DCDeborah Sater Carstens

Deborah Sater Carstens

*This is an algorithmically generated author record based on publicly available information.

Current Organizations / Institutes

The organizations/institutes from the scholar's latest article


Deborah Sater Carstens has a total of 23 co-authors. Here are the top co-authors by number of shared publications:


Latest Publications

  • Open Access

    Development of Human Factors Framework for BVLOS Operations: A systematic Review of key Human Factors Constructs

    by Vivek Sharma, Umesh Nalla, Lenora Surage, Navya Agasam, Sara Glaser, Rajat Ghimire, Chandana Doppalapudi, Oluwatomisin Olujembola, Deborah Carstens

    Beyond visual line-of-sight (BVLOS) operations will enable UAS operations with extended access to range and capabilities for package delivery, power line inspection, and agricultural surveying. However, BVLOS introduces unique human-centered challenges that differ from those of traditional UAS Operations. Fifty-four percent of the UAS accidents or incidents reported between 2014-2024 had human error as the main contributing factor. The purpose of the current study was: (a) to identify critical human factor constructs relevant to UAS Operations, (b) to map critical human factor constructs to guide future research to enhance safe and efficient BVLOS operations, and (c) to integrate findings from the current literature review into a human factors-based framework to support safe BVLOS operations. Of the 127 articles included in the full review, 93 were included in this study. The following articles revealed six key human factor constructs: Decision Making, Mental Workload, Situational Awareness, Trust in Automation, Display and Interface Design, and Training and Competency. The research gaps within each construct were identified, resulting in the development of future research areas that could enhance the safety and efficiency of BVLOS operations. Finally, a human factors-based framework to support safe BVLOS operations was developed based on the literature review findings.

  • Project Management Tools and Techniques

    by Gary L. Richardson, Deborah Sater Carstens

    The latest edition of this textbook fills a significant void in the realm of project management tools and techniques, where many existing resources fall short. By seamlessly integrating Microsoft Project into the content, students are equipped with the essential skills needed to excel in project management. The addition of screenshots featuring the most up-to-date Microsoft Project software enables readers to effectively visualize and implement the concepts discussed in the textbook. The third edition of Project Management Tools and Techniques: A Practical Guide continues to prepare students for certification exams like the Project Management Professional Exam, ensuring they are well prepared for success in their future careers. This updated edition provides a contemporary perspective on this ever-evolving subject, with five new chapters covering project management and its tools, project variability, critical chain theory, and hybrid models. For both students and instructors, this textbook offers practical examples and videos that bridge the gap between theory and practice in project management. It also includes case studies that provide hands-on experience in applying project management techniques and tools. Lab assignments are included to further enhance learning. For qualified textbook adoptions, a test bank, PowerPoint slides, and sample data are available to support instructors in their teaching endeavors. To enrich the learning experience, this book is accompanied by a dedicated website designed for both students and instructors.

  • Hybrid Conceptual Model

    by Gary L. Richardson, Deborah Sater Carstens

    This chapter describes a conceptual delivery model that deals with the gaps outlined previously in the current waterfall and iterative models. Today's arguments seem more politically based, with agile and waterfall being the typical targets. Both have merits, but both also have shortcomings that must be dealt with. The term hybrid implies some conceptual amalgamation of processes.

  • Creating a Viable Project Plan

    by Gary L. Richardson, Deborah Sater Carstens

    The goal of this chapter is to introduce additional issues that need to be dealt with to complete the project plan. This chapter illustrates various strategies the PM must embrace in customizing the initial plan to fit various constraints or views while keeping the core structure intact. Seven common modification scenarios will be discussed. Resource commitment issues arise when a plan is initially created from the approved scope, but the resulting plan does not fit other constraints. Fast-tracking and crashing are common practices to modify a plan to fit schedule constraints. A major impact on plan viability is created by poor scope definition, errors in task estimates, and excessive scope changes after the initial plan is approved.

  • Critical Chain Model

    by Gary L. Richardson, Deborah Sater Carstens

    This chapter offers an overview of a modeling process that has proven capable of improving delivery cycle times. The Critical Chain model has demonstrated improvement in delivery cycle times of 25% or more. However, the model is not widely recognized. Dr. Eliyahu Goldratt's Theory of Constraints (TOC) 1997 textbook, regarding a methodology of eliminating process constraints, has been translated into a project planning and execution process that utilizes constrained time estimates and work chains. This chapter describes the basic model mechanics and various organizational implementation issues with new processes. Sample project plan construction is shown with a simplified buffer approach.

  • Project Simulation

    by Gary L. Richardson, Deborah Sater Carstens

    This chapter aims to describe a process for forecasting the future behavior of a project-related modeled event using Monte Carlo techniques. In this case, the target is project performance, and the internal variability noted in the project plan. The delivery format is designed to show the probabilistic variability of outcomes. This chapter offers examples intended to demonstrate an improved modeling technique for mapping project performance and forecasting completion dates. The modern beginning of simulation modeling can be traced to the early 1940s as brilliant engineers and scientists worked on the Manhattan Atomic Bomb project.

  • Scope Management

    by Gary L. Richardson, Deborah Sater Carstens

    Scope management can be considered the process of converting a fuzzy vision of a future product or process into a clear understanding of that vision's attributes and defining the technical work required to produce the item. The terms “alignment” and “elaboration” are introduced here as key vocabulary concepts in project selection and definition. Also, the role of a WBS is the most important artifact for the project planning and control roles.

  • Introduction to Project Management and Its Tools

    by Gary L. Richardson, Deborah Sater Carstens

    The project environment has many factors that are difficult to control, such as scope definition, task estimating, risk, resource availability, and team productivity. The four stages of project management are discussed. A thorough discussion of the evolution of project management is explained in this chapter.

  • Developing the Project Schedule

    by Gary L. Richardson, Deborah Sater Carstens

    This chapter describes the process of developing a first-cut project schedule based on WBS specifications. Estimating involves specifications for resources, durations, and costs related to the incoming work description. Various estimating techniques are covered, and the mechanics of network calculations are shown. Then, the automated process for doing the same calculations is demonstrated. Finally, a small but realistic project specification is translated into a first-cut project plan from the estimated parameters described in the chapter.

  • Gaining Support for a Project

    by Gary L. Richardson, Deborah Sater Carstens

    This chapter discusses the process to initiate a project. This includes getting stakeholder support. The chapter also describes the approach to launching a new project. Furthermore, the project charter's purpose and components are discussed.