Kamel S. Saidi
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Previous Organizations / Institutes
The organizations / institutes from the scholar's other articles in the past ten years
Research Subjects
Kamel S. Saidi has a total of 21 co-authors. Here are the top co-authors by number of shared publications:
- Marek Franaszek
National Institute of Standards and Technology, Gaithersburg, MD 20899, USA
4 shared publications - Geraldine S. Cheok
National Institute of Standards and Technology
3 shared publications - Alan M. Lytle
National Institute of Standards and Technology
2 shared publications - Robert Lipman
National Institute of Standards and Technology, Gaithersburg, MD 20899, USA
2 shared publications - Vineet R. Kamat
Univ. of Michigan
2 shared publications Behshad Ghadimi
Assistant Professor, Vecellio Construction Eng. and Mgmt., Via Dept. of Civil and Env. Eng., and Myers-Lawson School of Construction, Virginia Tech, Blacksburg, VA
1 shared publication
Latest Publications
- Open Access
- 23 January 2024
- Published by MDPI AG in Applied Sciences
- Vol. 14 (3) , 961
Filtering Organized 3D Point Clouds for Bin Picking Applications
In robotic bin-picking applications, autonomous robot action is guided by a perception system integrated with the robot. Unfortunately, many perception systems output data contaminated by spurious points that have no correspondence to the real physical objects. Such spurious points in 3D data are the outliers that may spoil obstacle avoidance planning executed by the robot controller and impede the segmentation of individual parts in the bin. Thus, they need to be removed. Many outlier removal procedures have been proposed that work very well on unorganized 3D point clouds acquired for different, mostly outdoor, scenarios, but these usually do not transfer well to the manufacturing domain. This paper presents a new filtering technique specifically designed to deal with the organized 3D point cloud acquired from a cluttered scene, which is typical for a bin-picking task. The new procedure was tested on six different datasets (bins filled with different parts) and its performance was compared with the generic statistical outlier removal procedure. The new method outperforms the general procedure in terms of filtering efficacy, especially on datasets heavily contaminated by numerous outliers.
- 23 January 2024
- Published by MDPI AG in Applied Sciences
- Vol. 14 (3) , 961
Open AccessFiltering Organized 3D Point Clouds for Bin Picking Applications
In robotic bin-picking applications, autonomous robot action is guided by a perception system integrated with the robot. Unfortunately, many perception systems output data contaminated by spurious points that have no correspondence to the real physical objects. Such spurious points in 3D data are the outliers that may spoil obstacle avoidance planning executed by the robot controller and impede the segmentation of individual parts in the bin. Thus, they need to be removed. Many outlier removal procedures have been proposed that work very well on unorganized 3D point clouds acquired for different, mostly outdoor, scenarios, but these usually do not transfer well to the manufacturing domain. This paper presents a new filtering technique specifically designed to deal with the organized 3D point cloud acquired from a cluttered scene, which is typical for a bin-picking task. The new procedure was tested on six different datasets (bins filled with different parts) and its performance was compared with the generic statistical outlier removal procedure. The new method outperforms the general procedure in terms of filtering efficacy, especially on datasets heavily contaminated by numerous outliers.
- 22 January 2016
- Published by Springer Nature in Journal of Intelligent & Robotic Systems
- Vol. 83 (1) , 85-103
Performance Evaluation of Human Detection Systems for Robot Safety
- 22 January 2016
- Published by Springer Nature in Journal of Intelligent & Robotic Systems
- Vol. 83 (1) , 85-103
Performance Evaluation of Human Detection Systems for Robot Safety
- 21 June 2013
- Published by Springer Nature in Engineering with Computers
- Vol. 31 (1) , 29-49
Feasibility of real-time graphical simulation for active monitoring of visibility-constrained construction processes
- 21 June 2013
- Published by Springer Nature in Engineering with Computers
- Vol. 31 (1) , 29-49
Feasibility of real-time graphical simulation for active monitoring of visibility-constrained construction processes
- 17 May 2012
- Published by American Society of Civil Engineers (ASCE)
- p. 960-970
Image-Based 3D Mapping of Rebar Location for Automated Assessment of Safe Drilling Areas Prior to Placing Embedments in Concrete Bridge Decks
This paper presents a new image-based approach for 3D mapping the locations of the rebar and embedded components in a railway bridge deck prior to placement of concrete. Our approach enables practitioners to quickly and automatically identify where the rebar and other underlying components are within the bridge decks, locate safe and unsafe drilling area, and create a valuable documentation for future retrofit or rehabilitation of the concrete bridge decks. In the proposed method, digital images collected along the rebar cage prior to placement of concrete are processed to automatically generate a 3D point cloud. Using a set of control points, the reconstructed point cloud is transformed into the site coordinate system. Next, a pattern recognition algorithm identifies the rebar locations. A cellbased map of the underlying structure is generated and the occupancies of the cells are automatically detected and visualized using color. Impact of the number of images and control points on the accuracy and density of the image-based 3D reconstruction, registration, and automated recognition of the rebar locations and safe/unsafe cells are studied in detail. Results of our experiments show the promise of applying this low-cost approach in practice.
- 17 May 2012
- Published by American Society of Civil Engineers (ASCE)
- p. 960-970
Image-Based 3D Mapping of Rebar Location for Automated Assessment of Safe Drilling Areas Prior to Placing Embedments in Concrete Bridge Decks
This paper presents a new image-based approach for 3D mapping the locations of the rebar and embedded components in a railway bridge deck prior to placement of concrete. Our approach enables practitioners to quickly and automatically identify where the rebar and other underlying components are within the bridge decks, locate safe and unsafe drilling area, and create a valuable documentation for future retrofit or rehabilitation of the concrete bridge decks. In the proposed method, digital images collected along the rebar cage prior to placement of concrete are processed to automatically generate a 3D point cloud. Using a set of control points, the reconstructed point cloud is transformed into the site coordinate system. Next, a pattern recognition algorithm identifies the rebar locations. A cellbased map of the underlying structure is generated and the occupancies of the cells are automatically detected and visualized using color. Impact of the number of images and control points on the accuracy and density of the image-based 3D reconstruction, registration, and automated recognition of the rebar locations and safe/unsafe cells are studied in detail. Results of our experiments show the promise of applying this low-cost approach in practice.
- 17 May 2012
- Published by American Society of Civil Engineers (ASCE)
- p. 1145-1154
Augmenting BIM with 3D Imaging Data to Control Drilling for Embeds into Reinforced Concrete Bridge Decks
Placing embeds into reinforced concrete structures, after concrete is poured, without damaging reinforcement bars (rebar) is an industry-wide challenge encountered across the construction industry. In concrete structures such as containment vessels, bridge decks and post-tensioned concrete floors damaging rebar may compromise structural integrity and result in considerable rework. Although negative impressions for embeds can be made by placing various objects such as wooden dowels or steel rods into the rebar cage prior to pouring the concrete (and removing them once the concrete has partially or fully set), this practice is labor intensive and time consuming. A method of mapping the locations of the rebar free spaces before pouring and controlling the drilling process in real-time could have significant benefits. This paper presents research that investigated and implemented conceptual solutions for processing and incorporating point cloud data obtained from various 3D-imaging technologies into the drilling process. The 3D imaging technologies were used to map the locations of rebar within a replica of a section of a railway bridge deck. Once the point clouds were processed, zones that are safe for drilling are automatically detected and saved as a Building Information Model (BIM) that is then used to provide real-time feedback to the drill operator about whether it is safe to continue drilling based on the position and orientation of the drill. A conceptual method for providing visual feedback about the rebar-free zones to the drill operator using a laser projector was also developed. Finally, a visualization method for comparing the data obtained from the various 3D imaging technologies using the BIM is discussed.
- 17 May 2012
- Published by American Society of Civil Engineers (ASCE)
- p. 1145-1154
Augmenting BIM with 3D Imaging Data to Control Drilling for Embeds into Reinforced Concrete Bridge Decks
Placing embeds into reinforced concrete structures, after concrete is poured, without damaging reinforcement bars (rebar) is an industry-wide challenge encountered across the construction industry. In concrete structures such as containment vessels, bridge decks and post-tensioned concrete floors damaging rebar may compromise structural integrity and result in considerable rework. Although negative impressions for embeds can be made by placing various objects such as wooden dowels or steel rods into the rebar cage prior to pouring the concrete (and removing them once the concrete has partially or fully set), this practice is labor intensive and time consuming. A method of mapping the locations of the rebar free spaces before pouring and controlling the drilling process in real-time could have significant benefits. This paper presents research that investigated and implemented conceptual solutions for processing and incorporating point cloud data obtained from various 3D-imaging technologies into the drilling process. The 3D imaging technologies were used to map the locations of rebar within a replica of a section of a railway bridge deck. Once the point clouds were processed, zones that are safe for drilling are automatically detected and saved as a Building Information Model (BIM) that is then used to provide real-time feedback to the drill operator about whether it is safe to continue drilling based on the position and orientation of the drill. A conceptual method for providing visual feedback about the rebar-free zones to the drill operator using a laser projector was also developed. Finally, a visualization method for comparing the data obtained from the various 3D imaging technologies using the BIM is discussed.
- 17 May 2012
- Published by American Society of Civil Engineers (ASCE)
- p. 1052-1062
A Case Study of 3D Imaging Productivity Needs to Support Infrastructure Construction
The national infrastructure system is at a crossroads with a need for renewal and expansion in the most efficient manner possible. Light railway construction requires the installation of embedments in reinforced concrete pavement along the length of elevated sections of the railway system. Conventionally, wooden dowels are manually placed into the reinforcing steel mat before concrete placement to form the slot for the embedments; however this is labor intensive and can yield inconsistent spacing. An alternative method is digitally mapping the locations of the reinforcing steel-free space prior to concrete placement to identify where holes could be drilled without hitting the steel reinforcement. The challenge is avoiding impacting production. Using field-based data, this study identifies the number of hours to create the map without impacting production for a typical railway section. Discrete event simulation (DES) modeling is utilized to conduct the analysis. To substitute the alternative method, scanning a typical railway section falls within the capabilities of most laser scanning technologies; however, the processing of images to create a useable model controls. This research demonstrates a case study of applying DES to analyze productivity impacts on a repetitive process and investigates the capabilities of 3D imaging technologies for effective field use.
- 17 May 2012
- Published by American Society of Civil Engineers (ASCE)
- p. 1052-1062
A Case Study of 3D Imaging Productivity Needs to Support Infrastructure Construction
The national infrastructure system is at a crossroads with a need for renewal and expansion in the most efficient manner possible. Light railway construction requires the installation of embedments in reinforced concrete pavement along the length of elevated sections of the railway system. Conventionally, wooden dowels are manually placed into the reinforcing steel mat before concrete placement to form the slot for the embedments; however this is labor intensive and can yield inconsistent spacing. An alternative method is digitally mapping the locations of the reinforcing steel-free space prior to concrete placement to identify where holes could be drilled without hitting the steel reinforcement. The challenge is avoiding impacting production. Using field-based data, this study identifies the number of hours to create the map without impacting production for a typical railway section. Discrete event simulation (DES) modeling is utilized to conduct the analysis. To substitute the alternative method, scanning a typical railway section falls within the capabilities of most laser scanning technologies; however, the processing of images to create a useable model controls. This research demonstrates a case study of applying DES to analyze productivity impacts on a repetitive process and investigates the capabilities of 3D imaging technologies for effective field use.
- 5 July 2011
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Transactions on Instrumentation and Measurement
- Vol. 61 (1) , 103-110
Experimental Verification of Formulas for Variances of Plane Parameters Fitted to Three-Dimensional Imaging Data
Nonlinear least squares method is applied to fit a plane to 3-D imaging data. Two different error functions used in fitting are tested: orthogonal and directional. Variances of fitted parameters are calculated either from a single data set using derived earlier analytical formulas or by repeating the scans at the same experimental settings. In the latter case, the variance is equal to the square of the standard deviation from the repeated scans. The results show that the orthogonal error function severely underestimates the variances calculated by using the mathematical formulas when compared to the variances calculated from multiple scans. The variances calculated from formulas based on the directional error function are in good agreement with the estimates calculated from multiple scans. Thus, the variances of the fitted plane parameter can be determined correctly from a single scan when proper formulas are used. This is important because multiple scans from the same location are typically not performed in the field.
- 5 July 2011
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Transactions on Instrumentation and Measurement
- Vol. 61 (1) , 103-110
Experimental Verification of Formulas for Variances of Plane Parameters Fitted to Three-Dimensional Imaging Data
Nonlinear least squares method is applied to fit a plane to 3-D imaging data. Two different error functions used in fitting are tested: orthogonal and directional. Variances of fitted parameters are calculated either from a single data set using derived earlier analytical formulas or by repeating the scans at the same experimental settings. In the latter case, the variance is equal to the square of the standard deviation from the repeated scans. The results show that the orthogonal error function severely underestimates the variances calculated by using the mathematical formulas when compared to the variances calculated from multiple scans. The variances calculated from formulas based on the directional error function are in good agreement with the estimates calculated from multiple scans. Thus, the variances of the fitted plane parameter can be determined correctly from a single scan when proper formulas are used. This is important because multiple scans from the same location are typically not performed in the field.
- 1 September 2006
- Published by Springer Nature in Autonomous Robots
- Vol. 22 (3) , 211-221
NIST research in autonomous construction
- 1 September 2006
- Published by Springer Nature in Autonomous Robots
- Vol. 22 (3) , 211-221
NIST research in autonomous construction