Marc A. Maes
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Marc A. Maes has a total of 13 co-authors. Here are the top co-authors by number of shared publications:
- Markus R. Dann
University of Calgary
4 shared publications A K Midtgaard
Norwegian Public Road Administration, Norway
1 shared publicationArvid Naess
Centre for Ships and Ocean Structures , Norwegian University of Science and Technology , NO-7491 , Trondheim , Norway ; Department of Mathematical Sciences , Norwegian University of Science and Technology , NO-7491 , Trondheim , Norway
1 shared publication- Arvid Naess
Department of Mathematical Sciences, Centre for Ships and Ocean Structures, Norwegian University of Science and Technology, NO-7491 Trondheim, Norway
1 shared publication - David B. Lewis
Blade Energy Partners, 6801 Gaylord Parkway, Frisco, Texas, 75034
1 shared publication - Dongning Li
Calgary, Alberta, Canada, T2P 3G3
1 shared publication
Latest Publications
- 2 January 2019
- Published by Taylor & Francis in Civil Engineering and Environmental Systems
- Vol. 36 (1) , 73-82
Misconceptions and stereotypes regarding experts providing support for risk-informed decision making
Support for high-level technical and environmental risk assessment and for large-scale decision making in general is typically provided by qualified experts. Often praised, but also reviled and blamed, the expert dwells in a cocoon of models and expertise and is armed with algorithms, regulations, and technical procedures to justify the support provided. At the end of the day experts often find themselves in sensitive and confrontational situations, as communication about highly uncertain issues is inherently ‘risky’. The objective of this paper is to throw some light on common misconceptions about the expert’s role in decision making. Various ill-conceived perceptions and stereotypes are organised in a set of widespread myths or misconceptions which the paper attempts to debunk in a neutral and objective manner. Certain types of flawed behaviour of individuals and organisations that portray themselves as decision making support experts, are also identified. They are categorised into a set of negative stereotypes that should raise red flags in dealing with such experts. The analysis of shortcomings, flaws, and misconceptions presented in this paper carries with it the benefit of providing solutions for a stronger and improved practice of risk-informed decision making.
- 2 January 2019
- Published by Taylor & Francis in Civil Engineering and Environmental Systems
- Vol. 36 (1) , 73-82
Misconceptions and stereotypes regarding experts providing support for risk-informed decision making
Support for high-level technical and environmental risk assessment and for large-scale decision making in general is typically provided by qualified experts. Often praised, but also reviled and blamed, the expert dwells in a cocoon of models and expertise and is armed with algorithms, regulations, and technical procedures to justify the support provided. At the end of the day experts often find themselves in sensitive and confrontational situations, as communication about highly uncertain issues is inherently ‘risky’. The objective of this paper is to throw some light on common misconceptions about the expert’s role in decision making. Various ill-conceived perceptions and stereotypes are organised in a set of widespread myths or misconceptions which the paper attempts to debunk in a neutral and objective manner. Certain types of flawed behaviour of individuals and organisations that portray themselves as decision making support experts, are also identified. They are categorised into a set of negative stereotypes that should raise red flags in dealing with such experts. The analysis of shortcomings, flaws, and misconceptions presented in this paper carries with it the benefit of providing solutions for a stronger and improved practice of risk-informed decision making.
- 17 November 2016
- Published by Springer Nature
- p. 15-30
Freak Events, Black Swans, and Unknowable Unknowns: Impact on Risk-Based Design
- 17 November 2016
- Published by Springer Nature
- p. 15-30
Freak Events, Black Swans, and Unknowable Unknowns: Impact on Risk-Based Design
- 1 June 2013
- Published by Taylor & Francis in Civil Engineering and Environmental Systems
- Vol. 30 (2) , 162-172
Sequential selection of an optimal operating window
An important issue in construction, repair, maintenance, and testing is the ability to select an optimal window of opportunity within a short-term period of time. This optimal window is typically governed by external variables, such as weather, or affected by operational conditions. Therefore, a decision-maker faces sequential decisions to ‘start’ or to wait for ‘better’ conditions. We examine how this problem is best formulated, which optimisation criteria make sense from an engineering point of view, which kind of ‘stopping’ rules can be used, and which stochastic solutions or solution methods are known and/or available. We also discuss how discounting affects the decision-making and its outcome, as in many practical situations ‘waiting’ comes with an expensive price tag. The effect on the outcome of the selection process of assuming a simple dependence structure between the opportunities is also assessed. To illustrate the various formulations of this problem, we contrast different criteria and decision rules, assuming different scenarios.
- 1 June 2013
- Published by Taylor & Francis in Civil Engineering and Environmental Systems
- Vol. 30 (2) , 162-172
Sequential selection of an optimal operating window
An important issue in construction, repair, maintenance, and testing is the ability to select an optimal window of opportunity within a short-term period of time. This optimal window is typically governed by external variables, such as weather, or affected by operational conditions. Therefore, a decision-maker faces sequential decisions to ‘start’ or to wait for ‘better’ conditions. We examine how this problem is best formulated, which optimisation criteria make sense from an engineering point of view, which kind of ‘stopping’ rules can be used, and which stochastic solutions or solution methods are known and/or available. We also discuss how discounting affects the decision-making and its outcome, as in many practical situations ‘waiting’ comes with an expensive price tag. The effect on the outcome of the selection process of assuming a simple dependence structure between the opportunities is also assessed. To illustrate the various formulations of this problem, we contrast different criteria and decision rules, assuming different scenarios.
- 24 April 2013
- Published by Taylor & Francis in Civil Engineering and Environmental Systems
- Vol. 30 (2) , 85-86
Special issue: papers selected from the Sixth International Forum on Engineering Decision Making (IFED)
- 24 April 2013
- Published by Taylor & Francis in Civil Engineering and Environmental Systems
- Vol. 30 (2) , 85-86
Special issue: papers selected from the Sixth International Forum on Engineering Decision Making (IFED)
- 1 January 2013
- Published by Springer Nature
- p. 149-159
Enhanced Monte Carlo for Reliability-Based Design and Calibration
- 1 January 2013
- Published by Springer Nature
- p. 149-159
Enhanced Monte Carlo for Reliability-Based Design and Calibration
- 1 January 2009
- Published by Taylor & Francis in Australian Journal of Structural Engineering
- Vol. 9 (1) , 45-54
Spatial Hazard Rate Modelling Using Hierarchical Bayes Methods
Risk mitigation and accident prevention within a spatially distributed system require a good handle on the spatial distribution of accident rates and fatality rates. This is helpful in optimising and prioritising decisions with respect to the design, maintenance and risk management of new and existing infrastructure. Hierarchical Bayes methods of analysis are used (i) to correlate accident fatalities and damages to site-specific indicators (in the case of a road network they include traffic density, speed limit and other indicators); and (ii) to perform a spatial analysis of hazard rates. The (unknown) random field of accident fatality rates is estimated and/or other accident- related hazard rates based on detailed accident reports of events spread randomly throughout the system are considered. To demonstrate the method of analysis, accident data from the national road and traffic data bank for the southern region of Norway are matched to an existing geographical database containing spatial information regarding possible causal factors.
- 1 January 2009
- Published by Taylor & Francis in Australian Journal of Structural Engineering
- Vol. 9 (1) , 45-54
Spatial Hazard Rate Modelling Using Hierarchical Bayes Methods
Risk mitigation and accident prevention within a spatially distributed system require a good handle on the spatial distribution of accident rates and fatality rates. This is helpful in optimising and prioritising decisions with respect to the design, maintenance and risk management of new and existing infrastructure. Hierarchical Bayes methods of analysis are used (i) to correlate accident fatalities and damages to site-specific indicators (in the case of a road network they include traffic density, speed limit and other indicators); and (ii) to perform a spatial analysis of hazard rates. The (unknown) random field of accident fatality rates is estimated and/or other accident- related hazard rates based on detailed accident reports of events spread randomly throughout the system are considered. To demonstrate the method of analysis, accident data from the national road and traffic data bank for the southern region of Norway are matched to an existing geographical database containing spatial information regarding possible causal factors.
- 14 October 2008
- Published by American Society of Civil Engineers (ASCE)
- p. 1-10
Evaluation of Temperature Data of Confederation Bridge: Thermal Loading and Movement at Expansion Joint
Examination of the critical observed temperature profiles will lead to the following conclusions: 1 Thick bottom slabs in deep sections (Sections 1 and 2) lead to lower than predicted temperatures and significant tensile stresses in these slabs. 2 The difference in temperature between the two webs of box girders are the source of a horizontal thermal gradient in deep box girder sections (Sections 1 and 2). For shallower section (Section 3), this was not observed. 3 The effect of horizontal temperature gradient cannot be ignored for deep sections when calculating continuity stresses. For shallow section this can be ignored. 4 The maximum seasonal displacement the bridge experienced during the 3-year period was found to be 226 mm. The Canadian standard CSA-S6-00 gives a good estimate for maximum temperature but seriously underestimates minimum temperature and differential temperature, for deep sections. Also, the code lacks guidance regarding design values for horizontal differential temperature.
- 14 October 2008
- Published by American Society of Civil Engineers (ASCE)
- p. 1-10
Evaluation of Temperature Data of Confederation Bridge: Thermal Loading and Movement at Expansion Joint
Examination of the critical observed temperature profiles will lead to the following conclusions: 1 Thick bottom slabs in deep sections (Sections 1 and 2) lead to lower than predicted temperatures and significant tensile stresses in these slabs. 2 The difference in temperature between the two webs of box girders are the source of a horizontal thermal gradient in deep box girder sections (Sections 1 and 2). For shallower section (Section 3), this was not observed. 3 The effect of horizontal temperature gradient cannot be ignored for deep sections when calculating continuity stresses. For shallow section this can be ignored. 4 The maximum seasonal displacement the bridge experienced during the 3-year period was found to be 226 mm. The Canadian standard CSA-S6-00 gives a good estimate for maximum temperature but seriously underestimates minimum temperature and differential temperature, for deep sections. Also, the code lacks guidance regarding design values for horizontal differential temperature.
- 1 June 2007
- Published by Taylor & Francis in Civil Engineering and Environmental Systems
- Vol. 24 (2) , 123-137
A comparison of one-stage and two-stage Bayesian processes in engineering decision-making
Engineering decision-making problems often involve conditions that vary spatially either in a continuous way or from element to element. In such cases, the use of two-stage Bayesian models is often advisable in design optimization, maintenance and inspection planning. Two-stage models are based on a ‘state’ or ‘condition’ variable vector that is assumed to be conditionally independent with a pdf given a set of ‘hyper-parameters’. All other process parameters and responses are conditional on this state variable vector. Such models can be applied to a large variety of problems where data from various systems or sources need to be spatially ‘mixed’, such as in deteriorating infrastructure, spatial aspects of corrosion, preference and consequence modeling, and system failure models for large industrial plants. The models are described in detail and an extension is given that allows for the spatial correlation of the individual ‘states’ given the hyper-parameters.
- 1 June 2007
- Published by Taylor & Francis in Civil Engineering and Environmental Systems
- Vol. 24 (2) , 123-137
A comparison of one-stage and two-stage Bayesian processes in engineering decision-making
Engineering decision-making problems often involve conditions that vary spatially either in a continuous way or from element to element. In such cases, the use of two-stage Bayesian models is often advisable in design optimization, maintenance and inspection planning. Two-stage models are based on a ‘state’ or ‘condition’ variable vector that is assumed to be conditionally independent with a pdf given a set of ‘hyper-parameters’. All other process parameters and responses are conditional on this state variable vector. Such models can be applied to a large variety of problems where data from various systems or sources need to be spatially ‘mixed’, such as in deteriorating infrastructure, spatial aspects of corrosion, preference and consequence modeling, and system failure models for large industrial plants. The models are described in detail and an extension is given that allows for the spatial correlation of the individual ‘states’ given the hyper-parameters.
- 1 June 2007
- Published by Taylor & Francis in Civil Engineering and Environmental Systems
- Vol. 24 (2) , 71-72
Editorial
- 1 June 2007
- Published by Taylor & Francis in Civil Engineering and Environmental Systems
- Vol. 24 (2) , 71-72
Editorial