Celso K. Morooka
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Research Subjects
Celso K. Morooka has a total of 3 co-authors. Here are the top co-authors by number of shared publications:
Raphael I. Tsukada
University of Campinas
3 shared publications- Marcio Yamamoto
National Maritime Research Institute, Tokyo 181-0004, Japan
2 shared publications Seiya Ueno
Yokohama National University, Yokohama, Japan
1 shared publication
Latest Publications
- 1 December 2013
- Published by Springer Nature in Marine Systems & Ocean Technology
- Vol. 8 (2) , 79-85
Computational simulation of the behavior of a drilling riser system in ultra deep water
- 1 December 2013
- Published by Springer Nature in Marine Systems & Ocean Technology
- Vol. 8 (2) , 79-85
Computational simulation of the behavior of a drilling riser system in ultra deep water
- 1 June 2013
- Published by Springer Nature in Marine Systems & Ocean Technology
- Vol. 8 (1) , 39-46
Prospecting experimental data of VIV to estimate dynamic behavior of a subsea pipeline with free span
- 1 June 2013
- Published by Springer Nature in Marine Systems & Ocean Technology
- Vol. 8 (1) , 39-46
Prospecting experimental data of VIV to estimate dynamic behavior of a subsea pipeline with free span
- 1 June 2011
- Published by Springer Nature in Marine Systems & Ocean Technology
- Vol. 6 (1) , 17-26
Dynamic behavior of pipelines and risers due to vortex-induced vibration in time domain
- 1 June 2011
- Published by Springer Nature in Marine Systems & Ocean Technology
- Vol. 6 (1) , 17-26
Dynamic behavior of pipelines and risers due to vortex-induced vibration in time domain
- 1 January 2007
- Published by ASME International
- p. 239-248
Dynamic Behavior of a Semi-Submersible Platform Coupled With Drilling Riser During Re-Entry Operation in Ultra-Deep Water
The present study deals with the dynamics of a semi-submersible platform coupled with a free-hanging vertical rigid riser during the re-entry operation in ultra-deep water. The reentry operation occurs after the drilling phases are accomplished which only use the bare drillstring. The re-entry operation entails positioning the subsurface Blow-Out-Preventer (BOP) above the wellhead and installing it to the wellhead. During this operation, the BOP is suspended by the drilling riser. The placement and installation is time consuming and requires a great amount of accuracy. One challenge is the effects of platform motions on the installation procedure. The present work was carried out with the aim to understand the influence of platform motions during the re-entry operation in ultra-deep waters. Another benefit of this study is the knowledge of the effect of platform motions on the drilling riser and BOP which leads to the possibility of drilling more than one well without the need to raise the BOP to the surface. This could greatly reduce the amount of time needed to drill subsurface wells which in turn, reduces overall operational costs. A numerical simulation in time domain has been carried out using a non-linear model for the platform dynamics. The dynamics of a free hanging drilling riser and a dynamic positioning system (DPS) of the semi-submersible platform are included in the numerical model. Simulation results in time domain of the platform displacements with DPS and riser displacement are shown. A discussion of riser displacement and DPS control is also included.
- 1 January 2007
- Published by ASME International
- p. 239-248
Dynamic Behavior of a Semi-Submersible Platform Coupled With Drilling Riser During Re-Entry Operation in Ultra-Deep Water
The present study deals with the dynamics of a semi-submersible platform coupled with a free-hanging vertical rigid riser during the re-entry operation in ultra-deep water. The reentry operation occurs after the drilling phases are accomplished which only use the bare drillstring. The re-entry operation entails positioning the subsurface Blow-Out-Preventer (BOP) above the wellhead and installing it to the wellhead. During this operation, the BOP is suspended by the drilling riser. The placement and installation is time consuming and requires a great amount of accuracy. One challenge is the effects of platform motions on the installation procedure. The present work was carried out with the aim to understand the influence of platform motions during the re-entry operation in ultra-deep waters. Another benefit of this study is the knowledge of the effect of platform motions on the drilling riser and BOP which leads to the possibility of drilling more than one well without the need to raise the BOP to the surface. This could greatly reduce the amount of time needed to drill subsurface wells which in turn, reduces overall operational costs. A numerical simulation in time domain has been carried out using a non-linear model for the platform dynamics. The dynamics of a free hanging drilling riser and a dynamic positioning system (DPS) of the semi-submersible platform are included in the numerical model. Simulation results in time domain of the platform displacements with DPS and riser displacement are shown. A discussion of riser displacement and DPS control is also included.
- Open Access
- 1 December 2005
- Published by Springer Nature in Journal of the Brazilian Society of Mechanical Sciences and Engineering
- Vol. 27 (4) , 449-455
Dynamic positioning system of semi-submersible platform using fuzzy control
- 1 December 2005
- Published by Springer Nature in Journal of the Brazilian Society of Mechanical Sciences and Engineering
- Vol. 27 (4) , 449-455
Open AccessDynamic positioning system of semi-submersible platform using fuzzy control