Christian Artigues
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Christian Artigues has a total of 3 co-authors. Here are the top co-authors by number of shared publications:
- Pierre Lopez
CNRS, LAAS
2 shared publications Pierre-Dimitri Ayache
FRE CNRS 2487 Laboratoire d'Informatique d'Avignon BP 1228 84911 Avignon France
2 shared publicationsFrançois Roubellat
Laboratoire d'Analyse et d'Architecture des Systèmes du CNRS, 7 avenue du Colonel Roche, Toulouse 31077, Cedex 4, France
1 shared publication
Latest Publications
- Open Access
Schedule generation schemes for the job-shop problem with sequence-dependent setup times: dominance properties and computational analysis
We consider the job-shop problem with sequence-dependent setup times. We focus on the formal definition of schedule generation schemes (SGSs) based on the semi-active, active, and non-delay schedule categories. We study dominance properties of the sets of schedules obtainable with each SGS. We show how the proposed SGSs can be used within single-pass and multi-pass priority rule based heuristics. We study several priority rules for the problem and provide a comparative computational analysis of the different SGSs on sets of instances taken from the literature. The proposed SGSs significantly improve previously best-known results on a set of hard benchmark instances.
Open AccessSchedule generation schemes for the job-shop problem with sequence-dependent setup times: dominance properties and computational analysis
We consider the job-shop problem with sequence-dependent setup times. We focus on the formal definition of schedule generation schemes (SGSs) based on the semi-active, active, and non-delay schedule categories. We study dominance properties of the sets of schedules obtainable with each SGS. We show how the proposed SGSs can be used within single-pass and multi-pass priority rule based heuristics. We study several priority rules for the problem and provide a comparative computational analysis of the different SGSs on sets of instances taken from the literature. The proposed SGSs significantly improve previously best-known results on a set of hard benchmark instances.
- 1 September 2005
- Published by Springer Nature in Annals of Operations Research
- Vol. 138 (1) , 21-52
Schedule Generation Schemes for the Job-Shop Problem with Sequence-Dependent Setup Times: Dominance Properties and Computational Analysis
- 1 September 2005
- Published by Springer Nature in Annals of Operations Research
- Vol. 138 (1) , 21-52
Schedule Generation Schemes for the Job-Shop Problem with Sequence-Dependent Setup Times: Dominance Properties and Computational Analysis
- 26 October 2001
- Published by Elsevier in International Journal of Production Economics
- Vol. 74 (1-3) , 63-75
A Petri net model and a general method for on and off-line multi-resource shop floor scheduling with setup times
- 26 October 2001
- Published by Elsevier in International Journal of Production Economics
- Vol. 74 (1-3) , 63-75
A Petri net model and a general method for on and off-line multi-resource shop floor scheduling with setup times