. 17 (5) , 877-885
Open AccessAn approximate cost estimation model based on standard quantities of steel box girder bridge substructure