WCWhitney G. Colella

Whitney G. Colella

*This is an algorithmically generated author record based on publicly available information.

Current Organizations / Institutes

The organizations/institutes from the scholar's latest article

Previous Organizations / Institutes

The organizations / institutes from the scholar's other articles in the past ten years


Whitney G. Colella has a total of 7 co-authors. Here are the top co-authors by number of shared publications:

  • A. Ph. Hein

    Department of Mechanical Engineering, University of Dortmund, Leonhard‐Euler‐Str. 2, 44227 Dortmund, Germany

    1 shared publication
  • Andrew B. Spisak

    Strategic Analysis, Inc., Energy Services Division, Wilson Boulevard 4075, Suite 200, Arlington, VA 22203

    1 shared publication
  • Brian D. James

    Strategic Analysis, Inc., Energy Services Division, Wilson Boulevard 4075, Suite 200, Arlington, VA 22203

    1 shared publication
  • C. R. Niemoth

    Department of Mechanical Engineering, Stanford University, Bldg. 530, 440 Escondido Mall, Stanford, California 94305‐3030, USA

    1 shared publication
  • C. Y. Lim

    Department of Mechanical Engineering, Stanford University, Bldg. 530, 440 Escondido Mall, Stanford, California 94305‐3030, USA

    1 shared publication
  • Heather Dillon

    School of Engineering and Technology, University of Washington Tacoma, Tacoma, WA

    1 shared publication

Latest Publications

  • Energy System and Thermoeconomic Analysis of Combined Heat and Power High Temperature Proton Exchange Membrane Fuel Cell Systems for Light Commercial Buildings

    by Whitney G. Colella, Siva P. Pilli

    The United States Department of Energy’s Pacific Northwest National Laboratory is teaming with industry to deploy and independently monitor 5-kilowatt-electric (kWe) combined heat and power (CHP) fuel cell systems (FCSs) in light commercial buildings. Results of an independent evaluation of manufacturer-stated engineering, economic, and environmental performance of these CHP FCSs are presented here. An important contribution of this paper is the precise definition and development of these essential terms for quantifying distributed CHP generator energy use within buildings: (1) electricity and heat utilization, (2) electrical and heat recovery efficiencies, (3) in-use electrical and heat recovery efficiencies, (4) percentage usage of electricity, and (5) percent usage of recoverable heat. Key additional parameters evaluated include the average cost of the CHP FCSs per unit of power and per unit of energy, the change in greenhouse gas (GHG) and air pollution emissions with a switch from conventional power plants and furnaces to CHP FCSs, the change in GHG mitigation costs from the switch, and the change in human health costs from air pollution. CHP FCS heat utilization is expected to be under 100% at several installation sites; for six sites, during periods of minimum heating demand, the in-use CHP FCS heat recovery (HR) efficiency based on the higher heating value of natural gas is expected to be only 24.4%. From the power perspective, the average per-unit cost (PUC) of electrical power is estimated to span $15–19,000/kWe (depending on site-specific installation, fuel, and other costs), while the average PUC of electrical and HR power is $7,000–9,000/kW. Regarding energy, the average PUC of electrical energy is $0.38–$0.46/kilowatt-hour-electric, while the average PUC of electrical and HR energy is $0.18–$0.23/kWh. GHG emissions were estimated to decrease by one-third after replacing a conventional system with a CHP FCS. GHG mitigation costs were also proportional to changes in GHG emissions. Estimated human health costs from air pollution emissions decreased by a factor of 1000 with changing to CHP FCS. Reported for the first time here is the derivation of the PUCs of power and energy for a CHP device from both standard and management accounting (MA) perspectives. Results show that the average PUC of combined electrical and HR power is equal to the average PUC of electric power applying an MA approach, and also equal to the average PUC of HR power applying an MA approach. Similar relations hold for the average PUC of energy. Results presented here demonstrate the value of using the equations herein for economic analyses of CHP systems to represent the average PUC of electrical power, HR power, or both, and for energy.


  • Independent Analysis of Real-Time, Measured Performance Data From Microcogenerative Fuel Cell Systems Installed in Buildings

    by Heather E. Dillon, Whitney G. Colella

    Pacific Northwest National Laboratory (PNNL) is working with industry to independently monitor up to 15 distinct 5 kW-electric (kWe) combined heat and power (CHP) high temperature (HT) proton exchange membrane (PEM) fuel cell systems (FCSs) installed in light commercial buildings. This research paper discusses an evaluation of the first six months of measured performance data acquired at a 1 s sampling rate from real-time monitoring equipment attached to the FCSs at building sites. Engineering performance parameters are independently evaluated. Based on an analysis of the first few months of measured operating data, FCS performance is consistent with manufacturer-stated performance. Initial data indicate that the FCSs have relatively stable performance and a long-term average production of about 4.57 kWe of power. This value is consistent with, but slightly below, the manufacturer's stated rated electric power output of 5 kWe. The measured system net electric efficiency has averaged 33.7%, based on the higher heating value (HHV) of natural gas fuel. This value, also, is consistent with, but slightly below, the manufacturer's stated rated electric efficiency of 36%. The FCSs provide low-grade hot water to the building at a measured average temperature of about 48.4 °C, lower than the manufacturer's stated maximum hot water delivery temperature of 65 °C. The uptime of the systems is also evaluated. System availability can be defined as the quotient of total operating time compared to time since commissioning. The average values for system availability vary between 96.1 and 97.3%, depending on the FCS evaluated in the field. Performance at rated value for electrical efficiency (PRVeff) can be defined as the quotient of the system time operating at or above the rated electric efficiency and the time since commissioning. The PRVeff varies between 5.6% and 31.6%, depending on the FCS field unit evaluated. Performance at rated value for electrical power (PRVp) can be defined as the quotient of the system time operating at or above the rated electric power and the time since commissioning. PRVp varies between 6.5% and 16.2%. Performance at rated value for electrical efficiency and power (PRVt) can be defined as the quotient of the system time operating at or above both the rated electric efficiency and the electric power output compared to the time since commissioning. PRVt varies between 0.2% and 1.4%. Optimization to determine the manufacturer rating required to achieve PRVt greater than 80% has been performed based on the collected data. For example, for FCS Unit 130 to achieve a PRVt of 95%, it would have to be down-rated to an electrical power output of 3.2 kWe and an electrical efficiency of 29%. The use of PRV as an assessment metric for FCSs has been developed and reported for the first time in this paper. For FCS Unit 130, a maximum decline in electric power output of approximately 18% was observed over a 500 h period in Jan. 2012.


  • Design for Manufacturing and Assembly Cost Estimate Methodology for Transportation Fuel Cell Systems

    by Brian D. James, Andrew B. Spisak, Whitney G. Colella

    This article presents a design for manufacturing and assembly (DFMA) methodology for estimating the capital costs of new, emerging energy technologies built at varying rates of mass-production. The methodology consists of four major steps: (1) System Conceptual Design, (2) System Physical Design, (3) Cost Modeling, and (4) Continuous Improvement to Reduce Cost. The article describes the application of this methodology to a specific case study of automotive fuel cell systems (FCSs). Because any alternative automotive technology must compete with the very mature and widespread gasoline internal combustion engine, it is vitally important to identify the performance, design, and manufacturing conditions needed to reduce automotive FCS costs. Thus, a DFMA-style analysis is applied to the cost to manufacture a polymer electrolyte membrane (PEM) FCS for cars, at varying rates of production (between 1,000 and 500,000 vehicles per year). The results of this kind of DFMA-style analysis can be used to elucidate key cost drivers at varying levels of production for new energy technologies.