WTWilson H. Tang

Wilson H. Tang

*This is an algorithmically generated author record based on publicly available information.

Current Organizations / Institutes

The organizations/institutes from the scholar's latest article


Wilson H. Tang has a total of 13 co-authors. Here are the top co-authors by number of shared publications:


Latest Publications

  • Reliability-Based Optimization of Geotechnical Systems

    by J. Zhang, L. M. Zhang, Wilson H. Tang

    Reliability-based optimization (RBO) intends to minimize the cost involved in a design while satisfying all technical requirements specified by using reliability theory. Although this idea is attractive, its implementation is generally difficult because an accurate evaluation of the reliability constraints is often computationally prohibitive when it is coupled with the minimization of a cost function. This paper suggests an indirect method for RBO of geotechnical systems initially on the basis of the mean first-order reliability method (MFORM). Because reliability analysis with MFORM is very efficient, the computational work involved in RBO is greatly reduced. The major concern about MFORM is that it is not an accurate reliability method. A reliability index mapping function was used to relate the reliability index calculated by MFORM to that calculated by a more accurate method. When the mapping function perfectly reflects the relationship between MFORM reliability index and that from an accurate reliab...


  • Slope Reliability Analysis Considering Site-Specific Performance Information

    by J. Zhang, L. M. Zhang, Wilson H. Tang

    The performance of a slope, such as surviving a certain groundwater condition, can be viewed as the outcome of a full-scale test performed directly on the slope and may provide valuable information for safety assessment, upgrading analysis, and repair design of the slope. Performance information can be divided into two types: (1) the slope survived a certain state, and (2) the slope failed at a certain state. This paper illustrates two methods for slope reliability analysis considering site-specific performance information, i.e., an indirect method based on back-analysis of the performance information, and a direct method, in which the back-analysis procedure is bypassed. The two methods are theoretically the same but different in implementation details. As examples, an existing slope for safety assessment and a failed slope to be repaired are studied in this paper. Considering the past survival information increases the reliability of the slope. The increase in reliability is larger if the slope survives...


  • Expected Design Factor of Safety from a Pile Load Test Program

    by J. Zhang, L. M. Zhang, Wilson H. Tang

    Load tests are often carried out to verify design assumptions and to reduce the design factor of safety (FOS). In this paper, a method based on Bayesian preposterior analysis is suggested to evaluate the expected design FOS when a load test program is planned but not yet implemented. Two algorithms, i.e., Monte Carlo simulation (MCS) and a mean first order method (MFOM) are employed to calculate the expected design FOS. The accuracy of Monte Carlo simulation can be sufficiently accurate when enough samples are drawn. MFOM slightly underestimates the expected design FOS and it becomes more accurate as the number of piles in a test program increases. Results in this study reveal that the inherent variability within a site controls the amount of uncertainty that can be reduced by pile load tests, and that a few tests are often sufficient to remove the majority of uncertainty caused by cross-site variability. If a given number of piles are to be tested, the expected design FOS increases almost linearly with the target reliability index.


  • Efficient Probabilistic Back-Analysis of Slope Stability Model Parameters

    by J. Zhang, Wilson H. Tang, L. M. Zhang

    Back-analysis of slope failure is often performed to improve one’s knowledge on parameters of a slope stability analysis model. In a failed slope, the slip surface may pass through several layers of soil. Therefore, several sets of model parameters need to be back-analyzed. To back-analyze multiple sets of slope stability parameters simultaneously under uncertainty, the back-analysis can be implemented in a probabilistic way, in which uncertain parameters are modeled as random variables, and their distributions are improved based on the observed slope failure information. In this paper, two methods are presented for probabilistic back-analysis of slope failure. For a general slope stability model, its uncertain parameters can be back-analyzed with an optimization procedure that can be implemented in a spreadsheet. When the slope stability model is approximately linear, its parameters can be back-analyzed with sensitivity analysis instead. A feature of these two methods is that they are easy to apply. Two ...


  • Bayesian Framework for Characterizing Geotechnical Model Uncertainty

    by J. Zhang, L. M. Zhang, Wilson H. Tang

    As any model is only an abstraction of the real world, model uncertainty always exists. The magnitude of model uncertainty is important for geotechnical decision making. If model uncertainty is not considered, the geotechnical predictions and hence the decisions based on the geotechnical predictions might be biased. In this study, a framework for characterizing geotechnical model uncertainty using observation data is proposed. The framework is based on the concept of multivariable Bayesian updating, in which the statistics of model uncertainty are updated using observed performance data. Uncertainties in both input parameters and observed data can be considered in the proposed framework. To bypass complex computational works involved in the proposed framework, a practical approximate solution is presented. The proposed framework is illustrated by characterizing the model uncertainty of four limit equilibrium methods for slope stability analysis using quality centrifuge test data. Parametric study in the i...


  • Uncertainties of Field Pullout Resistance of Soil Nails

    by L. L. Zhang, L. M. Zhang, W. H. Tang

    A large number of field pullout tests on soil nails have been carried out to provide valuable information for enhancing the understanding of pullout resistance of soil-grout interface and for reliability evaluation of soil-nailed slopes. In this paper, a data set of 167 field pullout tests performed in 23 nailed completely decomposed granite cut slopes is used for a statistical evaluation of four factors influencing the pullout resistance of soil nails, namely overburden pressure, grout length, soil suction, and soil dilatancy. For the tests in which nails were pulled out, the measured pullout resistance is essentially independent of the effective overburden pressure. A bias factor r* is defined as the ratio of the measured pullout resistance and the calculated value using a design equation. The mean value of r* is 4.30 and the coefficient of variation is 47%. When the uncertainties in grout length, soil suctions around nails, and the soil shear dilatancy are considered, the mean value of r* can finally b...


  • Study of time-dependent reliability of old man-made slopes considering model uncertainty

    by J. Zhang, W.H. Tang

    After slopes are built, one important question arising is: how might the safety condition of the slopes change with time? In this paper, the potential change in slope reliability with age is analysed based on time to failure analysis for a large number of old slopes in Hong Kong. Model selection results show that there is no clear choice of the best model to describe the trend of the hazard rate. A model average method is therefore used to combine prediction from different models. Based on the proposed procedure, it is noticed that under small and medium rainfall intensities, the slopes did not show apparent signs of decreasing reliability with age. The effect of proof loading under these storms would help compensate for the effect of minor deterioration. When subject to large intensity storms, slopes showed clear signs of increasing rate of failure with age even though they had survived storms of that intensity for years. Nevertheless, as large intensity rainfall is less frequent, the contribution from large rainfall to the total hazard rate is not major. After considering the likelihood of each type of rainfall intensity and slope management, the total hazard rate of old slopes studied does not exhibit an obvious trend with age.


  • Top Cited Papers

    Efficient Spreadsheet Algorithm for First-Order Reliability Method

    by B. K. Low, Wilson H. Tang

    A new spreadsheet-cell-object-oriented algorithm for the first-order reliability method is proposed and illustrated for cases with correlated nonnormals and explicit and implicit performance functions. The new approach differs from the writers earlier algorithm by obviating the need for computations of equivalent normal means and equivalent normal standard deviations. It obtains the solution faster and is more efficient, robust, and succinct. Other advantages include ease of initialization prior to constrained optimization, ease of randomization of initial values for checking robustness, and fewer required optimization constraints during spreadsheet-automated search for the design point. Two cases with implicit performance functions, namely an asymmetrically loaded beam on Winkler medium and a strut with complex supports are analyzed using the new approach and discussed. Comparisons are also made between the proposed approach and that based on Rosenblatt transformation.


  • A Probabilistic Model for Liquefaction Triggering Analysis Using SPT

    by S. Y. Fang, C. H. Juang, W. H. Tang

    The liquefaction resistance model developed by Cetin et al. (2004) along with a reference seismic loading model forms a performance function or limit state for liquefaction triggering analysis. Within the framework of the first order reliability method (FORM), the uncertainty of this limit state model is characterized through an extensive series of sensitivity studies using Bayesian mapping functions that were calibrated with a set of quality case histories. With the known model and parameter uncertainties, the probability of liquefaction of a future case can be fairly accurately predicted using the FORM analysis. A procedure is developed to assess the uncertainty associated with the Bayesian mapping function, which was due to use of limited observed data in the development. The effect of this uncertainty on the final assessment of model uncertainty is evaluated, and the variation in the final notional probability obtained from the FORM analysis estimated.