Rüdiger Kiesel
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Rüdiger Kiesel has a total of 23 co-authors. Here are the top co-authors by number of shared publications:
Gerhard Stahl
Economics and Business Administration , University Duisburg-Essen , Essen , Germany
2 shared publications- Alexander Blasberg
University of Duisburg-Essen
1 shared publication - Andrea Von Avenarius
Universität Duisburg-Essen, Universitätsstrasse 12, 45141 Essen, Germany
1 shared publication - Andreas Rupp
University of Ulm
1 shared publication - Daniel Bauer
Department of Risk Management and Insurance, Georgia State University, Atlanta, GA, 30303 ()
1 shared publication - Daniela Bergmann
Ulm University
1 shared publication
Latest Publications
- 25 July 2026
- Published by World Scientific Pub Co Pte Ltd in International Journal of Theoretical and Applied Finance
- Vol. 29 (05)
INCORPORATING FORWARD-LOOKING DATA IN PROBABILISTIC ANALYSIS OF NET-ZERO COMMITMENTS
In this paper, we leverage state-of-the-art natural language processing approaches to assess the articulation and implementation of corporate net-zero transition plans. We use the retrieved transition-relevant data to enhance a probabilistic analysis of corporate net-zero commitments. In a Bayesian net, we combine the probability of staying below the net-zero budget with an assessment of the net-zero transition plan to obtain a forward-looking adjusted probability that accounts for both past emissions reduction efforts and future transition plans. We find that in the multisectoral dataset of consideration, the adjusted probabilities are lower than the original ones for most of the companies, which might indicate inferior climate performance as in the assumed climate scenario or also a potential switch to a worse climate scenario.
- 25 July 2026
- Published by World Scientific Pub Co Pte Ltd in International Journal of Theoretical and Applied Finance
- Vol. 29 (05)
INCORPORATING FORWARD-LOOKING DATA IN PROBABILISTIC ANALYSIS OF NET-ZERO COMMITMENTS
In this paper, we leverage state-of-the-art natural language processing approaches to assess the articulation and implementation of corporate net-zero transition plans. We use the retrieved transition-relevant data to enhance a probabilistic analysis of corporate net-zero commitments. In a Bayesian net, we combine the probability of staying below the net-zero budget with an assessment of the net-zero transition plan to obtain a forward-looking adjusted probability that accounts for both past emissions reduction efforts and future transition plans. We find that in the multisectoral dataset of consideration, the adjusted probabilities are lower than the original ones for most of the companies, which might indicate inferior climate performance as in the assumed climate scenario or also a potential switch to a worse climate scenario.
- Open Access
- 28 February 2026
- Published by Walter de Gruyter GmbH in Statistics & Risk Modeling
- Vol. 43 (3-4) , 39-55
On formal properties of minimum capital requirements under Solvency II
Real issues with the application of Minimum Capital Requirements (MCR) on the organisational level of an insurance holding has been the starting point of this paper. In contrast to the Solvency Capital Required (SCR), which is the day-to-day risk measure for insurers, the MCR comes into play in adverse circumstances. After the presentation of the concept of MCR, its formal properties are given. Applications highlight some of its shortcomings. Then a mathematical framework based on concepts of Aubin’s viability theory sketches a unifying framework for both the SCR and MCR. Finally, a control theoretic framework is illustrated in a Cramer–Lundberg setting.
- 28 February 2026
- Published by Walter de Gruyter GmbH in Statistics & Risk Modeling
- Vol. 43 (3-4) , 39-55
Open AccessOn formal properties of minimum capital requirements under Solvency II
Real issues with the application of Minimum Capital Requirements (MCR) on the organisational level of an insurance holding has been the starting point of this paper. In contrast to the Solvency Capital Required (SCR), which is the day-to-day risk measure for insurers, the MCR comes into play in adverse circumstances. After the presentation of the concept of MCR, its formal properties are given. Applications highlight some of its shortcomings. Then a mathematical framework based on concepts of Aubin’s viability theory sketches a unifying framework for both the SCR and MCR. Finally, a control theoretic framework is illustrated in a Cramer–Lundberg setting.
- 8 March 2024
- Published by Springer Nature
- p. 247-267
Climate Risk in Structural Credit Models
- 5 September 2023
- Published by Cambridge University Press (CUP) in Annals of Actuarial Science
- Vol. 17 (3) , 420-437
An uncertainty-based risk management framework for climate change risk
Climate risks are systemic risks and may be clustered according to so-called volatilities, uncertainties, complexities, and ambiguities (VUCA) criteria. We analyze climate risk in the VUCA concept and provide a framework that allows to interpret systemic risks as model risk. As climate risks are characterized by deep uncertainties (unknown unknowns), we argue that precautionary and resilient principles should be applied instead of capital-based risk measures (reasonable for known unknows). A prominent example of the proposed principles is the precommitment approach (PCA). Within the PCA, subjective probabilities allow to discriminate between tolerable risks and acceptable ones. The amount of determined solvency capital for acceptable risks and estimations of model risk may be aggregated by means of a multiplier approach. This framework is in line with the three-pillar approach of Solvency II, especially with the recovery and resolution plan. Furthermore, it fits smoothly to a hybrid approach of micro- and macroprudential supervision.
- 5 September 2023
- Published by Cambridge University Press (CUP) in Annals of Actuarial Science
- Vol. 17 (3) , 420-437
An uncertainty-based risk management framework for climate change risk
Climate risks are systemic risks and may be clustered according to so-called volatilities, uncertainties, complexities, and ambiguities (VUCA) criteria. We analyze climate risk in the VUCA concept and provide a framework that allows to interpret systemic risks as model risk. As climate risks are characterized by deep uncertainties (unknown unknowns), we argue that precautionary and resilient principles should be applied instead of capital-based risk measures (reasonable for known unknows). A prominent example of the proposed principles is the precommitment approach (PCA). Within the PCA, subjective probabilities allow to discriminate between tolerable risks and acceptable ones. The amount of determined solvency capital for acceptable risks and estimations of model risk may be aggregated by means of a multiplier approach. This framework is in line with the three-pillar approach of Solvency II, especially with the recovery and resolution plan. Furthermore, it fits smoothly to a hybrid approach of micro- and macroprudential supervision.
- Open Access
- 5 April 2021
- Published by MDPI AG in Journal of Risk and Financial Management
- Vol. 14 (4) , 161
Modeling Market Order Arrivals on the German Intraday Electricity Market with the Hawkes Process
We use point processes to analyze market order arrivals on the intraday market for hourly electricity deliveries in Germany in the second quarter of 2015. As we distinguish between buys and sells, we work in a multivariate setting. We model the arrivals with a Hawkes process whose baseline intensity comprises either only an exponentially increasing component or a constant in addition to the exponentially increasing component, and whose excitation decays exponentially. Our goodness-of-fit tests indicate that the models where the intensity of each market order type is excited at least by events of the same type are the most promising ones. Based on the Akaike information criterion, the model without a constant in the baseline intensity and only self-excitation is selected in almost 50% of the cases on both market sides. The typical jump size of intensities in case of the arrival of a market order of the same type is quite large, yet rather short lived. Diurnal patterns in the parameters of the baseline intensity and the branching ratio of self-excitation are observable. Contemporaneous relationships between different parameters such as the jump size and decay rate of self and cross-excitation are found.
- 5 April 2021
- Published by MDPI AG in Journal of Risk and Financial Management
- Vol. 14 (4) , 161
Open AccessModeling Market Order Arrivals on the German Intraday Electricity Market with the Hawkes Process
We use point processes to analyze market order arrivals on the intraday market for hourly electricity deliveries in Germany in the second quarter of 2015. As we distinguish between buys and sells, we work in a multivariate setting. We model the arrivals with a Hawkes process whose baseline intensity comprises either only an exponentially increasing component or a constant in addition to the exponentially increasing component, and whose excitation decays exponentially. Our goodness-of-fit tests indicate that the models where the intensity of each market order type is excited at least by events of the same type are the most promising ones. Based on the Akaike information criterion, the model without a constant in the baseline intensity and only self-excitation is selected in almost 50% of the cases on both market sides. The typical jump size of intensities in case of the arrival of a market order of the same type is quite large, yet rather short lived. Diurnal patterns in the parameters of the baseline intensity and the branching ratio of self-excitation are observable. Contemporaneous relationships between different parameters such as the jump size and decay rate of self and cross-excitation are found.
- Open Access
Intraday Electricity Pricing of Night Contracts
This paper investigates the intraday electricity pricing of 15-min. contracts in night hours. We tailor a recently introduced econometric model with fundamental impacts, which is successful in describing the pricing of day contracts. Our estimation results show that the mean reversion and the positive price impact of neighboring contracts are generic features of the price formation process on the intraday market, independent of the time of day. Intraday auction prices have higher explanatory power for the pricing of night than day contracts, particularly, for the first and last 15-min. contract in a night hour. Intradaily updated forecasts of wind power infeed are the only significant fundamental factors for intraday electricity prices at night. Neither expected conventional capacities nor the slope of the merit order curve contribute to explaining price dynamics. Overall, we conclude that fundamentals lose in importance in night hours and the 15-min. intraday market is rather driven by price information.
Open AccessIntraday Electricity Pricing of Night Contracts
This paper investigates the intraday electricity pricing of 15-min. contracts in night hours. We tailor a recently introduced econometric model with fundamental impacts, which is successful in describing the pricing of day contracts. Our estimation results show that the mean reversion and the positive price impact of neighboring contracts are generic features of the price formation process on the intraday market, independent of the time of day. Intraday auction prices have higher explanatory power for the pricing of night than day contracts, particularly, for the first and last 15-min. contract in a night hour. Intradaily updated forecasts of wind power infeed are the only significant fundamental factors for intraday electricity prices at night. Neither expected conventional capacities nor the slope of the merit order curve contribute to explaining price dynamics. Overall, we conclude that fundamentals lose in importance in night hours and the 15-min. intraday market is rather driven by price information.
- Open Access
An Empirical Comparison of Carbon Credit Projects under the Clean Development Mechanism and Verified Carbon Standard
Carbon credit projects generate carbon credits by abating greenhouse gas emissions. Carbon credits can then be traded on carbon markets or immobilized in order to compensate for caused emissions. The Clean Development Mechanism (CDM) and Verified Carbon Standard (VCS), as the two most important carbon credit mechanisms, are investigated and compared regarding the success of projects. We define success as the fulfilling of the ex-ante emission abatement estimation and apply regression analyses to explain its variation on a project level by technology, location, scale, duration and participation. The results are discussed in detail on technology level for wind power, energy efficiency, hydro power as well as biomass projects and are compared with regard to CDM and VCS. Our main results indicate that large scale projects often compensate for their under-performance due to economies of time. Furthermore, the duration of projects, their location and structure of participants have significant influence on the success of the projects. The sign of the coefficients of explanatory variables are broadly in line with intuition and related literature, although, due to data availability, they are not always highly significant statistically.
Open AccessAn Empirical Comparison of Carbon Credit Projects under the Clean Development Mechanism and Verified Carbon Standard
Carbon credit projects generate carbon credits by abating greenhouse gas emissions. Carbon credits can then be traded on carbon markets or immobilized in order to compensate for caused emissions. The Clean Development Mechanism (CDM) and Verified Carbon Standard (VCS), as the two most important carbon credit mechanisms, are investigated and compared regarding the success of projects. We define success as the fulfilling of the ex-ante emission abatement estimation and apply regression analyses to explain its variation on a project level by technology, location, scale, duration and participation. The results are discussed in detail on technology level for wind power, energy efficiency, hydro power as well as biomass projects and are compared with regard to CDM and VCS. Our main results indicate that large scale projects often compensate for their under-performance due to economies of time. Furthermore, the duration of projects, their location and structure of participants have significant influence on the success of the projects. The sign of the coefficients of explanatory variables are broadly in line with intuition and related literature, although, due to data availability, they are not always highly significant statistically.
- Open Access
- 1 March 2017
- Published by Elsevier in Journal of Banking & Finance
- Vol. 76, 120-138
Option pricing under time-varying risk-aversion with applications to risk forecasting
- 1 March 2017
- Published by Elsevier in Journal of Banking & Finance
- Vol. 76, 120-138
Open AccessOption pricing under time-varying risk-aversion with applications to risk forecasting
- Open Access
The Wasserstein Metric and Robustness in Risk Management
In the aftermath of the financial crisis, it was realized that the mathematical models used for the valuation of financial instruments and the quantification of risk inherent in portfolios consisting of these financial instruments exhibit a substantial model risk. Consequently, regulators and other stakeholders have started to require that the internal models used by financial institutions are robust. We present an approach to consistently incorporate the robustness requirements into the quantitative risk management process of a financial institution, with a special focus on insurance. We advocate the Wasserstein metric as the canonical metric for approximations in robust risk management and present supporting arguments. Representing risk measures as statistical functionals, we relate risk measures with the concept of robustness and hence continuity with respect to the Wasserstein metric. This allows us to use results from robust statistics concerning continuity and differentiability of functionals. Finally, we illustrate our approach via practical applications.
Open AccessThe Wasserstein Metric and Robustness in Risk Management
In the aftermath of the financial crisis, it was realized that the mathematical models used for the valuation of financial instruments and the quantification of risk inherent in portfolios consisting of these financial instruments exhibit a substantial model risk. Consequently, regulators and other stakeholders have started to require that the internal models used by financial institutions are robust. We present an approach to consistently incorporate the robustness requirements into the quantitative risk management process of a financial institution, with a special focus on insurance. We advocate the Wasserstein metric as the canonical metric for approximations in robust risk management and present supporting arguments. Representing risk measures as statistical functionals, we relate risk measures with the concept of robustness and hence continuity with respect to the Wasserstein metric. This allows us to use results from robust statistics concerning continuity and differentiability of functionals. Finally, we illustrate our approach via practical applications.
- 25 July 2016
- Published by Cambridge University Press (CUP) in Advances in Applied Probability
- Vol. 48 (A) , 159-180
Time-varying copula models for financial time series
We perform an analysis of the potential time inhomogeneity in the dependence between multiple financial time series. To this end, we use the framework of copula theory and tackle the question of whether dependencies in such a case can be assumed constant throughout time or rather have to be modeled in a time-inhomogeneous way. We focus on parametric copula models and suitable inference techniques in the context of a special copula-based multivariate time series model. A recent result due to Chanet al.(2009) is used to derive the joint limiting distribution of local maximum-likelihood estimators on overlapping samples. By restricting the overlap to be fixed, we establish the limiting law of the maximum of the estimator series. Based on the limiting distributions, we develop statistical homogeneity tests, and investigate their local power properties. A Monte Carlo simulation study demonstrates that bootstrapped variance estimates are needed in finite samples. Empirical analyses on real-world financial data finally confirm that time-varying parameters are an exception rather than the rule.
- 25 July 2016
- Published by Cambridge University Press (CUP) in Advances in Applied Probability
- Vol. 48 (A) , 159-180
Time-varying copula models for financial time series
We perform an analysis of the potential time inhomogeneity in the dependence between multiple financial time series. To this end, we use the framework of copula theory and tackle the question of whether dependencies in such a case can be assumed constant throughout time or rather have to be modeled in a time-inhomogeneous way. We focus on parametric copula models and suitable inference techniques in the context of a special copula-based multivariate time series model. A recent result due to Chanet al.(2009) is used to derive the joint limiting distribution of local maximum-likelihood estimators on overlapping samples. By restricting the overlap to be fixed, we establish the limiting law of the maximum of the estimator series. Based on the limiting distributions, we develop statistical homogeneity tests, and investigate their local power properties. A Monte Carlo simulation study demonstrates that bootstrapped variance estimates are needed in finite samples. Empirical analyses on real-world financial data finally confirm that time-varying parameters are an exception rather than the rule.