Walid Thabet
Research Subjects
Walid Thabet has a total of 18 co-authors. Here are the top co-authors by number of shared publications:
- Jason Lucas
Clemson Univ
5 shared publications - Mahnaz Ensafi
Department of Building Construction, Virginia Tech, Blacksburg, Virginia, USA
4 shared publications - Ashit Harode
Department of Civil, Environmental, and Architectural Engineering, University of Colorado, Boulder, CO 80309, USA
2 shared publications Jason Lucas
2-136 Lee Hall , Nieri Family Department of Construction Science and Management , Clemson University , Clemson , SC , USA
2 shared publications- Tanyel Bulbul
Virginia Polytechnic Institute and State University
2 shared publications - Annie R. Pearce
Virginia Tech
1 shared publication
Latest Publications
- Open Access
- 18 April 2024
- Published by International Council for Research and Innovation in Building and Construction in Journal of Information Technology in Construction
- Vol. 29 (16) , 324-346
Work order prioritization using neural networks to improve building operation
Journal of Information Technology in Construction
- 18 April 2024
- Published by International Council for Research and Innovation in Building and Construction in Journal of Information Technology in Construction
- Vol. 29 (16) , 324-346
Open AccessWork order prioritization using neural networks to improve building operation
Journal of Information Technology in Construction
- 30 January 2024
- Published by Emerald Publishing in Facilities
- Vol. 42 (5/6) , 504-523
Investigation of work order processing in different facilities: a questionnaire-based survey
The aim of this paper was to study current practices in FM work order processing to support and improve decision-making. Processing and prioritizing work orders constitute a critical part of facilities and maintenance management practices given the large amount of work orders submitted daily. User-driven approaches (UDAs) are currently more prevalent for processing and prioritizing work orders but have challenges including inconsistency and subjectivity. Data-driven approaches can provide an advantage over user-driven ones in work-order processing; however, specific data requirements need to be identified to collect and process the functional data needed while achieving more consistent and accurate results. This paper presents the findings of an online survey conducted with facility management (FM) experts who are directly or indirectly involved in processing work orders in building maintenance. The findings reflect the current practices of 71 survey participants on data requirements, criteria selection, rankings, with current shortcomings and challenges in prioritizing work orders. In addition, differences between criteria and their ranking within participants’ experience, facility types and facility sizes are investigated. The findings of the study provide a snapshot of the current practices in FM work order processing, which aids in developing a comprehensive framework to support data-driven decision-making and address the challenges with UDAs. Although previous studies have explored the use of selected criteria for processing and prioritizing work orders, this paper investigated a comprehensive list of criteria used by various facilities for processing work orders. Furthermore, previous studies are focused on the processing and prioritization stage, whereas this paper explored the data collected following the completion of the maintenance tasks and the benefits it can provide for processing future work orders. In addition, previous studies have focused on one specific stage of work order processing, whereas this paper investigated the common data between different stages of work order processing for enhanced FM.
- 30 January 2024
- Published by Emerald Publishing in Facilities
- Vol. 42 (5/6) , 504-523
Investigation of work order processing in different facilities: a questionnaire-based survey
The aim of this paper was to study current practices in FM work order processing to support and improve decision-making. Processing and prioritizing work orders constitute a critical part of facilities and maintenance management practices given the large amount of work orders submitted daily. User-driven approaches (UDAs) are currently more prevalent for processing and prioritizing work orders but have challenges including inconsistency and subjectivity. Data-driven approaches can provide an advantage over user-driven ones in work-order processing; however, specific data requirements need to be identified to collect and process the functional data needed while achieving more consistent and accurate results. This paper presents the findings of an online survey conducted with facility management (FM) experts who are directly or indirectly involved in processing work orders in building maintenance. The findings reflect the current practices of 71 survey participants on data requirements, criteria selection, rankings, with current shortcomings and challenges in prioritizing work orders. In addition, differences between criteria and their ranking within participants’ experience, facility types and facility sizes are investigated. The findings of the study provide a snapshot of the current practices in FM work order processing, which aids in developing a comprehensive framework to support data-driven decision-making and address the challenges with UDAs. Although previous studies have explored the use of selected criteria for processing and prioritizing work orders, this paper investigated a comprehensive list of criteria used by various facilities for processing work orders. Furthermore, previous studies are focused on the processing and prioritization stage, whereas this paper explored the data collected following the completion of the maintenance tasks and the benefits it can provide for processing future work orders. In addition, previous studies have focused on one specific stage of work order processing, whereas this paper investigated the common data between different stages of work order processing for enhanced FM.
- Open Access
- 28 February 2023
- Published by International Council for Research and Innovation in Building and Construction in Journal of Information Technology in Construction
- Vol. 28 (6) , 107-137
A tool-based system architecture for a digital twin: a case study in a healthcare facility
Changes in the local and global markets are forcing A/E/C/FM (Architecture, Engineering, Construction, and Facility Management) organizations to deliver more robust and innovative operational BIMs (Building Information Models). It is hypothesized that BIMs will transform from a static 3D model to a Digital Twin providing a truly digital representation of the physical asset or the building it represents. This transformation to a dynamic Digital Twin will allow the A/E/C/FM industry to visualize, monitor, and optimize operational assets and processes to support better inspection and analysis for a more efficient facility operations and maintenance. To support the adoption and implementation of Digital Twin in A/E/C/FM, the authors have defined two clear objectives. First, we discuss requirements for a functionality-based canonical architecture to create a digital twin followed by proposing two tool-based system architecture options for its implementation. Second, we use a case study approach to develop a proof-of-concept Digital Twin of an operating room in a healthcare facility using Power BI Desktop and Azure Services. The prototype aims to monitor room air quality as per INAIL (National Institute for Insurance against Accidents at Work) and ISO (International Organization for Standards) standards. Multiple sensors connected to a Raspberry Pi 4 are used to capture real-time data for various air quality parameters including temperature, humidity, airflow, particulate contamination, and Nitrous Oxide (N2O) gas. Multiple dashboards are also created to visualize, monitor, and analyze the data harnessed from the OR sensors. The implementation addresses critical issues including security, data storage, visualization, processing, data streaming, collection, and analysis. As an initial validation, the Digital Twin prototype was presented and discussed with a healthcare BIM manager. Initial feedback from the industry expert indicated that the prototype could decrease the required time to respond to facility maintenance issues such as decreased air flow due to possible obstructions.
- 28 February 2023
- Published by International Council for Research and Innovation in Building and Construction in Journal of Information Technology in Construction
- Vol. 28 (6) , 107-137
Open AccessA tool-based system architecture for a digital twin: a case study in a healthcare facility
Changes in the local and global markets are forcing A/E/C/FM (Architecture, Engineering, Construction, and Facility Management) organizations to deliver more robust and innovative operational BIMs (Building Information Models). It is hypothesized that BIMs will transform from a static 3D model to a Digital Twin providing a truly digital representation of the physical asset or the building it represents. This transformation to a dynamic Digital Twin will allow the A/E/C/FM industry to visualize, monitor, and optimize operational assets and processes to support better inspection and analysis for a more efficient facility operations and maintenance. To support the adoption and implementation of Digital Twin in A/E/C/FM, the authors have defined two clear objectives. First, we discuss requirements for a functionality-based canonical architecture to create a digital twin followed by proposing two tool-based system architecture options for its implementation. Second, we use a case study approach to develop a proof-of-concept Digital Twin of an operating room in a healthcare facility using Power BI Desktop and Azure Services. The prototype aims to monitor room air quality as per INAIL (National Institute for Insurance against Accidents at Work) and ISO (International Organization for Standards) standards. Multiple sensors connected to a Raspberry Pi 4 are used to capture real-time data for various air quality parameters including temperature, humidity, airflow, particulate contamination, and Nitrous Oxide (N2O) gas. Multiple dashboards are also created to visualize, monitor, and analyze the data harnessed from the OR sensors. The implementation addresses critical issues including security, data storage, visualization, processing, data streaming, collection, and analysis. As an initial validation, the Digital Twin prototype was presented and discussed with a healthcare BIM manager. Initial feedback from the industry expert indicated that the prototype could decrease the required time to respond to facility maintenance issues such as decreased air flow due to possible obstructions.
- Open Access
Real-Time and Remote Construction Progress Monitoring with a Quadruped Robot Using Augmented Reality
Construction progress monitoring involves a set of inspection tasks with repetitive in-person observations on the site. The current manual inspection process in construction is time-consuming, inefficient and inconsistent mainly due to human limitations in the ability to persistently and accurately walkthrough the job site and observe the as-built status of which robots are considerably better. Enabling the process of visual inspection with a real-time and remote inspection capability using robots can provide more frequent and accessible construction progress data for inspectors to improve the quality of inspection and monitoring. Also, integrating remote inspection with an Augmented Reality (AR) platform can help the inspector to verify as-planned BIM data with the as-built status. This paper proposes a new approach to perform remote monitoring of the construction progress in real-time using a quadruped robot and an AR solution. The proposed computational framework in this study uses a cloud-based solution to integrate the quadruped robot’s control for remote navigation through the construction site with 360° live-stream video of the construction status, as well as a real-time AR solution to visualize and compare the as-built status with as-planned BIM geometry. The implementation of the proposed framework is discussed, and the developed framework is evaluated in two use cases through experimental investigations.
Open AccessReal-Time and Remote Construction Progress Monitoring with a Quadruped Robot Using Augmented Reality
Construction progress monitoring involves a set of inspection tasks with repetitive in-person observations on the site. The current manual inspection process in construction is time-consuming, inefficient and inconsistent mainly due to human limitations in the ability to persistently and accurately walkthrough the job site and observe the as-built status of which robots are considerably better. Enabling the process of visual inspection with a real-time and remote inspection capability using robots can provide more frequent and accessible construction progress data for inspectors to improve the quality of inspection and monitoring. Also, integrating remote inspection with an Augmented Reality (AR) platform can help the inspector to verify as-planned BIM data with the as-built status. This paper proposes a new approach to perform remote monitoring of the construction progress in real-time using a quadruped robot and an AR solution. The proposed computational framework in this study uses a cloud-based solution to integrate the quadruped robot’s control for remote navigation through the construction site with 360° live-stream video of the construction status, as well as a real-time AR solution to visualize and compare the as-built status with as-planned BIM geometry. The implementation of the proposed framework is discussed, and the developed framework is evaluated in two use cases through experimental investigations.
- Open Access
Linking BIM to Power BI and HoloLens 2 to Support Facility Management: A Case Study Approach
Facility lifecycle data captured in BIM during design and construction are very valuable for effective facility operations and maintenance. Traditionally, model authoring and analysis tools have been used to search and query model information. These tools are not well designed to search and display needed data and they require a steep learning curve. In this paper, the authors propose the use of Power BI dashboards to facilitate easy access and display of lifecycle data embedded in the model. The implementation and use of dashboards for facility management are discussed using a case study. The effectiveness and usability of the dashboards are validated using a focus group of six industry experts that were first interviewed then asked to complete a questionnaire. Feedback from interviews indicated that customized dashboards are effective tools to view, analyze and draw insights on data from various sources and can improve facility operations and management. Numerical results from the PSSUQ using fourteen questions indicated positive responses overall with an average score of four or five from the majority of respondents. Finally, the authors tested integration of the Power BI dashboards with the HoloLens 2 to deliver relevant up-to-date facility lifecycle data in near real-time to field staff.
Open AccessLinking BIM to Power BI and HoloLens 2 to Support Facility Management: A Case Study Approach
Facility lifecycle data captured in BIM during design and construction are very valuable for effective facility operations and maintenance. Traditionally, model authoring and analysis tools have been used to search and query model information. These tools are not well designed to search and display needed data and they require a steep learning curve. In this paper, the authors propose the use of Power BI dashboards to facilitate easy access and display of lifecycle data embedded in the model. The implementation and use of dashboards for facility management are discussed using a case study. The effectiveness and usability of the dashboards are validated using a focus group of six industry experts that were first interviewed then asked to complete a questionnaire. Feedback from interviews indicated that customized dashboards are effective tools to view, analyze and draw insights on data from various sources and can improve facility operations and management. Numerical results from the PSSUQ using fourteen questions indicated positive responses overall with an average score of four or five from the majority of respondents. Finally, the authors tested integration of the Power BI dashboards with the HoloLens 2 to deliver relevant up-to-date facility lifecycle data in near real-time to field staff.
- Open Access
- 1 January 2022
- Published by Walter de Gruyter GmbH in Organization, Technology and Management in Construction: an International Journal
- Vol. 14 (1) , 2539-2558
Linking life cycle BIM data to a facility management system using Revit Dynamo
Facility management (FM) requires multidisciplinary activities, and thus has extensive information requirements. Much of that information is created during the design, construction, and commissioning phases of a project. Providing the owner of a facility with usable life cycle asset information after construction has been a challenge to the industry. Traditional methods of manually inputting data into FM systems are time consuming and error prone. Various automated approaches and workflows continue to be developed to respond to specific owner needs. This research developed a unique workflow that uses Dynamo within Revit to automatically extract asset management data from the model and export the data to a proprietary format required by the facility owner. The formatted spreadsheet allows for direct linking of the data to the owner's FM system, hence eliminating time wasted in manual data entry and avoiding missing any maintenance cycles that would result if the FM system is not populated with critical information in a timely manner. This article utilizes a case study approach to demonstrate this novel Dynamo workflow. The required case study asset data identified and captured include asset groups, their properties and attributes, and corresponding metadata. A basic three-dimensional representation of the facility and all its equipment are modeled in Revit and asset data are input to corresponding model elements. This article also describes the complexity of the owner's proprietary information needs and the resulting automated workflow that extracts and exports data from Revit into an Excel format that can directly link into the FM system.
- 1 January 2022
- Published by Walter de Gruyter GmbH in Organization, Technology and Management in Construction: an International Journal
- Vol. 14 (1) , 2539-2558
Open AccessLinking life cycle BIM data to a facility management system using Revit Dynamo
Facility management (FM) requires multidisciplinary activities, and thus has extensive information requirements. Much of that information is created during the design, construction, and commissioning phases of a project. Providing the owner of a facility with usable life cycle asset information after construction has been a challenge to the industry. Traditional methods of manually inputting data into FM systems are time consuming and error prone. Various automated approaches and workflows continue to be developed to respond to specific owner needs. This research developed a unique workflow that uses Dynamo within Revit to automatically extract asset management data from the model and export the data to a proprietary format required by the facility owner. The formatted spreadsheet allows for direct linking of the data to the owner's FM system, hence eliminating time wasted in manual data entry and avoiding missing any maintenance cycles that would result if the FM system is not populated with critical information in a timely manner. This article utilizes a case study approach to demonstrate this novel Dynamo workflow. The required case study asset data identified and captured include asset groups, their properties and attributes, and corresponding metadata. A basic three-dimensional representation of the facility and all its equipment are modeled in Revit and asset data are input to corresponding model elements. This article also describes the complexity of the owner's proprietary information needs and the resulting automated workflow that extracts and exports data from Revit into an Excel format that can directly link into the FM system.
- Open Access
- 1 January 2019
- Published by Periodica Polytechnica Budapest University of Technology and Economics
- p. 914-921
Using Dynamo for Model-Based Delivery of Facility Asset Data
Large facility owners are becoming increasingly aware of the value and advantage of utilizing design and build teams to capture and deliver facility asset data necessary to populate their Computerized Maintenance and Management System (CMMS) for efficient operation and maintenance of their facilities. Facility asset data can be delivered using various formats including a spreadsheetbased or a model-based deliverable. In a spreadsheet-based deliverable, asset data are captured and stored using a spreadsheet specifically formatted to allow the end user direct linking of the spreadsheet to the CMMS and automatic upload of the data. In a model-based deliverable, asset data is captured and loaded into a BIM model then transferred directly or indirectly from the model to the CMMS using various data exchange methods. This paper discusses the indirect linking of facility asset data captured in a Revit BIM model to the facility management system through exporting the data to an external database. Dynamo, an open-source script-programming tool that works within the Revit environment, is used to extract and export the data from Revit to an external SQL database in a specific format and organizational structure that would allow for uploading of the data to the CMMS. Dynamo script (e.g. Python script) was used to export certain data parameters in a specific order and format. Exported asset data parameters and values are saved to the SQL database and linked to the CMMS to support operations and maintenance. The paper uses a case study approach to illustrate the implementation of Dynamo to a renovation project for a large academic institution. Asset data for the project is captured from project plans and submittals and loaded into a Revit BIM model. The Dynamo script is tested to verify the export of data in the required format.
- 1 January 2019
- Published by Periodica Polytechnica Budapest University of Technology and Economics
- p. 914-921
Open AccessUsing Dynamo for Model-Based Delivery of Facility Asset Data
Large facility owners are becoming increasingly aware of the value and advantage of utilizing design and build teams to capture and deliver facility asset data necessary to populate their Computerized Maintenance and Management System (CMMS) for efficient operation and maintenance of their facilities. Facility asset data can be delivered using various formats including a spreadsheetbased or a model-based deliverable. In a spreadsheet-based deliverable, asset data are captured and stored using a spreadsheet specifically formatted to allow the end user direct linking of the spreadsheet to the CMMS and automatic upload of the data. In a model-based deliverable, asset data is captured and loaded into a BIM model then transferred directly or indirectly from the model to the CMMS using various data exchange methods. This paper discusses the indirect linking of facility asset data captured in a Revit BIM model to the facility management system through exporting the data to an external database. Dynamo, an open-source script-programming tool that works within the Revit environment, is used to extract and export the data from Revit to an external SQL database in a specific format and organizational structure that would allow for uploading of the data to the CMMS. Dynamo script (e.g. Python script) was used to export certain data parameters in a specific order and format. Exported asset data parameters and values are saved to the SQL database and linked to the CMMS to support operations and maintenance. The paper uses a case study approach to illustrate the implementation of Dynamo to a renovation project for a large academic institution. Asset data for the project is captured from project plans and submittals and loaded into a Revit BIM model. The Dynamo script is tested to verify the export of data in the required format.
- 29 March 2018
- Published by American Society of Civil Engineers (ASCE)
- p. 439-448
Using a Case-Study Approach to Explore Methods for Transferring BIM-Based Asset Data to Facility Management Systems
This research builds on prior work by the authors and aims at developing best practices to define and transfer asset data captured during design and construction to the owner at handover using various BIM tools and platforms. With the goal of developing BIM standards and guidelines for supporting facility management at a large educational institution, work completed under prior research included a data needs analysis and definition phase to identify the properties and attributes of various tracked assets by the owner in support of facility management activities. A specially formatted spreadsheet was created that identified the various types of data that would need to be included in a spreadsheet-based deliverable option for the data turnover process. This paper addresses a model-based deliverable option and identifies various data transfer workflows to exchange asset data with a facility management system. The research uses a case study to describe various workflows available to transfer the data. The case study project involves a $1.7 million (USD) HVAC, lighting, and exterior window upgrade of a 1953 Occupancy Class Group A laboratory and office building at the educational institution. Data collection and loading into the Revit BIM model is briefly described, as it is not the main focus of this paper. A 3rd party software plugin was used to define parameters in Revit and load asset data collected from as-built project 2D plans and approved submittals. The paper reports on the data transfer workflows identified and analyzed, and summarizes preliminary observations of the challenges and benefits of each and how they support the owner’s information needs. Finally, the paper includes a discussion of how the current study has influenced a refinement of the original data needs analysis from prior research, serving as part of the validation process for the BIM standards and guidelines development.
- 29 March 2018
- Published by American Society of Civil Engineers (ASCE)
- p. 439-448
Using a Case-Study Approach to Explore Methods for Transferring BIM-Based Asset Data to Facility Management Systems
This research builds on prior work by the authors and aims at developing best practices to define and transfer asset data captured during design and construction to the owner at handover using various BIM tools and platforms. With the goal of developing BIM standards and guidelines for supporting facility management at a large educational institution, work completed under prior research included a data needs analysis and definition phase to identify the properties and attributes of various tracked assets by the owner in support of facility management activities. A specially formatted spreadsheet was created that identified the various types of data that would need to be included in a spreadsheet-based deliverable option for the data turnover process. This paper addresses a model-based deliverable option and identifies various data transfer workflows to exchange asset data with a facility management system. The research uses a case study to describe various workflows available to transfer the data. The case study project involves a $1.7 million (USD) HVAC, lighting, and exterior window upgrade of a 1953 Occupancy Class Group A laboratory and office building at the educational institution. Data collection and loading into the Revit BIM model is briefly described, as it is not the main focus of this paper. A 3rd party software plugin was used to define parameters in Revit and load asset data collected from as-built project 2D plans and approved submittals. The paper reports on the data transfer workflows identified and analyzed, and summarizes preliminary observations of the challenges and benefits of each and how they support the owner’s information needs. Finally, the paper includes a discussion of how the current study has influenced a refinement of the original data needs analysis from prior research, serving as part of the validation process for the BIM standards and guidelines development.
- 1 November 2017
- Published by American Society of Civil Engineers (ASCE) in Journal of Construction Engineering and Management
- Vol. 143 (11)
Asset Data Handover for a Large Educational Institution: Case-Study Approach
Owners of multiple facilities who maintain large capital portfolios are challenged with efficient maintenance to streamline operational processes and costs. Clearly defined and structured information documentation standards are needed before a project even starts to develop appropriate as-built documentation to support postconstruction operations. This paper documents a case study of a large educational institution that is exploring methods for adopting a building information model (BIM) for facility management (FM) approach for information management as a way to overcome inefficiencies in its current information processing methods. A multiphase process has been used in the development of a proposed BIM-based solution. This paper presents the data needs analysis that has been conducted with the first phase of the research project. The preliminary data capture and documentation methods are discussed in terms of a spreadsheet-based methodology that allows for easily identifying and tracking sources of information. A pilot study is also discussed that was used to validate the information needs and overall process. Future research steps of converting the spreadsheet-based methodology into a model-based approach allowing the FM department to directly link a BIM to its computerized maintenance and management system (CMMS) are also included. Specific challenges and lessons learned in the information collection process are also discussed in terms of how they have affected the overall process development.
- 1 November 2017
- Published by American Society of Civil Engineers (ASCE) in Journal of Construction Engineering and Management
- Vol. 143 (11)
Asset Data Handover for a Large Educational Institution: Case-Study Approach
Owners of multiple facilities who maintain large capital portfolios are challenged with efficient maintenance to streamline operational processes and costs. Clearly defined and structured information documentation standards are needed before a project even starts to develop appropriate as-built documentation to support postconstruction operations. This paper documents a case study of a large educational institution that is exploring methods for adopting a building information model (BIM) for facility management (FM) approach for information management as a way to overcome inefficiencies in its current information processing methods. A multiphase process has been used in the development of a proposed BIM-based solution. This paper presents the data needs analysis that has been conducted with the first phase of the research project. The preliminary data capture and documentation methods are discussed in terms of a spreadsheet-based methodology that allows for easily identifying and tracking sources of information. A pilot study is also discussed that was used to validate the information needs and overall process. Future research steps of converting the spreadsheet-based methodology into a model-based approach allowing the FM department to directly link a BIM to its computerized maintenance and management system (CMMS) are also included. Specific challenges and lessons learned in the information collection process are also discussed in terms of how they have affected the overall process development.
- 13 June 2017
- Published by American Society of Civil Engineers (ASCE)
- p. 10-17
The Utilization of an Asset Safety Identification Tool (ASIT) to Support Safety during Facilities Management
From 2011-2015, employers in the field of facility management (FM) recorded 144,600 injuries, with 39,950 cases resulting in 31+ days away from work. Case study analysis shows that many incidents were avoidable had the FM worker followed appropriate hazard mitigation steps. In an effort to improve efficiency and productivity in FM, BIM for facility management (BIMFM) has been an area of focus for many researchers and large public and private companies. While most BIMFM research focuses on the use of BIM models for O&M information storage and retrieval, this research presents a mechanism to improve worker safety during the FM phase. Currently, safety information for FM staff is fragmented in multiple repositories, in various formats, and is often uncategorized. Utilizing qualitative data collection methods, safety properties are established to mitigate three common hazard types for FM staff; falls, contact with/struck by, and harmful environments and substances. Utilizing these safety properties, an asset safety identification tool (ASIT) is designed in order to standardize asset specific safety properties. Using this tool, standardized safety properties are loaded into specific assets within a BIM model, mitigating fragmentation and streamlining information retrieval. This paper discusses the development of the safety properties and focuses on how the ASIT is utilized for documenting standard safety protocols in an effort to automate the connection of safety protocol information and assets based on asset parameters.
- 13 June 2017
- Published by American Society of Civil Engineers (ASCE)
- p. 10-17
The Utilization of an Asset Safety Identification Tool (ASIT) to Support Safety during Facilities Management
From 2011-2015, employers in the field of facility management (FM) recorded 144,600 injuries, with 39,950 cases resulting in 31+ days away from work. Case study analysis shows that many incidents were avoidable had the FM worker followed appropriate hazard mitigation steps. In an effort to improve efficiency and productivity in FM, BIM for facility management (BIMFM) has been an area of focus for many researchers and large public and private companies. While most BIMFM research focuses on the use of BIM models for O&M information storage and retrieval, this research presents a mechanism to improve worker safety during the FM phase. Currently, safety information for FM staff is fragmented in multiple repositories, in various formats, and is often uncategorized. Utilizing qualitative data collection methods, safety properties are established to mitigate three common hazard types for FM staff; falls, contact with/struck by, and harmful environments and substances. Utilizing these safety properties, an asset safety identification tool (ASIT) is designed in order to standardize asset specific safety properties. Using this tool, standardized safety properties are loaded into specific assets within a BIM model, mitigating fragmentation and streamlining information retrieval. This paper discusses the development of the safety properties and focuses on how the ASIT is utilized for documenting standard safety protocols in an effort to automate the connection of safety protocol information and assets based on asset parameters.