CCChen-Yu Chang

Chen-Yu Chang

*This is an algorithmically generated author record based on publicly available information.

Current Organizations / Institutes

The organizations/institutes from the scholar's latest article

Previous Organizations / Institutes

The organizations / institutes from the scholar's other articles in the past ten years


Chen-Yu Chang has a total of 5 co-authors. Here are the top co-authors by number of shared publications:

  • Graham Ive

    Bartlett School of Graduate Studies , University College London , UK

    3 shared publications
  • Jia-Wen Ko

    Master Student, Bartlett School of Construction and Project Management, Univ. College London, 1-19 Torrington Place, London WC1E 7HB, U.K.

    1 shared publication
  • Robert Howard

    Ph.D. Candidate, Bartlett School of Construction and Project Management, Univ. College London, 1-19 Torrington Place, London WC1E 7HB, U.K.

    1 shared publication
  • Shi Chen

    Financial Analyst, China Life Wealth Management Company Limited, 17 F China Life Center, No. 17 Financial St., Xicheng District, Beijing 1000033, China

    1 shared publication
  • Weijia Pan

    Master Student, Bartlett School of Construction and Project Management, Univ. College London, 1-19 Torrington Place, London WC1E 7HB, U.K.

    1 shared publication

Latest Publications

  • Impact of Building Information Modeling Implementation on the Acceptance of Integrated Delivery Systems: Structural Equation Modeling Analysis

    by Chen-Yu Chang, Weijia Pan, Robert Howard

    In recent years, building information modeling (BIM) has been increasingly employed by the architecture, engineering and construction industry worldwide as a result of digital government initiatives. In spite of some promising early evidence on the benefits of BIM, the momentum of this top-down drive should build upon after-implementation empirical evidence. Through the structural equation modeling analysis of survey returns from 145 Chinese BIM-enabled projects, this research demonstrates that BIM’s degree of implementation can positively affect the acceptability of integrated project delivery (IPD) in the future via increased perception of the need for supply chain incentivization and improved communication quality enabled by BIM. Rolling out BIM on a wider scale may yield an additional benefit in lowering the barrier to the implementation of IPD systems. This finding can serve as evidential support for government mandates that require the compulsory adoption of BIM in public projects.


  • New Approach to Estimating the Standard Deviations of Lognormal Cost Variables in the Monte Carlo Analysis of Construction Risks

    by Chen-Yu Chang, Jia-Wen Ko

    If soundly conducted, risk assessment could yield considerable savings for project investors. Monte Carlo simulation (MCS) has been widely embraced by risk management guides as an instrumental tool for this purpose. This research aims to develop a new method to improve the rigor of MCS by establishing the link between parameter estimation and assessment of individual risk sources. The method is validated by virtue of its predictive power for the likelihood of a project being successful in securing investors. Eight Taiwanese sewerage build-operate-transfer projects are investigated. Compared with the discounted cash flow approach, this new method can provide a more accurate prediction using the expert’s assessment as input of financial impact and occurrence likelihood of individual risks. This finding furnishes solid empirical evidence for the value MCS might add to project appraisal.


  • Transitional Public–Private Partnership Model in China: Contracting with Little Recourse to Contracts

    by Chen-Yu Chang, Shi Chen

    Since 2013, the Chinese government has attempted to make a transition from user-pay public-private partnership (PPP) to government-pay PPP systems with the aim of facilitating infrastructure investment and government transformation. Whereas the application of government-pay PPP systems can considerably expand the areas where PPPs are suitable, the lengthy procurement time experienced in the implementation of similar systems [e.g., private finance initiative (PFI)] presents a tough challenge to Chinese procuring authorities who are under increasing pressure to get the earmarked PPP projects off the ground swiftly in order to stem the downward pressure in the economy. The first PFI-like project in China, the Anqing Urban Road PPP project, has been successfully tendered in May 2015 with an impressive record on procurement time. Through the scrutiny of this project, it is found that speedy procurement is achieved by leaving some of the major risks ill-defined and vaguely allocated in the tender docume...


  • When might a project company break up? The perspective of risk-bearing capacity

    by Chen-Yu Chang

    Public-private partnerships (PPPs) have developed into a mainstream alternative procurement solution for the provision of public services. The aim is to explore a crucial but hitherto ignored issue in the study of PPPs: at what point a project company might break up. The project company’s two-stage break-up in the National Physical Laboratory PFI project inspired this research in which a formal model is developed to demonstrate that contract break-up decisions can be plausibly explained through quasi-rent changes. This finding brings to the foreground the importance of taking into account risk-bearing capability in the design of project governance. How to achieve a level of risk-bearing capacity through the optimal use of financial, organizational and contractual means is a research area worthy of future exploration.


  • Flood HazardsJessica Lamond, Colin Booth, Felix Hammond and David Proverbs (eds), CRC Press, London, 2011 387 pp, ISBN 978 1 4398262 5 6, £82.00 (hb)

    by Chen-Yu Chang

    (2013). Flood Hazards Jessica Lamond, Colin Booth, Felix Hammond and David Proverbs (eds), CRC Press, London, 2011 387 pp, ISBN 978 1 4398262 5 6, £82.00 (hb) Construction Management and Economics: Vol. 31, No. 3, pp. 291-296.


  • A critical review of the application of TCE in the interpretation of risk allocation in PPP contracts

    by Chen-Yu Chang

    Along with the rise of public–private partnerships (PPPs) as a mainstream procurement system, we have seen a growing interest in studies of risk allocation in these projects. One of the serious academic endeavours is to apply both transaction cost economics (TCE) and the resource-based view (RBV) to explain risk allocation patterns found in PPP projects. The existing literature along these lines is deficient in three aspects: inappropriate choice of unit of analysis; poor specification of governance structure; and misinterpretation of asset specificity. A way for improvement is to analyse risk allocation in the context of PPP procurement in its entirety.


  • How Far a Contract Can Be Stretched? The First Building Block for Procurement Engineering

    by Chen-Yu Chang

    This research is a first attempt to develop the new research field of Procurement Engineering. Just as Earthquake Engineering can instruct us how to design a building in order to mitigate the damages caused by natural uncertainty, Procurement Engineering hopes to offer methods to design project governance in order to reduce the adverse impacts of risk on projects. Just as Earthquake Engineering is founded on the basic law of mechanics that can precisely describe the movement of structural components under different loading conditions, Procurement Engineering needs to develop a fundamental law that governs the interaction between the procurer and the contractor in the face of uncertainty. This research aims to answer this call by first defining the risk-bearing capability of project governance, and second developing a mathematical equation for its measurement. The formal modeling of this concept can inform the design of project governance by integrating contract form, payment mechanism, financing structure of the contractor and choice of procurement systems into a logical coherent framework.

  • Reversal of bargaining power in construction projects: meaning, existence and implications

    by Chen‐Yu Chang, Graham Ive

    Reversal of bargaining power arising from asset specificity is important for the understanding of hold‐up problems. Various types of asset specificity have been identified in different transaction contexts, but a previously unidentified or unnamed type is developed here: process specificity. Numerous widely used financial and contractual preventive measures in construction practice can be justified as responses to this problem of process specificity. These include bonds and retentions. However, these measures have limitations. Specifically, the client‐led change orders cannot be completely averted and when they occur, the pricing of additional work largely relies on negotiation, implying that bargaining power determines the result. Consequently, the hold‐up problem remains a managerial issue. To mitigate this problem, clients should choose a procurement system by aligning project attributes with the procurement system characteristics.


  • The principle of inconsistent trinity in the selection of procurement systems

    by Graham Ive, Chen‐Yu Chang

    This paper examines the economic characteristics of construction procurement systems partially in terms of transaction cost economics and partly those of project management. It proposes the theoretical principle of an inconsistent trinity, according to which, in selecting a procurement system, the client will inevitably face a trade‐off between the procurement system best able to deliver: (1) fastest completion of the project (and therefore higher discounted present value of revenue from the project); (2) least vulnerability when making changes (lower transaction hold‐up costs arising from temporal or process specificity); as well as (3) least vulnerability to non‐performance (lower transaction measurement costs from greater visibility to third parties for ordering of disputes). The model provides a potentially testable contribution to a transaction cost theory of construction procurement. It also has two implications: (1) the three main family types of procurement systems are held to be intrinsically different in economic terms, so selection of procurement system does matter; (2) no system can enjoy absolute advantage over others, so the proposed strategy of procurement system selection is to align the characteristics of procurement systems with attributes of projects.


  • The determinants of the vertical boundaries of the construction firm: comment

    by Chen‐Yu Chang

    In recent years, the study of organizational issues has made a tremendous progress owing to the development of two powerful analytical theories – transaction cost economics (TCE) and the resource‐based view (RBV). Both approaches have their strengths and limitations and thus researchers might think that synthesizing would be a way forward, Bridge and Tisdell ( 2004 Bridge, A. J. and Tisdell, C. 2004. The determinants of the vertical boundaries of the construction firm.. Construction Management and Economics, 22: 807–25. [Taylor & Francis Online] [Google Scholar] ) being a case. In synthesizing TCE and RBV, several problems need to be overcome. First, there is a fundamental disparity in the basic assumption of rationality adopted by transaction cost economics (TCE) and. second, even after being operationalized for discovering the key determinants of the concept of competence, it still cannot escape the charge of tautology. Last, the inclusion of competence/resource and TCE‐related variables may increase predictive power, but the potentially high correlation between asset specificity and rarity, as well as costliness to imitate, are likely to cause the multicollinearity problem that may reduce the reliability of estimators and hence disguise the true effect of each variable on construction contracting. Even if the critiques of tautology and multicollinearity can be technically overcome, ontological tension will remain.