Sangyoub Lee
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Research Subjects
Sangyoub Lee has a total of 22 co-authors. Here are the top co-authors by number of shared publications:
Seung-Hyun Chung
Brown and Caldwell, Irvine, USA
2 shared publicationsSeung-Woo Han
Dept. of Architectural Engineering, Inha University, Korea
2 shared publicationsTae-Hoon Hong
Construction Engineering & Management Research Department, Korea Institute of Construction Te chnology, Korea
2 shared publications- Boseon Jung1 shared publication
- Chaewan Kim1 shared publication
Chanjeong Park
GS Engineering and Construction Corporation, Seoul, Korea
1 shared publication
Latest Publications
- 18 June 2026
- Published by Springer Nature
- p. 2575-2589
Importance of Commercial Data Center Site Selection Factors: Applying the Analytic Hierarchy Process
- 18 June 2026
- Published by Springer Nature
- p. 2575-2589
Importance of Commercial Data Center Site Selection Factors: Applying the Analytic Hierarchy Process
- Open Access
- 31 December 2025
- Published by Housing Finance Research Institute, Korea Housing Finance Corporation in Housing Finance Research
- Vol. 9 (2) , 47-68
Factors Affecting Defaults on Jeonse Deposit Guarantees: Focusing on the Seoul Metropolitan Area*
주택금융연구는 한국주택금융공사의 공식학술지로서 주택금융시장, 주택금융정책, 주택금융상품, 주택금융정보기술 등 주택금융과 관련된 학문분야에서 이론적, 실증적, 정책적인 가치를 지니는 전문적이고 창의적인 연구논문들을 게재함으로써, 연구발표의 장과 학문토론의 기회를 제공하고 아울러 주택금융지식의 축적과 교육에도 기여함을 목적으로 합니다.
- 31 December 2025
- Published by Housing Finance Research Institute, Korea Housing Finance Corporation in Housing Finance Research
- Vol. 9 (2) , 47-68
Open AccessFactors Affecting Defaults on Jeonse Deposit Guarantees: Focusing on the Seoul Metropolitan Area*
주택금융연구는 한국주택금융공사의 공식학술지로서 주택금융시장, 주택금융정책, 주택금융상품, 주택금융정보기술 등 주택금융과 관련된 학문분야에서 이론적, 실증적, 정책적인 가치를 지니는 전문적이고 창의적인 연구논문들을 게재함으로써, 연구발표의 장과 학문토론의 기회를 제공하고 아울러 주택금융지식의 축적과 교육에도 기여함을 목적으로 합니다.
- Open Access
- 31 July 2025
- Published by Korea Appraisal Board in Journal of Real Estate Analysis
- Vol. 11 (2) , 41-61
The Impact of Parental Homeownership on Children’s Housing Stability and Childbirth Decisions
부동산분석(Journal of Real Estate Analysis)
- 31 July 2025
- Published by Korea Appraisal Board in Journal of Real Estate Analysis
- Vol. 11 (2) , 41-61
Open AccessThe Impact of Parental Homeownership on Children’s Housing Stability and Childbirth Decisions
부동산분석(Journal of Real Estate Analysis)
- Open Access
- 30 April 2023
- Published by Korea Appraisal Board in Journal of Real Estate Analysis
- Vol. 9 (1) , 271-288
A Study on Litigation Factors in Reconstruction and Redevelopment Project
부동산분석(Journal of Real Estate Analysis)
- 30 April 2023
- Published by Korea Appraisal Board in Journal of Real Estate Analysis
- Vol. 9 (1) , 271-288
Open AccessA Study on Litigation Factors in Reconstruction and Redevelopment Project
부동산분석(Journal of Real Estate Analysis)
- Open Access
- 31 December 2019
- Published by Korea Housing and Urban Guarantee Corporation in Journal of Housing and Urban Finance
- Vol. 4 (2) , 179-202
Jurimetrics Analysis on the Winning Determinants of the Lawsuit Cases on the Urban Regeneration Project : Based on Artificial Neural Networks and Decision Tree Analysis*
주택도시금융연구(Journal of Housing and Urban Finance)
- 31 December 2019
- Published by Korea Housing and Urban Guarantee Corporation in Journal of Housing and Urban Finance
- Vol. 4 (2) , 179-202
Open AccessJurimetrics Analysis on the Winning Determinants of the Lawsuit Cases on the Urban Regeneration Project : Based on Artificial Neural Networks and Decision Tree Analysis*
주택도시금융연구(Journal of Housing and Urban Finance)
- Open Access
- 31 December 2019
- Published by Korea Housing and Urban Guarantee Corporation in Journal of Housing and Urban Finance
- Vol. 4 (2) , 109-133
공유오피스 선택을 위한 결정요인에 대한 분석 : 지역, 업태, 산업의 수요자 특성에 따른*
주택도시금융연구(Journal of Housing and Urban Finance)
- 31 December 2019
- Published by Korea Housing and Urban Guarantee Corporation in Journal of Housing and Urban Finance
- Vol. 4 (2) , 109-133
Open Access공유오피스 선택을 위한 결정요인에 대한 분석 : 지역, 업태, 산업의 수요자 특성에 따른*
주택도시금융연구(Journal of Housing and Urban Finance)
- Open Access
- 1 March 2013
- Published by Elsevier in KSCE Journal of Civil Engineering
- Vol. 17 (2) , 281-291
A mixed (continuous + discrete) time-cost trade-off model considering four different relationships with lag time
- 1 March 2013
- Published by Elsevier in KSCE Journal of Civil Engineering
- Vol. 17 (2) , 281-291
Open AccessA mixed (continuous + discrete) time-cost trade-off model considering four different relationships with lag time
- 1 March 2008
- Published by Canadian Science Publishing in Canadian Journal of Civil Engineering
- Vol. 35 (3) , 225-235
Integrated cost and schedule control in the Korean construction industry based on a modified work-packaging model
As a project control technique concept that provides a quantitative measure of schedule and cost information, the earned value (EV) model can evaluate work progress by identifying the potential delay and the cost overruns in a project, which is useful for controlling projects. The construction industry in Korea does not put this concept into practice, however, because it is poorly understood and because the construction practices in Korea are different from those in other industrialized countries. Most important is the fact that almost all the construction projects in Korea are controlled in accordance with the budget breakdown structure (BBS), which is less detailed than the cost breakdown structure (CBS), while those in the USA are managed through schedule control on the basis of the work breakdown structure (WBS). This is because most of the construction projects in Korea are generally contracted at a fixed price. This being the case, once the contract is awarded, the clients are no longer concerned with the cost of the project. This current construction practice based on the BBS rather than on the WBS has brought forth a limitation in terms of the use of the existing EV model in the domestic market. In this study, the EV model, which is suitable for the domestic market, is demonstrated. An integrated model of the WBS and CBS is then developed based on the modified work-packaging model. Finally, the developed model is integrated into the project management system (PMS) to verify its suitability and efficiency.
- 1 March 2008
- Published by Canadian Science Publishing in Canadian Journal of Civil Engineering
- Vol. 35 (3) , 225-235
Integrated cost and schedule control in the Korean construction industry based on a modified work-packaging model
As a project control technique concept that provides a quantitative measure of schedule and cost information, the earned value (EV) model can evaluate work progress by identifying the potential delay and the cost overruns in a project, which is useful for controlling projects. The construction industry in Korea does not put this concept into practice, however, because it is poorly understood and because the construction practices in Korea are different from those in other industrialized countries. Most important is the fact that almost all the construction projects in Korea are controlled in accordance with the budget breakdown structure (BBS), which is less detailed than the cost breakdown structure (CBS), while those in the USA are managed through schedule control on the basis of the work breakdown structure (WBS). This is because most of the construction projects in Korea are generally contracted at a fixed price. This being the case, once the contract is awarded, the clients are no longer concerned with the cost of the project. This current construction practice based on the BBS rather than on the WBS has brought forth a limitation in terms of the use of the existing EV model in the domestic market. In this study, the EV model, which is suitable for the domestic market, is demonstrated. An integrated model of the WBS and CBS is then developed based on the modified work-packaging model. Finally, the developed model is integrated into the project management system (PMS) to verify its suitability and efficiency.
- Open Access
- 1 July 2006
- Published by Elsevier in KSCE Journal of Civil Engineering
- Vol. 10 (4) , 243-253
Life cycle cost analysis based optimal maintenance and rehabilitation for underground infrastructure management
- 1 July 2006
- Published by Elsevier in KSCE Journal of Civil Engineering
- Vol. 10 (4) , 243-253
Open AccessLife cycle cost analysis based optimal maintenance and rehabilitation for underground infrastructure management