Heiner Ackermann
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Heiner Ackermann has a total of 45 co-authors. Here are the top co-authors by number of shared publications:
- Christian Weiß
Fraunhofer Institute for Industrial Mathematics ITWM
6 shared publications - Christoph Hertrich
University of Technology Nuremberg, Nuremberg, Germany
4 shared publications - Sandy Heydrich
Department of Optimization, Fraunhofer Institute for Industrial Mathematics ITWM, Kaiserslautern, Germany
4 shared publications - Sven Oliver Krumke
RPTU Kaiserslautern-Landau
3 shared publications Erik Diessel
Fraunhofer Institute for Industrial Mathematics ITWM, Kaiserslautern, Germany
2 shared publications- Erik Diessel
Fraunhofer ITWM, Kaiserslautern, Germany
2 shared publications
Latest Publications
- Open Access
- 18 March 2026
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Access
- Vol. 14, 44974-44991
Toward Programmable Infrastructure for Organic and Flexible 6G Networks
The next generation of wireless mobile networks will be driven by software and infrastructure virtualization. At the same time, the underlying hardware will become more diverse. Edge, intermediate and central network nodes will allow distributed deployments of never seen before scale. Non-terrestrial networks, nomadic networks and networks in networks promise more dynamicity, changing their topologies over time in predictable and unpredictable ways. To handle the complexity and dynamicity, a highly flexible and adaptable network is required. The key enablers of this complex digital communication system will be programmable infrastructures. From programmable access and flexible backhauls to zero-touch, adaptable and resilient control planes, we conducted research into advanced programmability at different layers of the network, within the Open6GHub project. In this article, we present innovative solutions for advanced programmable network infrastructure and show why they are essential for our vision of the programmable infrastructure of future wireless mobile networks.
- 18 March 2026
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Access
- Vol. 14, 44974-44991
Open AccessToward Programmable Infrastructure for Organic and Flexible 6G Networks
The next generation of wireless mobile networks will be driven by software and infrastructure virtualization. At the same time, the underlying hardware will become more diverse. Edge, intermediate and central network nodes will allow distributed deployments of never seen before scale. Non-terrestrial networks, nomadic networks and networks in networks promise more dynamicity, changing their topologies over time in predictable and unpredictable ways. To handle the complexity and dynamicity, a highly flexible and adaptable network is required. The key enablers of this complex digital communication system will be programmable infrastructures. From programmable access and flexible backhauls to zero-touch, adaptable and resilient control planes, we conducted research into advanced programmability at different layers of the network, within the Open6GHub project. In this article, we present innovative solutions for advanced programmable network infrastructure and show why they are essential for our vision of the programmable infrastructure of future wireless mobile networks.
- Open Access
- 23 October 2024
- Published by Springer Nature in Journal of Scheduling
- Vol. 27 (6) , 565-585
Scheduling a single machine with multiple due dates per job
In this paper, we consider single-machine scheduling with multiple due dates per job. This is motivated by several industrial applications, where it is not important by how much we miss a due date. Instead the relevant objective is to minimize the number of missed due dates. Typically, this situation emerges whenever fixed delivery appointments are chosen in advance, such as in the production of individualized pharmaceuticals or when customers can only receive goods at certain days in the week, due to constraints in their warehouse operation. We compare this previously unexplored problem with classical due date scheduling, for which it is a generalization. We show that single-machine scheduling with multiple due dates is NP-hard in the strong sense if processing times are job dependent. If processing times are equal for all jobs, then single-machine scheduling with multiple due dates is at least as hard as the long-standing open problem of weighted tardiness with equal processing times and release dates $$1 \mid r_j, p_j = p \mid \sum w_j T_j$$ . Finally, we focus on the case of equal processing times and provide several polynomially solvable special cases as well as an exact branch-and-bound algorithm and heuristics for the general case. Experiments show that our branch-and-bound algorithm compares well to modern exact methods to solve problem $$1 \mid r_j, p_j = p \mid \sum w_{j} T_{j}$$ .- 23 October 2024
- Published by Springer Nature in Journal of Scheduling
- Vol. 27 (6) , 565-585
Open AccessScheduling a single machine with multiple due dates per job
In this paper, we consider single-machine scheduling with multiple due dates per job. This is motivated by several industrial applications, where it is not important by how much we miss a due date. Instead the relevant objective is to minimize the number of missed due dates. Typically, this situation emerges whenever fixed delivery appointments are chosen in advance, such as in the production of individualized pharmaceuticals or when customers can only receive goods at certain days in the week, due to constraints in their warehouse operation. We compare this previously unexplored problem with classical due date scheduling, for which it is a generalization. We show that single-machine scheduling with multiple due dates is NP-hard in the strong sense if processing times are job dependent. If processing times are equal for all jobs, then single-machine scheduling with multiple due dates is at least as hard as the long-standing open problem of weighted tardiness with equal processing times and release dates $$1 \mid r_j, p_j = p \mid \sum w_j T_j$$ . Finally, we focus on the case of equal processing times and provide several polynomially solvable special cases as well as an exact branch-and-bound algorithm and heuristics for the general case. Experiments show that our branch-and-bound algorithm compares well to modern exact methods to solve problem $$1 \mid r_j, p_j = p \mid \sum w_{j} T_{j}$$ . - Open Access
- 15 June 2024
- Published by Springer Nature in Operations Research Forum
- Vol. 5 (2) , 1-35
Computing Optimal Mitigation Plans for Force-Majeure Scenarios in Dynamic Manufacturing Chains
We consider force-majeure supply disruptions in a dynamic, multi-product manufacturing supply chain with time-dependent parameters. We present a linear programming model that captures a specific force-majeure scenario with respect to several objective functions that can be combined in a multi-objective framework, e.g., minimization of loss, maximization of shortage-free time, or prioritization of mitigation types. Solving this model yields an optimal mitigation plan that describes how to best (re-)allocate supply and production operations. Supported mitigation options include plant-side safety stock, supplier-side inventories, and additional production thus reflecting the manufacturing setting of a large-scale industrial player. We describe a workflow for increasing the resilience of supply chains based on risk profiles generated by our approach.
- 15 June 2024
- Published by Springer Nature in Operations Research Forum
- Vol. 5 (2) , 1-35
Open AccessComputing Optimal Mitigation Plans for Force-Majeure Scenarios in Dynamic Manufacturing Chains
We consider force-majeure supply disruptions in a dynamic, multi-product manufacturing supply chain with time-dependent parameters. We present a linear programming model that captures a specific force-majeure scenario with respect to several objective functions that can be combined in a multi-objective framework, e.g., minimization of loss, maximization of shortage-free time, or prioritization of mitigation types. Solving this model yields an optimal mitigation plan that describes how to best (re-)allocate supply and production operations. Supported mitigation options include plant-side safety stock, supplier-side inventories, and additional production thus reflecting the manufacturing setting of a large-scale industrial player. We describe a workflow for increasing the resilience of supply chains based on risk profiles generated by our approach.
- 30 August 2022
- Published by Springer Nature
- p. 353-358
Scheduling a Two Stage Proportionate Flexible Flow Shop with Dedicated Machines and No Buffers
- 30 August 2022
- Published by Springer Nature
- p. 353-358
Scheduling a Two Stage Proportionate Flexible Flow Shop with Dedicated Machines and No Buffers
- 22 April 2022
- Published by Elsevier
- p. 339-364
Dispatching for batch chemical processes using Monte-Carlo simulations—A practical approach to scheduling in operations
- 22 April 2022
- Published by Elsevier
- p. 339-364
Dispatching for batch chemical processes using Monte-Carlo simulations—A practical approach to scheduling in operations
- Open Access
- 11 April 2022
- Published by Springer Nature in Journal of Scheduling
- Vol. 25 (6) , 643-657
Online algorithms to schedule a proportionate flexible flow shop of batching machines
This paper is the first to consider online algorithms to schedule a proportionate flexible flow shop of batching machines (PFFB). The scheduling model is motivated by manufacturing processes of individualized medicaments, which are used in modern medicine to treat some serious illnesses. We provide two different online algorithms, proving also lower bounds for the offline problem to compute their competitive ratios. The first algorithm is an easy-to-implement, general local scheduling heuristic. It is 2-competitive for PFFBs with an arbitrary number of stages and for several natural scheduling objectives. We also show that for total/average flow time, no deterministic algorithm with better competitive ratio exists. For the special case with two stages and the makespan or total completion time objective, we describe an improved algorithm that achieves the best possible competitive ratio $$\varphi =\frac{1+\sqrt{5}}{2}$$ , the golden ratio. All our results also hold for proportionate (non-flexible) flow shops of batching machines (PFB) for which this is also the first paper to study online algorithms.- 11 April 2022
- Published by Springer Nature in Journal of Scheduling
- Vol. 25 (6) , 643-657
Open AccessOnline algorithms to schedule a proportionate flexible flow shop of batching machines
This paper is the first to consider online algorithms to schedule a proportionate flexible flow shop of batching machines (PFFB). The scheduling model is motivated by manufacturing processes of individualized medicaments, which are used in modern medicine to treat some serious illnesses. We provide two different online algorithms, proving also lower bounds for the offline problem to compute their competitive ratios. The first algorithm is an easy-to-implement, general local scheduling heuristic. It is 2-competitive for PFFBs with an arbitrary number of stages and for several natural scheduling objectives. We also show that for total/average flow time, no deterministic algorithm with better competitive ratio exists. For the special case with two stages and the makespan or total completion time objective, we describe an improved algorithm that achieves the best possible competitive ratio $$\varphi =\frac{1+\sqrt{5}}{2}$$ , the golden ratio. All our results also hold for proportionate (non-flexible) flow shops of batching machines (PFB) for which this is also the first paper to study online algorithms. - 25 September 2020
- Published by Springer Nature
- p. 693-699
Decision Support for Material Procurement
- Open Access
- 17 September 2020
- Published by Springer Nature in Journal of Scheduling
- Vol. 23 (5) , 575-593
Scheduling a proportionate flow shop of batching machines
In this paper we study a proportionate flow shop of batching machines with release dates and a fixed number $$m \ge 2$$ of machines. The scheduling problem has so far barely received any attention in the literature, but recently its importance has increased significantly, due to applications in the industrial scaling of modern bio-medicine production processes. We show that for any fixed number of machines, the makespan and the sum of completion times can be minimized in polynomial time. Furthermore, we show that the obtained algorithm can also be used to minimize the weighted total completion time, maximum lateness, total tardiness and (weighted) number of late jobs in polynomial time if all release dates are 0. Previously, polynomial time algorithms have only been known for two machines.- 17 September 2020
- Published by Springer Nature in Journal of Scheduling
- Vol. 23 (5) , 575-593
Open AccessScheduling a proportionate flow shop of batching machines
In this paper we study a proportionate flow shop of batching machines with release dates and a fixed number $$m \ge 2$$ of machines. The scheduling problem has so far barely received any attention in the literature, but recently its importance has increased significantly, due to applications in the industrial scaling of modern bio-medicine production processes. We show that for any fixed number of machines, the makespan and the sum of completion times can be minimized in polynomial time. Furthermore, we show that the obtained algorithm can also be used to minimize the weighted total completion time, maximum lateness, total tardiness and (weighted) number of late jobs in polynomial time if all release dates are 0. Previously, polynomial time algorithms have only been known for two machines. - Open Access
- 12 July 2020
- Published by Elsevier in EURO Journal on Computational Optimization
- Vol. 8 (3-4) , 263-288
A hierarchical approach for solving an integrated packing and sequence-optimization problem in production of glued laminated timber
- 12 July 2020
- Published by Elsevier in EURO Journal on Computational Optimization
- Vol. 8 (3-4) , 263-288
Open AccessA hierarchical approach for solving an integrated packing and sequence-optimization problem in production of glued laminated timber
- Open Access
Online Algorithms to Schedule a Proportionate Flexible Flow Shop of Batching Machines
This paper is the first to consider online algorithms to schedule a proportionate flexible flow shop of batching machines (PFFB). The scheduling model is motivated by manufacturing processes of individualized medicaments, which are used in modern medicine to treat some serious illnesses. We provide two different online algorithms, proving also lower bounds for the offline problem to compute their competitive ratios. The first algorithm is an easy-to-implement, general local scheduling heuristic. It is 2-competitive for PFFBs with an arbitrary number of stages and for several natural scheduling objectives. We also show that for total/average flow time, no deterministic algorithm with better competitive ratio exists. For the special case with two stages and the makespan or total completion time objective, we describe an improved algorithm that achieves the best possible competitive ratio $\varphi=\frac{1+\sqrt{5}}{2}$, the golden ratio. All our results also hold for proportionate (non-flexible) flow shops of batching machines (PFB) for which this is also the first paper to study online algorithms.Open AccessOnline Algorithms to Schedule a Proportionate Flexible Flow Shop of Batching Machines
This paper is the first to consider online algorithms to schedule a proportionate flexible flow shop of batching machines (PFFB). The scheduling model is motivated by manufacturing processes of individualized medicaments, which are used in modern medicine to treat some serious illnesses. We provide two different online algorithms, proving also lower bounds for the offline problem to compute their competitive ratios. The first algorithm is an easy-to-implement, general local scheduling heuristic. It is 2-competitive for PFFBs with an arbitrary number of stages and for several natural scheduling objectives. We also show that for total/average flow time, no deterministic algorithm with better competitive ratio exists. For the special case with two stages and the makespan or total completion time objective, we describe an improved algorithm that achieves the best possible competitive ratio $\varphi=\frac{1+\sqrt{5}}{2}$, the golden ratio. All our results also hold for proportionate (non-flexible) flow shops of batching machines (PFB) for which this is also the first paper to study online algorithms.