David Grau
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
David Grau has a total of 13 co-authors. Here are the top co-authors by number of shared publications:
- Andrew J. Graettinger
Ph.D. Candidate, Department of Civil, Construction and Environmental Engineering, University of Alabama, Box 870205, Tuscaloosa, AL 35487-0205, United States
2 shared publications - David O. Prevatt
Univ. of Florida
2 shared publications - J. Regan Prince
Assistant Professor, Dept. of Civil, Construction, and Environmental Engineering, Univ. of Alabama, Box 870205, Tuscaloosa, AL 35487-0205
2 shared publications W. Edward Back
Associate Professor, Dept. of Civil, Construction, and Environmental Engineering, The Univ. of Alabama, Box 870205, Tuscaloosa, AL 35487-0205
2 shared publicationsEdward W. Back
Assistant Professor, The University of Alabama, Department of Civil, Construction, and Environmental Engineering, Box 870205, Tuscaloosa, AL 35487-0205, United States
1 shared publication- Guillermo Mejia-Aguilar
Assistant Professor, Dept. of Civil, Construction, and Environmental Engineering, The Univ. of Alabama, Box 870205, Tuscaloosa, AL 35487-0205
1 shared publication
Latest Publications
- 11 October 2012
- Published by American Society of Civil Engineers (ASCE)
Joplin, Missouri, Tornado of May 22, 2011
- 11 October 2012
- Published by American Society of Civil Engineers (ASCE)
Joplin, Missouri, Tornado of May 22, 2011
- 1 July 2012
- Published by American Society of Civil Engineers (ASCE) in Journal of Management in Engineering
- Vol. 28 (3) , 232-242
Benefits of On-Site Design to Project Performance Measures
The timely and effective transfer of knowledge and information among project disciplines is of paramount importance for project success. As such, strategies aiming at the incorporation of construction expertise in the design process can significantly improve the likelihood of successful project endeavors. To date, however, the impact of on-site design—the translocation of design activities to the project site—on project performance is not yet understood. This research has identified 29 project performance measures and 50 design activities across project phases to assess the influence of on-site design on project performance. On the basis of statistical analysis of 115 capital projects data representative of $9.2 billion in total installed costs, this study reveals that projects with intensive on-site design strategies not only surpass projects with moderate or null on-site design strategies for a majority of the project performance measures but also exhibit similar levels of accomplishment for the rest of the measures. To complement these results, this study also characterizes and details the utilization of on-site design.
- 1 July 2012
- Published by American Society of Civil Engineers (ASCE) in Journal of Management in Engineering
- Vol. 28 (3) , 232-242
Benefits of On-Site Design to Project Performance Measures
The timely and effective transfer of knowledge and information among project disciplines is of paramount importance for project success. As such, strategies aiming at the incorporation of construction expertise in the design process can significantly improve the likelihood of successful project endeavors. To date, however, the impact of on-site design—the translocation of design activities to the project site—on project performance is not yet understood. This research has identified 29 project performance measures and 50 design activities across project phases to assess the influence of on-site design on project performance. On the basis of statistical analysis of 115 capital projects data representative of $9.2 billion in total installed costs, this study reveals that projects with intensive on-site design strategies not only surpass projects with moderate or null on-site design strategies for a majority of the project performance measures but also exhibit similar levels of accomplishment for the rest of the measures. To complement these results, this study also characterizes and details the utilization of on-site design.
- 17 May 2012
- Published by American Society of Civil Engineers (ASCE)
- p. 2170-2179
GIS for the Geo-Referenced Analysis and Rapid Dissemination of Forensic Evidence Collected in the Aftermath of the Tuscaloosa Tornado
This study investigates the utilization of Geographic Information System (GIS) technology to rapidly disseminate damage and failure mode data related to wood-frame construction collected in the aftermath of the Tuscaloosa tornado on April 27, 2011. The City of Tuscaloosa was in the direct path of a major super cell tornado that bisected the city in a south-west to north-east direction with a half mile wide destruction path. Immediately after the tornado, forensic data collection activities were conducted. Forensic evidence was collected through both active and passive modes. Active data collection occurred at specific case study sites and along transects that ran approximately perpendicular to the direction of the tornado path. Passive data collection modes captured forensic evidence as researchers moved throughout the affected area. Tracking both the time and the location of field activities set the basis for the fusion of the collected data. Thus, by using the time of data collection, forensic data was correlated to a geo-location in full-day GPS track logs and uploaded in a GIS web portal. The web portal enabled 1) the geo-referenced analyses of the collected data, and 2) the rapid dissemination of the forensic evidence to the scientific community and to anyone with an internet connection.
- 17 May 2012
- Published by American Society of Civil Engineers (ASCE)
- p. 2170-2179
GIS for the Geo-Referenced Analysis and Rapid Dissemination of Forensic Evidence Collected in the Aftermath of the Tuscaloosa Tornado
This study investigates the utilization of Geographic Information System (GIS) technology to rapidly disseminate damage and failure mode data related to wood-frame construction collected in the aftermath of the Tuscaloosa tornado on April 27, 2011. The City of Tuscaloosa was in the direct path of a major super cell tornado that bisected the city in a south-west to north-east direction with a half mile wide destruction path. Immediately after the tornado, forensic data collection activities were conducted. Forensic evidence was collected through both active and passive modes. Active data collection occurred at specific case study sites and along transects that ran approximately perpendicular to the direction of the tornado path. Passive data collection modes captured forensic evidence as researchers moved throughout the affected area. Tracking both the time and the location of field activities set the basis for the fusion of the collected data. Thus, by using the time of data collection, forensic data was correlated to a geo-location in full-day GPS track logs and uploaded in a GIS web portal. The web portal enabled 1) the geo-referenced analyses of the collected data, and 2) the rapid dissemination of the forensic evidence to the scientific community and to anyone with an internet connection.
- 17 May 2012
- Published by American Society of Civil Engineers (ASCE)
- p. 121-128
Equipment Technology Innovation for Extreme-Batter Pile Driving Operations
The improvement of pile driving productivity has been, for the most part, consistently neglected in the literature. In particular, the investigation of equipment technology improvements for pile driving activities has yet to be addressed. This study reports the process, benefits, limitations, and lessons learned associated with the definition, development, and implementation of an innovative extreme-batter (23.3° from the vertical) pile driving technology for the construction of a levee. The project team, in a collaborative effort, investigated alternatives to traditional extreme-batter techniques in order to minimize equipment and craft labor needs to complete the levee, and also to minimize the risk of safety occurrences. After holding brainstorming and technical feasibility analysis sessions, the project team decided to adopt an innovative fixed lead approach, the design and production of which was subcontracted out to a pile equipment specialist. Also, instead of subcontracting the piling activity, the team decided to self-perform it in order to have a tighter control on the levee construction process. The fixed lead technique resulted in a 40% cost reduction per unit length of driven pile when compared to traditional extreme-batter piling techniques. This paper also discusses the shortcomings associated the fixed lead pile driving technique.
- 17 May 2012
- Published by American Society of Civil Engineers (ASCE)
- p. 121-128
Equipment Technology Innovation for Extreme-Batter Pile Driving Operations
The improvement of pile driving productivity has been, for the most part, consistently neglected in the literature. In particular, the investigation of equipment technology improvements for pile driving activities has yet to be addressed. This study reports the process, benefits, limitations, and lessons learned associated with the definition, development, and implementation of an innovative extreme-batter (23.3° from the vertical) pile driving technology for the construction of a levee. The project team, in a collaborative effort, investigated alternatives to traditional extreme-batter techniques in order to minimize equipment and craft labor needs to complete the levee, and also to minimize the risk of safety occurrences. After holding brainstorming and technical feasibility analysis sessions, the project team decided to adopt an innovative fixed lead approach, the design and production of which was subcontracted out to a pile equipment specialist. Also, instead of subcontracting the piling activity, the team decided to self-perform it in order to have a tighter control on the levee construction process. The fixed lead technique resulted in a 40% cost reduction per unit length of driven pile when compared to traditional extreme-batter piling techniques. This paper also discusses the shortcomings associated the fixed lead pile driving technique.
- 1 January 2012
- Published by American Society of Civil Engineers (ASCE) in Journal of Computing in Civil Engineering
- Vol. 26 (1) , 64-75
Database Expert Planning System for On-Site Design Strategies
The successful delivery of capital facility projects demands the existence of effective channels of communication among project participants. Thus, clear unambiguous communication of information is an indispensable condition to successfully complete capital projects. As ever-increasing project performance requirements become more difficult to achieve in globally competitive business scenarios, some project teams seek to gain a competing advantage by employing the management strategy of relocating design activities to the site. This paper summarizes research addressing the question of what, when, and how much on-site design is appropriate to favorably influence project performance. On the basis of the analysis of data representative of 115 capital facility projects with $9 billion in total installed costs, a database expert planning system was investigated to reliably compute the specific design activities that, when on-site executed, increase the chances for project success. The expert system also estimat...
- 1 January 2012
- Published by American Society of Civil Engineers (ASCE) in Journal of Computing in Civil Engineering
- Vol. 26 (1) , 64-75
Database Expert Planning System for On-Site Design Strategies
The successful delivery of capital facility projects demands the existence of effective channels of communication among project participants. Thus, clear unambiguous communication of information is an indispensable condition to successfully complete capital projects. As ever-increasing project performance requirements become more difficult to achieve in globally competitive business scenarios, some project teams seek to gain a competing advantage by employing the management strategy of relocating design activities to the site. This paper summarizes research addressing the question of what, when, and how much on-site design is appropriate to favorably influence project performance. On the basis of the analysis of data representative of 115 capital facility projects with $9 billion in total installed costs, a database expert planning system was investigated to reliably compute the specific design activities that, when on-site executed, increase the chances for project success. The expert system also estimat...
- 1 January 2012
- Published by American Society of Civil Engineers (ASCE) in Journal of Computing in Civil Engineering
- Vol. 26 (1) , 141-150
Epistemic Model to Monitor the Position of Mobile Sensing Nodes on Construction Sites with Rough Location Data
Construction organizations are rapidly engaging in the utilization of infrastructureless identification and localization technologies with the purpose of increasing the visibility of their site resources and, more specifically, of their nonbulk materials. With such infrastructureless technologies, a wireless identification device attached to a nonbulk material becomes a mobile sensing node. Even though relatively inexpensive, infrastructureless technologies result in rough node locations that prevent a reliable assessment of the actual node positions. Thus, an opportunity to characterize multiple handling of materials and, by extension, materials handling processes is being missed. However, efficiently monitoring the position of mobile sensing nodes—the coordinates of which remain unknown—with low-accuracy locations is a nontrivial problem that cannot be likely solved using deterministic or classic probability approaches. This study presents an epistemic model based on belief functions that can feasibly monitor the positions of mobile sensing nodes. The feasibility of the model is compared to empirical evidence. The results demonstrate that epistemic functions can, to a large extent, correctly filter location uncertainties and monitor the movements of mobile sensing nodes.
- 1 January 2012
- Published by American Society of Civil Engineers (ASCE) in Journal of Computing in Civil Engineering
- Vol. 26 (1) , 141-150
Epistemic Model to Monitor the Position of Mobile Sensing Nodes on Construction Sites with Rough Location Data
Construction organizations are rapidly engaging in the utilization of infrastructureless identification and localization technologies with the purpose of increasing the visibility of their site resources and, more specifically, of their nonbulk materials. With such infrastructureless technologies, a wireless identification device attached to a nonbulk material becomes a mobile sensing node. Even though relatively inexpensive, infrastructureless technologies result in rough node locations that prevent a reliable assessment of the actual node positions. Thus, an opportunity to characterize multiple handling of materials and, by extension, materials handling processes is being missed. However, efficiently monitoring the position of mobile sensing nodes—the coordinates of which remain unknown—with low-accuracy locations is a nontrivial problem that cannot be likely solved using deterministic or classic probability approaches. This study presents an epistemic model based on belief functions that can feasibly monitor the positions of mobile sensing nodes. The feasibility of the model is compared to empirical evidence. The results demonstrate that epistemic functions can, to a large extent, correctly filter location uncertainties and monitor the movements of mobile sensing nodes.
- 1 January 2012
- Published by American Society of Civil Engineers (ASCE) in Journal of Professional Issues in Engineering Education and Practice
- Vol. 138 (1) , 73-85
Impact of a Construction Management Educational Intervention on the Expertise and Work Practice of Nonconstruction Engineers
This study investigated the influence of a construction management educational intervention on the expertise and work practice of nonconstruction engineers affiliated with a premiere U.S. engineering procurement and contractor (EPC) firm. In this experimental study, nonconstruction engineers with a supervisory role in the delivery of capital projects were instructed in three fundamental construction management subjects, i.e. front-end planning, contracts and project execution, and project completion and team dynamics. These subjects were independently instructed in a traditional classroom-style setting. To capture the sustained impact of the educational intervention, a self-assessment survey tool was designed and distributed to the instructed engineers 4 months after the intervention. The educational intervention resulted in a significant gain in construction expertise among the engineers. The intervention also induced positive changes in the work practice of the instructed engineers and of their organization, such as the development of solid intercommunication skills across engineering disciplines. Overall, the results of this study indicate a significant opportunity for transferring construction management principles and techniques to the engineers in the U.S. construction workforce.
- 1 January 2012
- Published by American Society of Civil Engineers (ASCE) in Journal of Professional Issues in Engineering Education and Practice
- Vol. 138 (1) , 73-85
Impact of a Construction Management Educational Intervention on the Expertise and Work Practice of Nonconstruction Engineers
This study investigated the influence of a construction management educational intervention on the expertise and work practice of nonconstruction engineers affiliated with a premiere U.S. engineering procurement and contractor (EPC) firm. In this experimental study, nonconstruction engineers with a supervisory role in the delivery of capital projects were instructed in three fundamental construction management subjects, i.e. front-end planning, contracts and project execution, and project completion and team dynamics. These subjects were independently instructed in a traditional classroom-style setting. To capture the sustained impact of the educational intervention, a self-assessment survey tool was designed and distributed to the instructed engineers 4 months after the intervention. The educational intervention resulted in a significant gain in construction expertise among the engineers. The intervention also induced positive changes in the work practice of the instructed engineers and of their organization, such as the development of solid intercommunication skills across engineering disciplines. Overall, the results of this study indicate a significant opportunity for transferring construction management principles and techniques to the engineers in the U.S. construction workforce.