Chih-Hsiung Wang
Research Subjects
Chih-Hsiung Wang has a total of 4 co-authors. Here are the top co-authors by number of shared publications:
I-Ming Huang
Department of Industrial Engineering and Management , I-Shou University , 1, Sector 1, Hsueh-Cheng Rd. Ta-Hsu Hsiang , Kaohsiung County , Taiwan R.O.C.
1 shared publicationM.-H. Chao
Department of Industrial Engineering and Management , Natinoal Kaohsiung University of Applied Sciences , 415 Chien Kung Road , Kaohsiung , 807 , Taiwan R.O.C.
1 shared publicationPeitsang Wu
I-Shou University Ta-Hsu Hsiang, Kaohsiung County Taiwan
1 shared publicationRuey Huei Yeh
National Taiwan University of Science and Technology Taipei Taiwan
1 shared publication
Latest Publications
- 1 November 2006
- Published by Taylor & Francis in Journal of Statistics and Management Systems
- Vol. 9 (3) , 689-698
A note on a (Q, r) model
Hadley and Whitin’s lot-size, reorder point model (Q, r) has been widely used in industry because the effects of uncertain demands during lead time is incorporated properly. However, there is no efficient solution procedure for computing the optimal policies. In the literature, an iterative solution procedure is proposed. To avoid iterative computations for an optimal policy, the (Q, r) model has been studied to derive an explicit formula for the optimal solution when lead time demand distribution possesses a certain property. Unfortunately, this result can not be applicable for the lead time demand distributions, Gamma or Normal, and they are sometimes considered the most appealing distributions for modeling the lead time demand. In this paper, we study the (Q, r) model assuming that the lead time demand is generally distributed. Some useful results are obtained to facilitate a robust and efficient solution procedure for the optimal policy. A numerical example is provided to illustrate the solution procedure for the optimal lot-size and reorder point policy.
- 1 November 2006
- Published by Taylor & Francis in Journal of Statistics and Management Systems
- Vol. 9 (3) , 689-698
A note on a (Q, r) model
Hadley and Whitin’s lot-size, reorder point model (Q, r) has been widely used in industry because the effects of uncertain demands during lead time is incorporated properly. However, there is no efficient solution procedure for computing the optimal policies. In the literature, an iterative solution procedure is proposed. To avoid iterative computations for an optimal policy, the (Q, r) model has been studied to derive an explicit formula for the optimal solution when lead time demand distribution possesses a certain property. Unfortunately, this result can not be applicable for the lead time demand distributions, Gamma or Normal, and they are sometimes considered the most appealing distributions for modeling the lead time demand. In this paper, we study the (Q, r) model assuming that the lead time demand is generally distributed. Some useful results are obtained to facilitate a robust and efficient solution procedure for the optimal policy. A numerical example is provided to illustrate the solution procedure for the optimal lot-size and reorder point policy.
- 1 March 2006
- Published by Taylor & Francis in Journal of the Operational Research Society
- Vol. 57 (3) , 262-270
Optimal production time and number of maintenance actions for an imperfect production system under equal-interval maintenance policy
Journal of the Operational Research Society (JORS) is the world's longest established OR journal and an official journal of The OR Society. It is the aim of the Journal to present papers which are relevant to practitioners, researchers, teachers, students and consumers of operational research, and which cover the theory, practice, history or methodology of OR.
- 1 March 2006
- Published by Taylor & Francis in Journal of the Operational Research Society
- Vol. 57 (3) , 262-270
Optimal production time and number of maintenance actions for an imperfect production system under equal-interval maintenance policy
Journal of the Operational Research Society (JORS) is the world's longest established OR journal and an official journal of The OR Society. It is the aim of the Journal to present papers which are relevant to practitioners, researchers, teachers, students and consumers of operational research, and which cover the theory, practice, history or methodology of OR.
- 1 January 2006
- Published by Taru Publications in Journal of Information and Optimization Sciences
- Vol. 27 (1) , 249-258
Capital investment in setup cost reduction for a lot-size, reorder point model
This paper extends the Hadley and Whitin's lot-size, reorder point model to consider the deteriorating production system that can go “out-of-control” while producing items. Once the production system is out of control, a proportionally greater number of defective units will be produced than when the system is in control. Therefore, in order to operate this production process economically, periodic inspection and maintenance actions are needed. The option of capital investment in setup cost reduction introduced by Porteus is also included in our model. A mathematical model is used to determine the optimal policy the minimizes the expected total annual cost by obtaining optimal production lot size, reordering point,and investment in setup cost reduction. Explicit solutions are presented for two specific demand distributions, uniform and exponential, during lead time. A numerical example shows that lowering the setup cost will result in great benefit to a firm.
- 1 January 2006
- Published by Taru Publications in Journal of Information and Optimization Sciences
- Vol. 27 (1) , 249-258
Capital investment in setup cost reduction for a lot-size, reorder point model
This paper extends the Hadley and Whitin's lot-size, reorder point model to consider the deteriorating production system that can go “out-of-control” while producing items. Once the production system is out of control, a proportionally greater number of defective units will be produced than when the system is in control. Therefore, in order to operate this production process economically, periodic inspection and maintenance actions are needed. The option of capital investment in setup cost reduction introduced by Porteus is also included in our model. A mathematical model is used to determine the optimal policy the minimizes the expected total annual cost by obtaining optimal production lot size, reordering point,and investment in setup cost reduction. Explicit solutions are presented for two specific demand distributions, uniform and exponential, during lead time. A numerical example shows that lowering the setup cost will result in great benefit to a firm.
- 27 December 2005
- Published by Wiley in Naval Research Logistics (NRL)
- Vol. 53 (2) , 151-156
Optimal production and maintenance policy for imperfect production systems
A joint optimization of the production run length and preventive maintenance (PM) policy is studied for a deteriorating production system where the in‐control period follows a general probability distribution with non‐decreasing failure rate. In the literature, the sufficient conditions for the optimality of the equal‐interval PM schedule is explored to derive an optimal production run length and an optimal number of PM actions. Nevertheless, an exhaustive search may arise. In this study, based on the assumption that the conditions for the optimality of the equal‐interval PM schedule hold, we derive some structural properties for the optimal production/PM policy, which increases the efficiency of the solution procedure. These analyses have implications for the practical application of the production/PM model to be more available in practice. A numerical example of gamma shift distribution with non‐decreasing failure rates is used to illustrate the solution procedure, leading to some insight into the management process. © 2005 Wiley Periodicals, Inc. Naval Research Logistics, 2006
- 27 December 2005
- Published by Wiley in Naval Research Logistics (NRL)
- Vol. 53 (2) , 151-156
Optimal production and maintenance policy for imperfect production systems
A joint optimization of the production run length and preventive maintenance (PM) policy is studied for a deteriorating production system where the in‐control period follows a general probability distribution with non‐decreasing failure rate. In the literature, the sufficient conditions for the optimality of the equal‐interval PM schedule is explored to derive an optimal production run length and an optimal number of PM actions. Nevertheless, an exhaustive search may arise. In this study, based on the assumption that the conditions for the optimality of the equal‐interval PM schedule hold, we derive some structural properties for the optimal production/PM policy, which increases the efficiency of the solution procedure. These analyses have implications for the practical application of the production/PM model to be more available in practice. A numerical example of gamma shift distribution with non‐decreasing failure rates is used to illustrate the solution procedure, leading to some insight into the management process. © 2005 Wiley Periodicals, Inc. Naval Research Logistics, 2006
- 1 January 2005
- Published by Taylor & Francis in Journal of Statistics and Management Systems
- Vol. 8 (3) , 601-613
A production model with imperfect preventive maintenance
We study a production system subjected to a continuous deteriorating which can go “out-of-control” while producing items. Once out of control, the process produces a fixed proportion of defective items until the “out-of-control” state is restored by a scheduled maintenance. To operate the system economically, lot sizing and periodic maintenance of the process are needed. In this study, we assume that the life distribution of the system changes after each maintenance in such a way that its failure rate function increases with the number of maintenances carried out. Also, the restoration cost is assumed to be non-decreasing with the number of maintenance. The formula for the long-run expected average cost per unit time is obtained. The objective is to minimize the expected average cost so as to determine an optimal production and maintenance policy. A solution procedure is provided for the optimal policy Several previous results are shown to be an extension of this study. To gain some insights, numerical examples are performed with various parameters combination is given.
- 1 January 2005
- Published by Taylor & Francis in Journal of Statistics and Management Systems
- Vol. 8 (3) , 601-613
A production model with imperfect preventive maintenance
We study a production system subjected to a continuous deteriorating which can go “out-of-control” while producing items. Once out of control, the process produces a fixed proportion of defective items until the “out-of-control” state is restored by a scheduled maintenance. To operate the system economically, lot sizing and periodic maintenance of the process are needed. In this study, we assume that the life distribution of the system changes after each maintenance in such a way that its failure rate function increases with the number of maintenances carried out. Also, the restoration cost is assumed to be non-decreasing with the number of maintenance. The formula for the long-run expected average cost per unit time is obtained. The objective is to minimize the expected average cost so as to determine an optimal production and maintenance policy. A solution procedure is provided for the optimal policy Several previous results are shown to be an extension of this study. To gain some insights, numerical examples are performed with various parameters combination is given.