Seyed Meysam Mousavi
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Previous Organizations / Institutes
The organizations / institutes from the scholar's other articles in the past ten years
Seyed Meysam Mousavi has a total of 11 co-authors. Here are the top co-authors by number of shared publications:
A. Birjandi
1 shared publicationB. Vahdani
1 shared publicationBehnam Vahdani
Faculty of Industrial and Mechanical Engineering, Qazvin Branch, Islamic Azad University, Qazvin, Iran
1 shared publicationE. Teimoury
Department of Industrial Engineering University of Science and Technology Tehran Iran Iran
1 shared publicationH. Gitinavard
Department of Industrial Engineering University of Science and Technology Tehran Iran Iran
1 shared publication- Hassan Hashemi
Regional Centre on Urban Water Management (RCUWM-Tehran), under the auspices of UNESCO, Tehran, Iran
1 shared publication
Latest Publications
- 25 January 2021
- Published by SCI AND TECH UNIVERSAL INC in Scientia Iranica
- Vol. 30 (1) , 260-272
Group decision making by a last aggregation approach under interval-valued Pythagorean fuzzy environment for sustainable project decision
Interval-valued Pythagorean fuzzy sets (IVPFSs) as enhanced type of Pythagorean fuzzy sets (PFSs) improve the expression of the degrees of membership, non-membership and hesitancy in comparison with intuitionistic fuzzy sets (IFSs). In this paper, to use the advantages of IVPFSs a new group decision-making method is introduced based on linear assignment method (LAM). In this approach, subjective and objective weights of criteria are taken into account. Moreover, the method applies a new ranking method for IVPFSs. To avoid the shortcomings of first aggregation methods, the introduced decision-making approach involves a last aggregation approach. Finally, the method is used in a case study of sustainable project evaluation in order to depict the applicability of this method.
- 25 January 2021
- Published by SCI AND TECH UNIVERSAL INC in Scientia Iranica
- Vol. 30 (1) , 260-272
Group decision making by a last aggregation approach under interval-valued Pythagorean fuzzy environment for sustainable project decision
Interval-valued Pythagorean fuzzy sets (IVPFSs) as enhanced type of Pythagorean fuzzy sets (PFSs) improve the expression of the degrees of membership, non-membership and hesitancy in comparison with intuitionistic fuzzy sets (IFSs). In this paper, to use the advantages of IVPFSs a new group decision-making method is introduced based on linear assignment method (LAM). In this approach, subjective and objective weights of criteria are taken into account. Moreover, the method applies a new ranking method for IVPFSs. To avoid the shortcomings of first aggregation methods, the introduced decision-making approach involves a last aggregation approach. Finally, the method is used in a case study of sustainable project evaluation in order to depict the applicability of this method.
- Open Access
- 1 June 2020
- Vol. 31 (2) , 231-242
An Integrated Perishable Inventory Routing Problem with Consistent Driver Services and Deliver Fresh Products using Possibility and Necessity Measures
- 1 June 2020
- Vol. 31 (2) , 231-242
Open AccessAn Integrated Perishable Inventory Routing Problem with Consistent Driver Services and Deliver Fresh Products using Possibility and Necessity Measures
- Open Access
- 17 February 2019
- Published by SCI AND TECH UNIVERSAL INC in Scientia Iranica
- Vol. 27 (5) , 2572-2591
Designing a resource-constrained project scheduling model considering multiple routes for flexible project activities: meta-heuristic algorithms
Resource constrained project scheduling problem with multiple routes for flexible project activities (RCPSP-MR) is a generalization of the RCPSP, in which for the implementation of each flexible activity in main structure of the project, several exclusive sub-networks are considered. Each sub-network is regarded as a route for the flexible activity. The routes are considered for each flexible activity that are varied in terms of: 1) Number of activities required to execute; 2) Precedence relationship between activates; 3) Allocation of different renewable and nonrenewable resources to each activity; and 4) Effectiveness on the duration and cost of project completion. In this paper, a new mathematical formulation of RCPSP-MR is firstly presented. Then, two solving approaches based on particle swarm optimization (PSO) and genetic algorithm (GA) are proposed to minimize costs of project completion. To evaluate the effectiveness of these proposed approaches, 50 problems (in very small, small, medium, and large-sized test problems) are designed and then are solved; Finally, comparisons are provided. Computational results show that the proposed GA generates high-quality solutions in a timely fashion.
- 17 February 2019
- Published by SCI AND TECH UNIVERSAL INC in Scientia Iranica
- Vol. 27 (5) , 2572-2591
Open AccessDesigning a resource-constrained project scheduling model considering multiple routes for flexible project activities: meta-heuristic algorithms
Resource constrained project scheduling problem with multiple routes for flexible project activities (RCPSP-MR) is a generalization of the RCPSP, in which for the implementation of each flexible activity in main structure of the project, several exclusive sub-networks are considered. Each sub-network is regarded as a route for the flexible activity. The routes are considered for each flexible activity that are varied in terms of: 1) Number of activities required to execute; 2) Precedence relationship between activates; 3) Allocation of different renewable and nonrenewable resources to each activity; and 4) Effectiveness on the duration and cost of project completion. In this paper, a new mathematical formulation of RCPSP-MR is firstly presented. Then, two solving approaches based on particle swarm optimization (PSO) and genetic algorithm (GA) are proposed to minimize costs of project completion. To evaluate the effectiveness of these proposed approaches, 50 problems (in very small, small, medium, and large-sized test problems) are designed and then are solved; Finally, comparisons are provided. Computational results show that the proposed GA generates high-quality solutions in a timely fashion.
- 1 September 2016
- Vol. 50 (2) , 327-340
Sustainable Construction Project Portfolio Selection under Interval- Valued Type-2 Fuzzy Sets
- 1 September 2016
- Vol. 50 (2) , 327-340
Sustainable Construction Project Portfolio Selection under Interval- Valued Type-2 Fuzzy Sets
- Open Access
- 1 January 2014
- Published by ISPACS GmbH in Advanced Computational Techniques in Electromagnetics
- Vol. 2014, 1-10
An application of SODA methodology in student accommodation problems
The one of the main problems that students have faced with are the accommodation problems. In this paper, we review problems that may occur in university systems. Also, we use strategic options development and analysis method (SODA) to represent the accommodation problems and to create an agreement between student and staff. This method can help us with achieving goals; because in the same situation, there are different viewpoints for various reasons. By plotting the cognitive maps of involved persons and aggregating all cognitive maps, this methodology reaches us to a consensus. The aggregated cognitive maps are called strategic maps. Finally, with the relational clustering the strategic map, we offer some suggestions to improve the accommodation system in each university.
- 1 January 2014
- Published by ISPACS GmbH in Advanced Computational Techniques in Electromagnetics
- Vol. 2014, 1-10
Open AccessAn application of SODA methodology in student accommodation problems
The one of the main problems that students have faced with are the accommodation problems. In this paper, we review problems that may occur in university systems. Also, we use strategic options development and analysis method (SODA) to represent the accommodation problems and to create an agreement between student and staff. This method can help us with achieving goals; because in the same situation, there are different viewpoints for various reasons. By plotting the cognitive maps of involved persons and aggregating all cognitive maps, this methodology reaches us to a consensus. The aggregated cognitive maps are called strategic maps. Finally, with the relational clustering the strategic map, we offer some suggestions to improve the accommodation system in each university.
- 1 October 2013
- Published by American Society of Civil Engineers (ASCE) in Journal of Management in Engineering
- Vol. 29 (4) , 334-344
Compromise Ranking Approach with Bootstrap Confidence Intervals for Risk Assessment in Port Management Projects
Risk management of port projects relies on the sequential analysis of management activities, which results in project-specific responses for reducing risk. Risk assessment has previously been investigated in port projects; however, it is still comparatively neglected due to the complexity of the risk assessment process with nonparametric resampling methods and interval computations. In risk assessment, required data and experts’ judgments often are limited. Moreover, statistical distributions of parameters, which play a significant role, are usually unknown. Hence, traditional approaches do not have enough accuracy to assist such problems. This paper presents a novel compromise ranking approach based on bootstrap confidence intervals for the risk assessment in port projects. The ranking of project risks is obtained through comparison of interval numbers based on bootstrap resampling method according to a new weight of the strategy for the majority of risk assessment criteria and optimism level of ...
- 1 October 2013
- Published by American Society of Civil Engineers (ASCE) in Journal of Management in Engineering
- Vol. 29 (4) , 334-344
Compromise Ranking Approach with Bootstrap Confidence Intervals for Risk Assessment in Port Management Projects
Risk management of port projects relies on the sequential analysis of management activities, which results in project-specific responses for reducing risk. Risk assessment has previously been investigated in port projects; however, it is still comparatively neglected due to the complexity of the risk assessment process with nonparametric resampling methods and interval computations. In risk assessment, required data and experts’ judgments often are limited. Moreover, statistical distributions of parameters, which play a significant role, are usually unknown. Hence, traditional approaches do not have enough accuracy to assist such problems. This paper presents a novel compromise ranking approach based on bootstrap confidence intervals for the risk assessment in port projects. The ranking of project risks is obtained through comparison of interval numbers based on bootstrap resampling method according to a new weight of the strategy for the majority of risk assessment criteria and optimism level of ...