Hans P. Geering
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Research Subjects
Hans P. Geering has a total of 7 co-authors. Here are the top co-authors by number of shared publications:
- Florian Herzog
SwissQuant Group AG and ETH Zurich , Universitaetsstrasse 9, CH-8006 Zurich , Switzerland
2 shared publications - Gabriel Dondi
SwissQuant Group AG
2 shared publications - Emil Dumitrescu
Université de Lyon, INSA Lyon, Ampère (UMR5005), F-69621 Villeurbanne, France
1 shared publication - Guillaume Ducard
ETH Zürich, Sonneggstrasse 3, ML K, 8092, Switzerland
1 shared publication - Malte Schneider
ETH Zurich, Measurement and Control Laboratory, CH‐8092 Zurich, Switzerland;;;;and
1 shared publication - Mauricio Tejeda
Julius Baer & Co. Ltd., Zurich, Switzerland
1 shared publication
Latest Publications
- 5 May 2010
- Published by Springer Nature
- p. 375-408
Stochastic Optimal Control with Applications in Financial Engineering
- 5 May 2010
- Published by Springer Nature
- p. 375-408
Stochastic Optimal Control with Applications in Financial Engineering
- 21 December 2007
- Published by Wiley in R&D Management
- Vol. 38 (1) , 85-106
Making real options work for practitioners: a generic model for valuing R&D projects
We propose a generic valuation framework for the appraisal of R&D projects based on real option theory. The added value of this approach is the presentation of a model that was implemented in a manner that allows corporate decision makers to use real options in an intuitive and standardized way. The project valuation procedure is separated into three main phases: project modeling, data and input collection, and result generation and analysis. The project model represents the structure of the real world R&D project with its investments, expected results, and decisions that need to be taken conditionally on the outcomes of research activities. The project model is represented in the form of a decision tree, where different research results or taken decisions lead to new branches. In this way, every possible situation the project can pass through can be represented. Uncertainties are separated into market uncertainties (e.g., market prices) and project specific, private uncertainties (e.g. uncertainty of research results). For both uncertainties, event trees are constructed which are then combined and merged with the above mentioned decision tree in order to represent the value evolution of the R&D project under given decisions and uncertainties. For every possible state of the project the real option value is calculated. By creating multidimensional trees, a multitude of decision steps and various kinds of real options (e.g., continue, expansion, switch, abandonment) can be modeled. The calculation complexity for the decision trees is given. From the tree structure we can calculate the real option value of starting an R&D project, i.e., the value of undertaking the first investment and thus acquiring the subsequent decision opportunities given by the completion of the first research effort. Furthermore, the optimal exercise strategy is derived from the decision tree. The exercise strategy gives the manager the possibility to have an a priori overview of where an R&D project may lead to, which decisions need to be taken in which circumstances, and when the project needs to be stopped in order not to generate losses. In an in‐depth case study we use an illustrative R&D project to set up and discuss the three phases of project modeling in the real options framework: building the multidimensional decision tree, input generation, and calculation of the real option value as well as the optimal strategy for the R&D project.
- 21 December 2007
- Published by Wiley in R&D Management
- Vol. 38 (1) , 85-106
Making real options work for practitioners: a generic model for valuing R&D projects
We propose a generic valuation framework for the appraisal of R&D projects based on real option theory. The added value of this approach is the presentation of a model that was implemented in a manner that allows corporate decision makers to use real options in an intuitive and standardized way. The project valuation procedure is separated into three main phases: project modeling, data and input collection, and result generation and analysis. The project model represents the structure of the real world R&D project with its investments, expected results, and decisions that need to be taken conditionally on the outcomes of research activities. The project model is represented in the form of a decision tree, where different research results or taken decisions lead to new branches. In this way, every possible situation the project can pass through can be represented. Uncertainties are separated into market uncertainties (e.g., market prices) and project specific, private uncertainties (e.g. uncertainty of research results). For both uncertainties, event trees are constructed which are then combined and merged with the above mentioned decision tree in order to represent the value evolution of the R&D project under given decisions and uncertainties. For every possible state of the project the real option value is calculated. By creating multidimensional trees, a multitude of decision steps and various kinds of real options (e.g., continue, expansion, switch, abandonment) can be modeled. The calculation complexity for the decision trees is given. From the tree structure we can calculate the real option value of starting an R&D project, i.e., the value of undertaking the first investment and thus acquiring the subsequent decision opportunities given by the completion of the first research effort. Furthermore, the optimal exercise strategy is derived from the decision tree. The exercise strategy gives the manager the possibility to have an a priori overview of where an R&D project may lead to, which decisions need to be taken in which circumstances, and when the project needs to be stopped in order not to generate losses. In an in‐depth case study we use an illustrative R&D project to set up and discuss the three phases of project modeling in the real options framework: building the multidimensional decision tree, input generation, and calculation of the real option value as well as the optimal strategy for the R&D project.
- 1 January 2006
- Published by Institute of Electrical and Electronics Engineers (IEEE)
- p. 1-10
Efficient Control Allocation for Fault Tolerant Embedded Systems on Small Autonomous Aircrafts
In this paper, a control allocation module with explicit laws has been designed for fast operation and low computational load, so that this algorithm can run in a small processor or microcontroller with limited floating point operation capability. The control allocation method is capable of compensating for actuator faults. Given the appropriate fault detection system, there is no need to redesign the controller, since the control allocator compensates for any fault occurring. A comparison shows that this method yields satisfactory results, provides optimal solutions in some cases, and is simpler and faster than conventional methods.
- 1 January 2006
- Published by Institute of Electrical and Electronics Engineers (IEEE)
- p. 1-10
Efficient Control Allocation for Fault Tolerant Embedded Systems on Small Autonomous Aircrafts
In this paper, a control allocation module with explicit laws has been designed for fast operation and low computational load, so that this algorithm can run in a small processor or microcontroller with limited floating point operation capability. The control allocation method is capable of compensating for actuator faults. Given the appropriate fault detection system, there is no need to redesign the controller, since the control allocator compensates for any fault occurring. A comparison shows that this method yields satisfactory results, provides optimal solutions in some cases, and is simpler and faster than conventional methods.